Tamil Nadu Generation And Distribution Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender

Civil And Construction
Eprocure
Opening Date16 Feb 2019
Closing Date27 Feb 2019
Tender Amount₹ 14,76,665 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
GI Pipe 160 mm dia (6 mtr. Length)

12

-

-

... More
Cable Marker for route and joint location

30

-

-

... More
Danger Board cum Name Board (500x200mmx16swg)

8

-

-

... More
UG Cable Work

-

-

-

... More
Earthwork excavation 1.2 Mt.average Depth X 0.6mt average width in hard stiff clay, shales murran gravel, stoney earth and mixed with small sizes boulders and gravelly soil for sand bedding as directed by the Engineer-in-charge at site and including providing labour for watching over the excavated trench during day and night to avoid any accident caused to animal and human being including cost of signal board, danger light, lead and lift etc., complete excluding blacktopping and including trial pits charges

1065.6

-

-

... More
Labour charges for removing of black topping portion of 0.6mt average width by using chisel, hammer and pick axe and including cost of signal board and danger light and providing watch and ward staff to prevent any accident caused to the cattle and human beings including sharpening charges of chisel and including excavation of road cutting using JCB/Air compressor Drill at Day and Night time and avoiding any damage to the telecom and water lines etc (Along the Road) including trial pits

266.4

-

-

... More
Providing sand bedding with good quality of Manufactured Sand to a depth of 0.15m in the excavated cable trench including cost of sand, labour, and labour charges for transport,lead, lift, etc., complete

133.2

-

-

... More
Loading of HT cable drum from stores using crane Lorry, safe transportng to site and safe unloading at the worksite without any damage using crane lorry.This includes labour for loading, unloading, transporting and rent for crane lorry, all T&P such as crowbars,DShackle etc., that must be brought by the contractor.

8

-

-

... More
Drawal from stores and Laying of R.C.C."V" Troughs in th excavated cable trench at Worksite including transportation without any damage .This includes all Lead, Lift , Safe loading, Safe unloading and transport etc. ( Note: Damage if any due to careless handling, the cost of V trough will be be deducted)

1973

-

-

... More
Refilling the cable trench and duct with excavated earth in layer,ramming and consolidating properly in layers of 6" and the top surface brought in line with the existing surface including labour, lead, lift etc., complete

133.2

-

-

... More
Fixing of cable termination including supply of clamp at 3 locations along the structure after completion of termination joint.Termination joint will be done by cable jointer separately.But this includes releasing of cable drum from the cable pit/ structure ,providing and releasing of tent,transporting of tent from office to site and back fixing the cable at structure and back filling the cable pit etc.

8

-

-

... More
Excavation of pit (for providing Straight joint) of size 3.6 M X 2.4 M X 1.3 M and excavation of cable trench for 3 M on either side of the joint location for releasing the cable.This includes labour for providing and releasing of tent at joint location, transporting of tent from office to site and back, removing and refixing of "V" troughs, fixing the joint works &carefully fixing the joint in position after completing of jointing and refilling the trench with the excavated soil.

4

-

-

... More
Labour for loading,Unloading of iron scrap in Lorry/Drum for devolution(The Scrap may be devoluted by the department Lorry)

8

-

-

... More
Erection of Class B GI/PVC pipes 160 mm dia for encasing the HT Cable at termination structure and P&T Crossing etc. ( Note: Normally PVC Pipes will be used for termination structure. Only in specific locations the GI pipe will be used as per the advise of site engineer incharge)

8

-

-

... More
Erection of 160 mm dia ISI PVC Pipe for Road and Drainage crossing for the HT Cable laying ( Note: Normally PVC Pipes will be used for termination structure. Only in specific locations the GI pipe will be used as per the advice of site engineer incharge)

12

-

-

... More
Loading, unloading ,transporting and erection of RCC Cable marker of standard size including painting the word " TNEB/ UG CABLE" and other notations as per the site Engineers instruction. (Includes excavation and laying)

30

-

-

... More
Erection of 33 KV 3C x 400 Sq.mm XLPE UG Cable Outdoor End termination Kit-Heat shrinkable type,including charges for cable jointer.

8

-

-

... More
Erection of 33 KV 3C x 400 Sq.mm XLPE UG Cable Straight Joint Kit-Heat shrinkable type,including charges for cable jointer.

4

-

-

... More
Laying of P.C.C. 1:3:6 by using 20 mm HBG metal for on casing PVC/GI pipes in the Road crossing and streets in cable duct and other places wherever necessary including cost of all materials,lead, lift,labour charges, watch and ward, dangerboard, light, signal board etc.

1.08

-

-

... More
Actual labour for Double Pole with AB switch Structure Erection at various locations of proposed Vellalapatty 22 KV feeder of Karuppur110/22KV SS

-

-

-

... More
Loading of poles upto 30' / RSJ pole

16

-

-

... More
Unloading of poles upto 30' / RSJ pole

16

-

-

... More
Excavation of Pole pit of size 2'x2'x6' upto 9.14mtr pole by using JCB or Manual

16

-

-

... More
Excavation of Stay Pit 4.5' to 5' depth by using JCB or Manual

16

-

-

... More
Erection of RCC poles /metal poles upto 30" (9.14m)pole by using JCB or Manual

16

-

-

... More
Erection of Stay set complete

16

-

-

... More
Fixing of HT "V" cross arms / Channel cross arms / Guarding cross arms

24

-

-

... More
Fixing of HT TI Fittings

16

-

-

... More
Fixing of HT Pin Insulators 22 KV

24

-

-

... More
Fixing of HT 11 KV strain Disc

48

-

-

... More
Erection of 10" Centre Top Channel

16

-

-

... More
Erection of 22KV AB Switch

8

-

-

... More
Erection of Cross Bracing Set 10' centre with Clamp

8

-

-

... More
HT Jumpering Arrangement

8

-

-

... More
Erection of Aluminium Bus Bar 1.5" Dia of 10' length

24

-

-

... More
Erection of HT LAS

24

-

-

... More
Numbering of pole by using distemper including cost of paint and painting charges

16

-

-

... More
Painting of Cement Poles by using distemper (Single Coat) including paint charges

16

-

-

... More
Painting of all clamps and alied structure materials newly erected

8

-

-

... More
Concreting of poles with size 2'x2'x6' including cost of jelly, Sand and Cement (With supply) with a mixture of 1:3:6 along Sleeve concreting and plastering of concrete with ratio 1:2

16

-

-

... More
Stay concreting

16

-

-

... More
Structure Earthing Complete with erection of three pit and looping etc

24

-

-

... More
Erection of DangerBoard / Name board

8

-

-

... More
Alteration of clamps (Back Clamps/Stay Clamps)

232

-

-

... More
TRANSPORTATION

-

-

-

... More
Transporting of Materials/ Conductors and other materials (Excluding loading and unloading charges) upto 8 Kms from Stores to Road Side

16

-

-

... More
Transporting of Materials/ Conductors and other materials (Excluding loading and unloading charges) above 8 Kms (Additional per KM) from Stores to Road Side - Upto 50Km

16

-

-

... More
Transporting of poles above size 27' from road site to pole pit (Excluding loading and unloading of poles ) by using JCB or Manual

16

-

-

... More
Transporting of poles above size 27' from road site to pole pit (Excluding loading and unloading of poles ) by using JCB or Manual above 8Km ( Additional per KM) Upto 50Km

16

-

-

... More
IPDS scheme labour Estimate for Erection of HT lines for proposed 22KV Vellalapatty feeder bifurcating existing Sengaradu 22KV feeder fed by 110/22KV Karuppur SS in respect of Karuppur section.

-

-

-

... More
EXCAVATION

-

-

-

... More
Excavation of Pole pit of size 2'x2'x6' upto 9.14mtr pole by using JCB or Manual

71

-

-

... More
Excavation of Stay Pit 4.5' to 5' depth by using JCB or Manual

41

-

-

... More
Excavation of Pole Earthing Pit 4.5' to 5' depth by using JCB or Manual

65

-

-

... More
ERECTION OF POLES and other line materials

-

-

-

... More
Erection of RCC poles /metal poles upto 30" (9.14m)pole by using JCB or Manual

71

-

-

... More
Erection of Stay set complete

41

-

-

... More
Fixing of HT "V" cross arms / Channel cross arms / Guarding cross arms

99

-

-

... More
Fixing of HT/LT TI Fittings

69

-

-

... More
Fixing of LT S Phase cross arms

25

-

-

... More
Fixing of HT Pin Insulators 22 KV

174

-

-

... More
Fixing of HT 11 KV strain disc

324

-

-

... More
Fixing of Knob

22

-

-

... More
Earthing of Pole with pit including burying, looping and binding

65

-

-

... More
Loading and Unloading of Poles

-

-

-

... More
Loading of poles upto 30' / RSJ pole

71

-

-

... More
Unloading of poles upto 30' / RSJ pole

71

-

-

... More
Paving and Stringing of Conductor

-

-

-

... More
Paving of Conductor, Stringing, binding, jumpering etc., complete with ACSR for both HT/LT lines with 7/4.09 mm, 7/3.35 mm ACSR or 7/3.0 mm AAAC

213

-

-

... More
Base concreting

65

-

-

... More
Stay concreting

41

-

-

... More
TRANSPORTION

-

-

-

... More
Transporting of Materials/ Conductors and other materials (Excluding loading and unloading charges) upto 8 Kms from Stores to Road Side

20

-

-

... More
Transporting of poles 9 m from stores to road side

71

-

-

... More
Transporting of poles upto size 30' from road site to pole pit including loading and unloading of poles by using JCB or Manual

71

-

-

... More
ALTERATION OF CLAMPS

-

-

-

... More
Alteration of clamps for Back Clamps

126

-

-

... More
Releasing / Dismantling

-

-

-

... More
Dismantling of PSc pole 8m

17

-

-

... More
Releasing of ACSR 7/2.59 mm

9

-

-

... More
Transportation of dismantled / released line materials fom the field to stores including loading, unloading, of materilas from site to stores as per the directions by the TANGEDCO Site Engineer (This includes labour for loading, unloading, transporting, all T&P such etc)

2

-

-

... More
E.S.I. @4.75 % should be Entered by the Bidder

1

-

-

... More
G.S.T. @18% should be Entered by the Bidder

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.