Tamil Nadu Generation And Distribution Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Civil And Construction
Building Construction
Eprocure
Opening Date15 Nov 2024
Closing Soon3 Dec 2024
Tender Amount₹ 10,39,500
Costs
EMD
₹ 10,400Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Construction Of Sump Water Line Replacement Of Ac Sheet Roofing Sheet Providing Flooring Tiles At Ae Spl Building And Partition Wall Rest Room For Gents Ladies In C.o Premises At Erode.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_EB_501478_1Tender No
SE/EEDC/ED Specification No.18/2024-25Tender Authority
Tamil Nadu Generation And Distribution Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
construction of sump water line replacement of AC sheet roofing sheet providing flooring tiles at AE Spl building and partition wall rest room for Gents Ladies in C.O premises at Erode.
construction of sump water line replacement of AC sheet roofing sheet providing flooring tiles at AE Spl building and partition wall rest room for Gents Ladies in C.O premises at Erode. PRICE BID
BOQ Items
Filling with M- sand for filling the foundation and floor including sand, filling charges, with all leads and lifts, watering, consolidation etc., complete.
1.7
-
-
Plain cement concrete in CC 1:3:6, using 40mm HBG metal including cost of cement, all materials, labour charges including consolidation, curing, all leads, lifts, as per standard specification etc., complete.
1.7
-
-
Fly ash brick work in C.M. 1:3 using fly ash bricks for Sump wall including, cost of cement, water proof compound, all materials, labour, curing, all leads and lifts, as per standard specification, etc., complete.
11.5
-
-
Reinforced cement concrete in C.C. 1:1 ½ :3 mix using 12 to 20mm HBG machine crushed metal for Sump Slab concrete including cost of cement, cost of water proofing compound, all materials, labour, curing, vibration charges, without shuttering all leads, lifts, as per standard specification, etc., complete. (but excluding cost of steel reinforcement.)
1.3
-
-
Providing steel reinforcement MS/RTS rods for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, labour charges for cutting, straightening bending as per type design drawing, placing aligning, and tying properly with all leads and lift as per standard specification, etc., complete.
150
-
-
Plastering with CM 1:3 12 mm thick for Ceiling, and Sump inner wall including cost of cement, cost of water proof compound, labour, curing, all leads and lifts etc., complete as per standard specification..
75
-
-
Painting two coats with ready mixed plastic emulsion of first class quality paint and of approved colour over a priming coat, including cost of all materials, Labour, Lead, Lift etc., complete.
21
-
-
Supplying and fixing of 50 mm dia UPVC pipe (shedule 40)of appd. Quality for water supply line from water sump and delivery line including cost of pipe, bend, elbow, labour for cutting, threading, and fixing in position, testing all materials, solution, lead, lift etc., complete.
60
-
-
Supplying and fixing of 50 mm dia Gun Metal Gate Valve ( Heavy Duty ) of ISI make and approved quality for water supply line including labour, lead, lift and fixing in position etc., complete.
2
-
-
Supplying and fixing of 50mm GM Non return value including transporting, labour, lead, lift and fixing in position etc., complete.
1
-
-
Supplying and fixing of 2.5X3 core submersible cable including cost of all materials,erection charges, lead, lift, etc, complete.
60
-
-
Providing SFRC man hole cover of size 900mm x 900 mm cover of heavy duty with frame including cost of all materials, labour, all lead, lift, as per standard specification , etc., complete.`
1
-
-
Labour charge for Releasing and refixing of submersible open well motor with starter including transporting, labour, lead, lift and fixing in position etc., complete.
1
-
-
Labour charges for Excess excavated earth removed from site loading to tractor and unloading including cost of all major and minor T&P's, transporting charges, labour charges, leads, lifts, etc., complete.
92
-
-
Supplying and fixing of 50 mm Dia UPVC union of ISI make and approved quality for water supply line including labour, lead, lift and fixing in position etc., complete.
3
-
-
Supplying and fixing of 25 mm Dia PVC pipe 10kg/cm2 of ISI make and approved quality for laying of cable line including labour, lead, lift and fixing in position etc., complete.
60
-
-
Dismantling,Clearing away the Existing brick roof pattai wall in cement mortar including scaffoling labour charges lead & lift etc complete.
0.3
-
-
Dismantling,Clearing away the Existing PCC roof pattai wall in cement mortar including scaffoling labour charges lead & lift etc complete.
0.9
-
-
Labour charges for cutting and clean removal of cement plaster from wall and racking out joints 50mm deep and width of 50mm for resting of roofsheet above sunshade wall and Plastering 1:2, 12 mm thick for roofing sheet restin wall top and bottom including the cost of all material, scaffolding charges, cement, labour charges, all leads, lifts as per standard specification.
8
-
-
Labour charges for releasing the existing Wiring with continuous earth wire connection of 14 SWG TC wire for open PVC light point /fan point including cost of labour, leads, lifts,etc complete
9
-
-
Labour charges for releasing and Refixing the existing light fitting with pendent rod including cost of labour, leads, lifts,etc complete
6
-
-
Labour charges for releasing and Refixing the existing A/C ceiling Fan fitting with pendent rod including cost of labour, leads, lifts,etc complete
2
-
-
Dismantling,Clearing away and carefully stacking the Existing Hard board sheet false ceiling with timbers and removing wooden scraps are devoluted to central store (All scarps Devolution of this work is fully contractor scope)including scaffoling labour charges lead & lift etc complete.
