Tamil Nadu Generation And Distribution Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Electrical and Electronics
Eprocure
Opening Date3 Feb 2021
Closing Date16 Feb 2021
Tender AmountRefer Documents
Costs
EMD
₹ 24,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Se/kedc/kanchipuram/ Spec No 48 /20- 21/dt.02.02.21
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_EB_193440_1Bid Award Id
ViewTender No
SE/KEDC/KANCHIPURAM/ Spec No 48 /20- 21/dt.02.02.2Tender Authority
Tamil Nadu Generation And Distribution Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Structure pole mass Concreting and coping 0.6x06x1.65 for DP structure Including cost of all the materials and cement.
1
-
-
... More
Erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing. DPDC channel, T.I. Fitting etc., complete including transporting of structure materials.
1
-
-
... More
Excavation of stay pit 0.95x0.60x1.5m and erection of stay set complete
1
-
-
... More
Sleeve concrete for stay set including all materials
1
-
-
... More
Erection of HG fuse set including transport
1
-
-
... More
Erection of 11 KV AB switch complete set including transport.
1
-
-
... More
Transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., complete including cost of coal and salt,with trough
1
-
-
... More
Transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., complete including cost of coal and salt,without trough
1
-
-
... More
Erection of Aluminium bus bar pipe complete for H.T. Bus bar arrangements for DP Structure
1
-
-
... More
Erection of L.T. Open type fuse unit including cable jumpering upto the line.
1
-
-
... More
Providing LT bus bar arrangements/ cable in DT structure including fixing of cross arm and insulator.
1
-
-
... More
Erection of H.T. jumpering in DP structure complete
1
-
-
... More
Erection of H.T. LAS
1
-
-
... More
Erection of L.T. LAS
1
-
-
... More
Erection of Distribution Transformer Upto 100 KVA
1
-
-
... More
Erection of Distribution Transformer Above 100KVA
1
-
-
... More
Painting of two coats of Aluminium paints for Transformers structure and iron materials including cost of paint and painting of structure pole with distemper including cost of materials etc.
1
-
-
... More
Loading and unloading of Distribution Transformer at site and store.
1
-
-
... More
Dismantling of failed Distribution Transformer from the structure including removing HT & LT connection and all other incidental works. (excluding loading and unloading)Upto 100 KVA
1
-
-
... More
Dismantling of failed Distribution Transformer from the structure including removing HT & LT connection and all other incidental works. (excluding loading and unloading)Above 100KVA
1
-
-
... More
Crane hire charges
1
-
-
... More
Normal Road (earth)
1
-
-
... More
Tar Road
1
-
-
... More
Concrete Road
1
-
-
... More
Transporting of 11 KV HT cable from departmental stores to work spot by engaging private vehicle including recoiling ,coiling and loading and unloading at both sites. 3x300 sq mm XLPE (1 drum: 200 m)
1
-
-
... More
Transporting of 11 KV HT cable from departmental stores to work spot by engaging private vehicle including recoiling ,coiling and loading and unloading at both sites. 3x120 sq mm XLPE (1 drum: 200 m)
1
-
-
... More
Laying of 300 sq mm XLPE cable
1
-
-
... More
Laying of 120 sq mm XLPE cable
1
-
-
... More
Laying of 240 sq.mm cable
1
-
-
... More
Laying of 120 sq.mm XPLE cable
1
-
-
... More
Laying of 25 sq.mm cable
1
-
-
... More
Laying of 16 sq.mm cable
1
-
-
... More
Erection of RCC/RSJ/PSC pole and other poles including excavation of pole pit (pit size 2'x3'x1/6th of the length of poles)
1
-
-
... More
Excavation of pole pit for 7.5/8 meters
1
-
-
... More
Erection of pole pit for7.5/8 meters
1
-
-
... More
Excavaion of pole pit for 9.0/9.14 meters
1
-
-
... More
Erection of pole pit for /9.0/9.14 meters
1
-
-
... More
Erection of base plate
1
-
-
... More
Erection of V cross arm 3 1/2' size
1
-
-
... More
Erection of V cross arm 4 1/2' size
1
-
-
... More
Erection of Tapping channel 5 ' size
1
-
-
... More
Fixing of 11 KV TI fitting
1
-
-
... More
Fixing of 33 KV TI fitting
1
-
-
... More
Fixing of LT 3 phase cross arm
1
-
-
... More
Fixing of LTTI fitting
1
-
-
... More
Fixing of single phase cross arm
1
-
-
... More
Fixing of LT pin insulator with pin
1
-
-
... More
Fixing of LT shackle with strap sets
1
-
-
... More
Fixing of 11 KV pin insulator with GI pin
1
-
-
... More
Fixing of 33 KV pin insulator with GI pin
1
-
-
... More
Fixing of 11 KV strain disc with metal parts
1
-
-
... More
Fixing of 33 KV strain disc with metal parts
1
-
-
... More
Fixing of Aluminium knob
1
-
-
... More
Providing of fly stay (excluding pole erection and earth excavation)
1
-
-
... More
Concreting of poles with 1:4:8 mix, 1.1/2 broken metal jelly and M sand including coping (M sand, jelly and cement, will be supplied by the contractor)(with coping of 1' dia upto height of 1.1/2' above and 1' below ground level)7.5 meters/8 meters pole
1
-
-
... More
Concreting of poles with 1:4:8 mix, 1.1/2 broken metal jelly and M sand including coping (M sand, jelly and cement, will be supplied by the contractor)(with coping of 1' dia upto height of 1.1/2' above and 1' below ground level)9.0/ 9.14 meters pole
1
-
-
... More
Earthing of poles
1
-
-
... More
Paving out conductor, stringing and sagging of line of all sizes of ACSR / AAAC conductors of HT/LT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. Upto 7/2.59 mm ACSR/7/2.50 AAAC
1
-
-
... More
Paving out conductor, stringing and sagging of line of all sizes of ACSR / AAAC conductors of HT/LT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. Upto 7/3.35 mm ACSR/7/3.15 AAAC
1
-
-
... More
Paving out conductor, stringing and sagging of line of all sizes of ACSR / AAAC conductors of HT/LT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. Raccoon 7/4.09
1
-
-
... More
Paving out conductor, stringing and sagging of line of all sizes of ACSR / AAAC conductors of HT/LT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. Dog conductor 7/4.72
1
-
-
... More
Numbering of location/each including cost of paint and labour
1
-
-
... More
Providing of guarding per span excluding of stay set erection
1
-
-
... More
Providing of 2 wire flat guarding(Split neutral grounding)
1
-
-
... More
Providing of 4 wire flat guarding
1
-
-
... More
Providing of Craddle guarding including earthing and earth pit excavation
1
-
-
... More
Erection of cross bracing set 10' Centre
1
-
-
... More
Erection of cross bracing set 15' Centre
1
-
-
... More
Erection of cross bracing set 10' Centre
1
-
-
... More
Erection of cross bracing set 15' Centre
1
-
-
... More
Erection of 33 KV centre rotating AB switch complete set
1
-
-
... More
Erection of 11 KV centre rotating AB switch complete set
1
-
-
... More
Erection of spacers & jumpers Single phase
1
-
-
... More
Erection of spacers & jumpers Three phase
1
-
-
... More
Erection of spacers & jumpers Provision of Paa jumpers
1
-
-
... More
Metering set loading and unloading
1
-
-
... More
Loading / unloading of poles 7.5/8 meters pole (RCC/PSC)/Each
1
-
-
... More
Loading / unloading of poles 9.14 meters pole RCC /9.0 mtr PSC/9.14 RSJ /Each
1
-
-
... More
Loading / unloading of poles Conductor drum of all sizes with conductor
1
-
-
... More
Loading / unloading of poles Conductor drum of all sizes without conductor
1
-
-
... More
Un Loading / unloading of poles Conductor drum of all sizes with conductor
1
-
-
... More
Un Loading / unloading of poles Conductor drum of all sizes without conductor
1
-
-
... More
Erection of metering sets
1
-
-
... More
channels/Flats/Angle
1
-
-
... More
Cutting of Channel/Flat/Angle
1
-
-
... More
Cutting of RSJ pole cutting
