Tamil Nadu Generation And Distribution Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender

Electrical and Maintenance Works
Eprocure
Opening Date25 Feb 2021
Closing Date29 Mar 2021
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Hvac System-dismantling Of Defective Condenser Coil In The Centralised Ac Unit #03 In The Main Control Building- Providing Of New 50tr Condenser Module

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Charges for Installation of new 50TR condenser coil module (Consisting of 4 Nos. Coil) in the 50TR Centralized AC Unit #03: This work involves preparing the existing frame structure for erecting new coils by grinding & welding; Providing holes in the coil frame for fixing with frame and cover plates; Lifting the 4 Nos. of coil one by one by using lifting tackles;Positioning in the existing MS Structure frame; Stitch welding with the structure for rigid fixing; Fixing the outer cover plate and welding with the MS Frame; Positioning 4 Nos. of Condenser fan unit in the system as per the direction of Engineer in-charge.

1

-

-

... More
Charges for providing vapour line and liquid line net work pipe lines. This work involves connecting the vapour line from compressor discharge header to condenser coil module; Connecting the liquid line from each coil to the common condenser out let line by bracing/welding after alignment and edge preparation about 48 Nos. of Joints size of 25mm (Bend/Elbow/Socket).

1

-

-

... More
Charges for Installation of refrigerant receiver tank with isolation valve arrangements: This work involves to modify the over sized refrigerant receiver tank which is availble in the Pocket Store as per our system requirement; Fabricate inlet and out let connection for providing isolation valves; Provision to fix Pressure gauge , Safety relief valve, Etc. Fixing the receiver tank in the bed frame of 50TR AC System with additional support arrangements.

1

-

-

... More
Charges for installation of MS C Class refrigerant pipe with Specials: This work involves complete installation of MS C class pipe size of 50 NB with Elbow and Tee ; 1 No. Y Strainer along with two isolation valves, Suction line isolation valve , inlet outlet valves each 1 No. for refrigerant receiver tank by welding/Bracing

1

-

-

... More
Charges for N2 pressure testing , vacuum creating in the refrigerant system: This work involves charging of Nitrogen gas in the aircondition system upto 1.25 times of operating pressure; holding the pressure for 6 hours; Checking for any leak in the bracing/welding Joints; Complete releasing the stored nitrogen gas in the system and attending leak by bracing/welding; Repeat the leak testing procedure; Create Vacuum in the entire system and charging with R22 gas , testing and normalizing as per the direction Engineer in-charge.

1

-

-

... More
Charges for providing temporary platform in the working area for the entire work period.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.