39.5
-
-
Dismantling,Clearing away and carefully stacking the Existing AC sheet roofing with out roof timbers including scaffoling labour charges lead & lift etc complete.
48.5
-
-
Supplying and fixing of MS structural steel section (ISI) suitable for supporting the metal roofing sheet for Ae SPL main.roof including cost of all materials, labour charges, with enamel painting two coats over one coat of primeing etc complete
185
-
-
Supplying and fixing of SKY TECH Heat and sound proof roofing sheet over MS structural section with necessary screws with washer including cost of all materials, labour for fixing lead, lift, etc complete.
48.5
-
-
FLY ASH Brick work in CM 1:5 using for cable wall in Ae SPL office including cost of all materials, labour charges, curing scaffolding charges, curing all leads and lifts etc., complete and as directed by Engineer.
0.3
-
-
Painting Two coats old iron work with enamel paint including cost of all materials labour charges, all leads and lifts etc., complete and as directed by Engineer at site
25
-
-
Wiring with 2 x 1.5 Sq.mm PVC insulated single core unseathed copper conductor Cable of 1100V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories and with GI switch box in flush with wall with continuous earth line connection of 1.5 Sqmm wire and 6 A Switch 1 Module of open light point /Fan point. SD
9
-
-
Colour washing two coats with ready mixed plastic emulsion of first class quality paint and of approved colour over a priming coat, including applying wall putty wherever required cost of all materials, scaffolding, Labour, Lead, Lift etc., complete.
146
-
-
Supplying and fixing of 20w 4’ Feet LED fitting with LED including cost of all materials, labour, lead, lift etc complete (philips/Crompton make).
6
-
-
Providing false ceiling with POP pvc laminated on bottom and aluminium Fril sheet on top sheet of size 595mmx595mm x7.5mm thick over the grid channel by using main Tangle 11/4" cross T angle and wall side Langle including cost of all materials, labour,lead,lift etc complete
39.5
-
-
Supplying and fixing of 1200mm (48”) sweep AC ceiling fan with 300 / 600 mm down rod with appd best quality make of standard specification with electronic regulators and switch including cost of all materials, labour, fixing, charges as per standard specification, etc., complete. (Make :Phl/ Crompton)
1
-
-
Supplying and fixing of modular socket 6A 3pin -4 Nos and male top 1 No with 4 Nos switch with Frame with cover as per standard specification including cost of all materials, labour, lead, lift, etc complete.
2
-
-
Supplying and fixing 5.5mm tk plain glass for steel windows for spl manitance old building window frame including cost of all materials, labour, lead, lift scaffolding charges, etc., complete.
1.85
-
-
Dismantling and Re fixing existing Aluminium partition including cost of all materials rubber beading, aluminium cleat angles including labour charges, transport cost minor T&P's lead lift etc complete.
18.5
-
-
Labour charge for chipping & roughening the cement flooring & washing of plastered surface with soap, soda and water, Supplying and laying of Double Charged Vitrified tiles of size 600X600X8mm approved quality and colour with ISI std and tiles laying is using paste, pointing with filling materials using 0.40kg/m2 including finishing the joint and pointing flush with tilesurface including cost of all materials, lead, lift, labour, curing etc., complete as directed by the engineer at site.
39.45
-
-
Fly ash Brick work in CM 1:2 using class II bricks for partition walls including cost of all materials, labour charges, curing scaffolding charges, curing all leads and lifts etc., complete and as directed by Engineer.
3.8
-
-
Wall Plastering 1:3, 12 mm thick on both sides of brick wall after electrical piping work including the cost of all material, scaffolding charges, cement, labour charges, all leads, lifts, as per standard specification. (2nd floor)
68
-
-
Dadooing walls with glazed tiles 150mmx150mmx6mm of approved colour and make quality of ISI mark, laid in CM 1:2, 10mm thick Providing and filling the tile joint with epoxy grout with following specification: Surface preparation includingcleaning the joint to be free from dust and loose particles. Providing masking tape on either side of the tile joint edges and providing sealing the tile gap with epoxy tile joint grout and finishing neatly and as directed by the departmental officers. including cost of cement, all materials, labour, curing, all leads, and lifts, etc., complete as per standard specification.
82
-
-
Supplying and fixing of WPC door shutter with WPC Door frames of sizes (0.75 x2.10m) including cost of all materials, lead, lift, transport, labour charges etc, complete as directed by Board Engineer at site.
9
-
-
Supplying and fixing white marble slab double side polished ( Agenda) 18mm to 20mm thick cost of all materials, transporting, leads and lift etc., complete
1.45
-
-
Cleaning 'V' groove all along the tile joints cleaning and filling Epoxy based tile joint filler with Rainbow Tilemate epoxy (ROFF) with labour charges, all leads and lifts etc., complete.
111
-
-
GST
-
-
-
SGST For bidders within Tamilnadu
1
-
-
CGST For Bidders within Tamilnadu
1
-
-
IGST For Bidders outside of Tamilnadu
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%