1
-
-
... More
Cutting of Tubular pole cutting
1
-
-
... More
Cutting of Rail pole cutting
1
-
-
... More
Alteration of clamps
1
-
-
... More
Maintenance of DT structure for various capacity (pole mounted structure) DP Structure maintenance
1
-
-
... More
Maintenance of DT structure for various capacity (pole mounted structure) TP Structure maintenance
1
-
-
... More
Maintenance of DT structure for various capacity (pole mounted structure) 4P Structure maintenance
1
-
-
... More
Maintenance of DT structure for various capacity (pole mounted structure) DT maintenance
1
-
-
... More
Maintenance of DT structure for various capacity (pole mounted structure) Structure earthing redoing
1
-
-
... More
Maintenance of DT structure for various capacity (pole mounted structure) Replacement & Structure earthing complete including earthing with 3 pipes
1
-
-
... More
Yard cleaning
1
-
-
... More
Watering earth pits
1
-
-
... More
Maintenance of 11 KV AB Switches only. (Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating).
1
-
-
... More
Maintenance of 33 KV ABS only. (Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating).
1
-
-
... More
Tree clearance(3' on either side of line and open to sky)
1
-
-
... More
Tree Clearence Pin Point location
1
-
-
... More
Tree Clearence Cut Point Location
1
-
-
... More
Re-sagging (HT) 7/4.72 mm
1
-
-
... More
Re-sagging (HT) 7/4.09 mm
1
-
-
... More
Re-sagging (HT<) 7/3.35 mm and 7/3.15 mm
1
-
-
... More
Re-sagging (HT<) 7/2.59 mm and 7/2.50 mm
1
-
-
... More
Dismantling of poles 7.5m/8.0m Poles
1
-
-
... More
Dismantling of poles 9.0/ 9.14 Mtr. Poles/RSJ/Tubular Poles
1
-
-
... More
Dismantling of Stay set complete
1
-
-
... More
Dismantling of conductors upto 7/2.59 MM including Coiling and Transporting from workspot to store
1
-
-
... More
Dismantling of conductors 7/3.35 MM and above including Coiling and Transporting from workspot to store
1
-
-
... More
Releasing of TI Fitting
1
-
-
... More
Releasing of LT S ph "X" Arm/TI Fitting
1
-
-
... More
Relaasing of LT 3 ph "X" Arm
1
-
-
... More
Releasing of 3' - 6" "V" Cross Arm/Tapping channal/Guarding "X" Arm
1
-
-
... More
Releasing of 4' - 6" and "V" Cross Arm
1
-
-
... More
Releasing of 5' "V" Cross Arm
1
-
-
... More
Dismantling of Transformer Structure materials
1
-
-
... More
Dismantling of AB Switch at D.T.Structure
1
-
-
... More
Dismantling of H.G. fuse set
1
-
-
... More
Dismantling of HT LAS at DT Structure
1
-
-
... More
Dismantling of LT LAS at DT Structure
1
-
-
... More
Dismantling of Open type fuse unit with all wiring complete
1
-
-
... More
Dismantling of cross bracing set(10' centre)
1
-
-
... More
Dismantling of cross bracing set(15' centre)
1
-
-
... More
Dismantling of Top Channel (10' centre)
1
-
-
... More
Dismantling of Top Channel (15' centre)
1
-
-
... More
Dismantling of Guarding including Dismantling of cross arm per span
1
-
-
... More
Breaking of RCC Damaged Poles after dismantling, relesing the grill including transporting to Road side
1
-
-
... More
Stacking materials/Scrap
1
-
-
... More
Cleaning of 110 KV Breakers including CTs and allied maintenance work
1
-
-
... More
Cleaning of 110 KV LAS
1
-
-
... More
Cleaning of 110 KV AB switch and applying petroleum jelly
1
-
-
... More
Cleaning of 110 KV Power transformer insulators and assisiting for all other maintenance works
1
-
-
... More
Cleaning of 33 KV/11 KV Breakers and CTS and allied maintenance works
1
-
-
... More
Cleaning and checking of 110 KV Bus insulators
1
-
-
... More
Cleaning and checking of 33 KV/11 KV AB switches including tightening of bolt and nut and applying Petroleum jelly
1
-
-
... More
Releasing and refixing of clamp in 110 KV / 33 KV / 11 KV buses
1
-
-
... More
Maintenance of 110 KV ABS only. (Checking of alignment and replacement of wornout fixed and moving contacts, and Lubricating).
1
-
-
... More
Removing weed in Substation/Office premises per sq.mtr(Jungle Clearance)
1
-
-
... More
ERECTION OF SINGLE POLE DT STRUCTURE Ground leveling and Bush clearing
1
-
-
... More
ERECTION OF SINGLE POLE DT STRUCTURE Loading of 9mtr/9.14mtr RCC/PSC pole
1
-
-
... More
ERECTION OF SINGLE POLE DT STRUCTURE Unloading of 9mtr/9.14mtr RCC/PSC pole
1
-
-
... More
ERECTION OF SINGLE POLE DT STRUCTURE Labour and transporting of 9mtr/9.14mtr RCC/PSC pole upto 5KMs
1
-
-
... More
ERECTION OF SINGLE POLE DT STRUCTURE Loading and unloading line of materials including stacking
1
-
-
... More
ERECTION OF SINGLE POLE DT STRUCTURE Transporting of line materials from office to work spot
1
-
-
... More
ERECTION OF SINGLE POLE DT STRUCTURE Excavationof Pole pit per size 3'x 3'x6'
1
-
-
... More
Erection of 9mtr/9.14mtr RCC/PSC pole including baseplate
1
-
-
... More
ERECTION OF SINGLE POLE DT STRUCTURE Excavation of stay pit per size 2'x 2'x6'
1
-
-
... More
ERECTION OF SINGLE POLE DT STRUCTURE Erection of stayset including baseplate
1
-
-
... More
ERECTION OF SINGLE POLE DT STRUCTURE Earthing of structure complete set with 3Nos earth pits excavation including providing 3nos earthpipe of size 40mmx3mtr(GI Pipe), pit size 2'x2'x2' filled with mixture of sand, charcoal and common salt in equal proportion to to depth of 1.25' and 1"jelly to a depth of 9", earth connection to be provided with GI wire,plates and bolts and Nuts.(Except 3Nos earth pipe with GI wire, plates and bolts and nuts all other materials to be supplied by Board)
1
-
-
... More
Erection of Transformer structure materials including transporting from road side to work spot per set
1
-
-
... More
Erection of 11KV AB Switch set including transporting from road side to work spot. Per set
1
-
-
... More
Erection of HG Fuse set including transporting from road side to work spot. Per set
1
-
-
... More
Mass concreting of pole with 1;4:8 mix 1/2 broken metal jelly, cement and river sand including coping. (Size height of pole).(as per civil rate) all materials will be supplied by contractor. For 2poles
1
-
-
... More
Erection of HT LAS 3Nos
1
-
-
... More
Erection of LT LAS 3Nos
1
-
-
... More
Painting of transformer structure including cost of paint , brush etc., (1.one coat of red oxide paint in all iron materials, 2.colour washing of 2nos structure poles, 3.painting of transformers, and all iron items with aluminium paint)
1
-
-
... More
Erection of LT opentype arrangements including running LT bus and jumpering complete (Both sides)
1
-
-
... More
Unloading and erection of DT at Site (Excluding loading)
1
-
-
... More
Name plate painting and lettering of transformer details including cost of materials and labour
1
-
-
... More
Sub Total
1
-
-
... More
EPF @ 13.36% to be entered by bidder
13.36
-
-
... More
ESI @ 3.25% to be entered by bidder
3.25
-
-
Evaluation Notes How It Works ?