Tamil Nadu Generation And Distribution Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date2 Sep 2022
Closing Date12 Sep 2022
Tender AmountRefer Documents
Costs
EMD
₹ 67,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_EB_249577_1Bid Award Id
ViewTender No
57/22-23/Dt.02.09.2022Tender Authority
Tamil Nadu Generation And Distribution Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
In Hard Soil (common to all size of poles)
200
-
-
In rocky area(common to all size of poles) by blasting/Manual
146
-
-
Excavation of Stay pit of 4.5' to 5' depth using JCB/Manual
168
-
-
Erection of Poles and Accessories
-
-
-
Erection of RCC, REC, PSC poles upto 8.00m length by using JCB/Manual
37
-
-
Erection of RCC, REC, PSC poles above 8.00m length by using JCB/Manual
361
-
-
Erection of metal supports above 9m/RSJ/Rail pole/Tubular pole
85
-
-
Erection of stay set complete with fixing up stay wire Eye, Bow,Guy Shackle, Binding etc.
168
-
-
Fixing of line materials
-
-
-
Fixing of HT V Cross arms 3 1/2, 4 1/2 & 5 feet, Tapping cross arm &Garding cross arm
979
-
-
Fixing of LT 3 Phase cross arm
232
-
-
Fixing of LT single Phase cross arm
4
-
-
Fixing of HT / LT TI Fitting
244
-
-
Fixing of HT Pin Insulators (11/22/33KV)
1968
-
-
Fixing of LT Pin Insulators
235
-
-
Fixing of HT 11KV stain disc
780
-
-
Fixing of LT Shackle
493
-
-
Fixing of Aluminium knob
235
-
-
Paving and Stringing of conductor
-
-
-
Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor
14.44
-
-
Paving and stringing of conductors of sizes 7/4.09 mm ACSR or other equivalent conductor
75.89
-
-
Releasing and reerection (resagging) of one run of all sizes of conductor
4.5
-
-
Erection of Distribution Transformers:
-
-
-
Erection of 11KV Single pole structure including erection of DT complete without centre support
36
-
-
ERECTION OF DP STRUCTURE:
-
-
-
Erection of DP structure with stay as per TNEB standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc.,
5
-
-
Concreting Works
-
-
-
Concreting with 1:4:8 mix using 40mm jelly including curing (material +labour) mass concreting of poles
446
-
-
stay concreting
168
-
-
Earthing
-
-
-
Earthing of poles with GI wires 4 or 6 SWG by coil earthing
446
-
-
Loading/Unloading Charges
-
-
-
Loading of DT upto 100KVA
36
-
-
Unloading of DT upto 100KVA
36
-
-
Loading of various size of REC, RCC,PSC Poles upto 8.0m length
37
-
-
Loading of various size of REC, RCC,PSC Poles above 8.0m length
407
-
-
Loading of metal Poles of all sizes
85
-
-
Unloading of various size of REC, RCC,PSC Poles upto 8.0m length
37
-
-
Unloading of various size of REC, RCC,PSC Poles above 8.0m length
407
-
-
Unloading of metal Poles of all sizes
85
-
-
Loading of conductor
25
-
-
Unloading of conductor
25
-
-
Loading of line material
25
-
-
Unloading of line material
25
-
-
Loading of 11 KV strain disc
65
-
-
Unloading of 11 KV strain disc
65
-
-
Loading of LT Pin insulator shackle, guy shackle, LT Pin, Metal parts, HT pin etc.,
30
-
-
Unloading of LT Pin insulator shackle, guy shackle, LT Pin, Metal parts, HT pin etc.,
30
-
-
Transportation charges
-
-
-
Transportation of all types and sizes of poles and other associated material from road side to pole pit and vice versa upto 0.50KM
529
-
-
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) upto 5 KM from Poonchoolai SS To Bodipet Tail End
529
-
-
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading)Above 5 KM of from Poonchoolai SS To Bodipet Tail End
529
-
-
Transporting of conductors of all size from road side to pit locations upto 1 KM of conductor
91
-
-
Transporting of Distribution Transformer / Line materials from stores to office/ site upto 10KM distance by engaging 1 ton capacity Minidor(lorry)
50
-
-
Dismandling of Line Materials
-
-
-
Dismandling of RCC, REC, PSC & Metal poles of all sizes including the closing of pit
6
-
-
Dismandling of conductor of upto 7/3.35 including Transporting the conductor to the nearest road side and stocking in coils
1
-
-
Dismandling of conductor of above 7/3.35 including Transporting the conductor to the nearest road side and stocking in coils
1
-
-
Dismandling of Cross arm clamps, TI fittings hardwares, insulators etc.
50
-
-
PAINTING:
-
-
-
Numbering of poles including base painting and with cost of paint
446
-
-
Painting of iron poles up to 40 ft 200/100 length with double coats including cost of paint
85
-
-
Painting of Cement poles by Distember coating including cost of distember
361
-
-
WORKSHOP CHARGES :-
-
-
-
Manufacturing/ Altering of clamps
500
-
-
Drilling of holes in the structure materials clamps etc.
600
-
-
AB switch or open type side arm stud, cutting and drilling holes.
36
-
-
Manufacturing of earth pipe clamps for structure including of drilling holes and welding and clamp with earth pipe
72
-
-
GENERAL
-
-
-
Jungle clearance such as Kattu Karuvai in the various area without uprooting
4000
-
-
Jungle clearance such as Kattu Karuvai in the various area with uprooting
4000
-
-
Clearing of Tree brances of coconut tree
1200
-
-
Clearing of Tree brances of Neem, Tamerined, country etc
500
-
-
Leveling of Ground using Bul Dozer
100
-
-
Cleaaring of Branches/ Trees with JCB
100
-
-
E.P.F. @13 % should be Entered by the Bidder
1
-
-
E.S.I. @3.25 % should be Entered by the Bidder
1
-
-
G.S.T. @18% should be Entered by the Bidder
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements