Tamil Nadu Generation And Distribution Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender

Works
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date8 Nov 2024
Closing Soon25 Nov 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Power Transformer Winding temperature indicator with four control switch

-

-

-

... More
Magetic Oil Gauage dial with minimum,maximum and normal (at 30C) marking and pointer and low oil level contact of 0.5 Amps , 110/30 V DC rating.

-

-

-

... More
Buchholz relay as per IS 3637

-

-

-

... More
Butterfly valve as per field requirement

-

-

-

... More
Wheel Valve 25 mm

-

-

-

... More
Wheel Valve 40 mm

-

-

-

... More
Breather for Power Transformer - 3 Kg capacity

-

-

-

... More
Breather for Power Transformer - 1 Kg capacity

-

-

-

... More
Silica Gel

-

-

-

... More
"Switch End clamps" of various sizes as per field requirement

-

-

-

... More
"T" Clamp and "L" Clamps of various sizes as per field requirement

-

-

-

... More
Neoprene Rubberized cork sheet 900X900X6MM

-

-

-

... More
Neoprene Rubberized cork sheet 900X900X8MM

-

-

-

... More
Neoprene Rubberized cork sheet 900X900X16MM

-

-

-

... More
Supply and fixing of View Glass for conservator Tank

-

-

-

... More
Supply and erection of Neutral omega copper with copper M-42 Nut & washer of suitable length and diameter as per drawing and as directed by the field engineer.

-

-

-

... More
MS round ROD 40mm diameter (For Earth electrode)

-

-

-

... More
MS FLAT (65X10 & 50X8 for earth mat and neutral Earthing )

-

-

-

... More
GI bolt and Nuts of various size with washers

-

-

-

... More
Supply of Yellow empire tape

-

-

-

... More
Supply and erection of terminal block with Links as per the field requirement

-

-

-

... More
SCHEDULE OF PRICES FOR LABOUR CHARGES

-

-

-

... More
Labour charges for Dismantling of 50 mm busbar and Jumper connection of Power Transformer including disconnection of necessary wiring as directed by the Field Engineer.

-

-

-

... More
Labour charges for Dismantling of 5 MVA & Below 5 MVA Power Transformers with out using board crane the complete accessories of Power Transformer such as header pipes, Cooler Bank radiators, H.V. & L.V. bushings, conservator tanks, bucholz relays, equalizing pipes, Cooler fans, Pumps etc. and Draining the oil up to the required level as directed by Field Engineer.

-

-

-

... More
Labour charges for Dismantling of 8 MVA Power Transformers with out using board crane the complete accessories of Power Transformer such as header pipes, Cooler Bank radiators, H.V. & L.V. bushings, conservator tanks, bucholz relays, equalizing pipes, Cooler fans, Pumps etc. and Draining the oil up to the required level as directed by Field Engineer.

-

-

-

... More
Labour charges for Dismantling of 5 MVA & Below 5 MVA Power Transformer with out using board crane, the accessories of Power Transformer such as header pipes, Cooler Bank radiators only and Draining the oil up to the required level as per site condition and as directed by Field Engineer. (30% of full dismantling charges)

-

-

-

... More
Labour charges for Dismantling of 8 MVA Power Transformer with out using board crane, the accessories of Power Transformer such as header pipes, Cooler Bank radiators only and Draining the oil up to the required level as per site condition and as directed by Field Engineer. (30% of full dismantling charges)

-

-

-

... More
Labour charges for Dismantling of 5 MVA & Below 5 MVA Power Transformer with out using board crane the accessories of Power transformer such as H.V. & L.V. bushings, etc. and Draining the oil up to the required level as per site condition and as directed by Field Engineer. (30% of full dismantling charges)

-

-

-

... More
Labour charges for Dismantling of 8 MVA Power Transformer with out using board crane the accessories of Power transformer such as H.V. & L.V. bushings, etc. and Draining the oil up to the required level as per site condition and as directed by Field Engineer. (30% of full dismantling charges)

-

-

-

... More
Labour charges for Dismantling 5 MVA & Below 5 MVA Power Transformer without using board crane the accessories of Power transformer such as conservator tanks, bucholz relays, equalizing pipes only and Draining the oil to the required level as per site condition and as directed by Field Engineer. (30% of full dismantling charges)

-

-

-

... More
Labour charges for Dismantling 8 MVA Power Transformers without using board crane the accessories of Power transformer such as conservator tanks, bucholz relays, equalizing pipes only and Draining the oil to the required level as per site condition and as directed by Field Engineer. (30% of full dismantling charges)

-

-

-

... More
Labour charges for Pulling off the failed Power Transformer from the plinth to safer side as directed by the Field Engineer.

-

-

-

... More
Labour charges for Pulling and placing the allotted Power Transformer at the allotted plinth as directed by the Field Engineer.

-

-

-

... More
Labour charges for loading Power Transformer with complete accessories including released oil, initial lead of 5 Metres as directed by the Field Engineer.

-

-

-

... More
Labour charges for Unloading the Power Transformer with complete accessories including released oil, initial lead of 5 Metres as directed by the Field Engineer .

-

-

-

... More
Transporting of the Power Transformers main tank with core level oil and all accessories and released oil by Low bed trailer and lorry as directed by the filed Engineer. (Flat rate for weight Upto 30 MT and up to 100 KM Distance)

-

-

-

... More
Transporting of the Power Transformers main tank with core level oil and all accessories and released oil by Low bed trailer and lorry as directed by the filed Engineer. (Flat rate from 31 to 50 MT and up to 100 KM Distance)

-

-

-

... More
Transporting of the Power Transformers with accessories above 100 KM (Flat rate + Rs/MT/KM rate)

-

-

-

... More
Labour Charges for loading/unloading of power transformer oil barrel with new/released oil from store to site or vice versa as directed by the Field Engineer.

-

-

-

... More
Labour charges for erection of 5 MVA & Below 5 MVA Power Transformer with out using Board crane wherever applicable including gasket changing for H.V. & L.V. Bushings, Radiator valve, Conservator Valve, equalizer Pipe Valve, Bucholz Valve, etc. as directed by Field Engineer. (Gasket to be supplied by the TNPDCL).

-

-

-

... More
Labour charges for erection of 8 MVAPower Transformer with out using Board crane wherever applicable including gasket changing for H.V. & L.V. Bushings, Radiator valve, Conservator Valve, equalizer Pipe Valve, Bucholz Valve, etc. as directed by Field Engineer. (Gasket to be supplied by the TNPDCL).

-

-

-

... More
Labour charges for draining of oil from main tank to Barrels as directed by the Field Engineer.

-

-

-

... More
Labour charges for Intial filling of oil under vacuum from spare tank / barrel to main tank as directed by the Field Engineer.

-

-

-

... More
Labour for dismantling of Top Cover gaskets of Power Transformers up to 8 MVA Capacity including OLTC cover and Replacement of Top cover gaskets, OLTC gaskets, Radiator, Butterfly valve inner Gaskets and all other gaskets, which are not normally covered under dismantling and re-erection, gaskets changing and refitting of top cover and OLTC cover plate & all other dismantled accessories and complete tightening works as directed by the Field Engineer. All the required Gaskets of RC 70C grade and governed by IS 4253 to be supplied by Contractor.

-

-

-

... More
Labour for dismantling of Top Cover gaskets of Power Transformers upto 8 MVA capacity including OLTC cover and Replacement of Top cover gaskets, as directed by the Field Engineer. All the required Gaskets of RC 70C grade and governed by IS 4253 to be supplied by Contractor.

-

-

-

... More
Labour Charges for Overhauling of Power Transformers OLTC mechanism including cleaning and replacing of defective spares and gaskets etc. as directed by the Field Engineer. Gasket & Spares will be supplied by TNPDCL. (Power Transformers of Upto 8 MVA capacity).

-

-

-

... More
Labour charges for initial hot oil circulation in seprate tank. The fillter will be provided by contractor.

-

-

-

... More
Labour charges for Hot oil Circulation of oil of Transformer and OLTC under vacuum drying when ever applicable/necessary up to the required level and circulation of oil till satisfactory results are obtained before commissioning as directed by Field Engineer. Oil circulation required only in Main tank

-

-

-

... More
Labour for the erection of required control cables of upto 8 core in duct from power transformer to control room and in the transformer body as directed by the Field Engineer. (Labour for erection of cable in duct/trench/clamping on structures - neat laying in the ducts with identification Tags, Plastic token in all duct corners for easy identification of cables. including fabrication of clamps and fixing at uniform intervals as directed by the field engineer)

-

-

-

... More
Labour for the erection of required control cables of above 8 core in duct from power transformer to control room and in the transformer body as directed by the Field Engineer. (Labour for erection of cable in duct/trench/clamping on structures - neat laying in the ducts with identification Tags, Plastic token in all duct corners for easy identification of cables. including fabrication of clamps and fixing at uniform intervals as directed by the field engineer)

-

-

-

... More
Supply and glanding of all the control cable in transformer to RTCC, DM.Box, MBox, etc including removing of insulation of the control cable and providing suitable holes in the gland plate as directed by the field engineer with 32 mm Cable glands.

-

-

-

... More
Supply and glanding of all the control cable in transformer to RTCC, DM.Box, MBox, etc including removing of insulation of the control cable and providing suitable holes in the gland plate as directed by the field engineer with 28 mm Cable glands.

-

-

-

... More
Supply and glanding of all the control cable in transformer to RTCC, DM.Box, MBox, etc including removing of insulation of the control cable and providing suitable holes in the gland plate as directed by the field engineer with 25 mm Cable glands.

-

-

-

... More
Supply and glanding of all the control cable in transformer to RTCC, DM.Box, MBox, etc including removing of insulation of the control cable and providing suitable holes in the gland plate as directed by the field engineer with 19 mm Cable glands.

-

-

-

... More
Termination of cable core end, dressed neatly including the cost of cable socket (lug) ferrules, sleeves, tags, ties, stropes, etc., as directed by the field engineer.

-

-

-

... More
Labour charges for one finish coating of aluminium painting works with spray gun for Power Transformers of upto 8 MVA capacity complete including T&P etc. and painting of valves, bushings with red, yellow, blue and black paint including cost of paint of reputed make company viz Asian, Berger etc., and Consumables as directed by the field Engineer.

-

-

-

... More
Providing 140/150mm dia bore including labour, lead, lift etc., including mobilization in all types of soil and erection of earth pit, supply and providing A4 Grade bentonite powder with 5% common salt mixed with available site clay soil with water 5Kg/meter depth in earth bore and pouring water and tightening of earth bore, upto satisfactory earth resistance value, and as directed by the field Engineer and supply of identification board of size 300x250 mm out of 14 SWG MS sheet and lettering and 12 mm M.S. round rod to be fixed to the board.

-

-

-

... More
Labour, Machineries, consumables for Fabrication and Erection of earth Mat, earth connections, Earth Electrodes, Earth spikes (including Sharpening of earth Spike) as directed by the field Engineer.

-

-

-

... More
Labour for Excavation and reffilling of Earth/Trench for earth mat, cable etc of any size/depth, narrow excavatiopn as directed by the field Engineer in normal clay/hard gravel soil.

-

-

-

... More
Supply and Erection of HV side Power connectors including the cost of bolts, Nuts and Electrical connections as per drawing directed by the field engineer. (50MM)

-

-

-

... More
Supply and Erection of LV side Power connectors including the cost of bolts, Nuts and Electrical connections as per drawing directed by the field engineer.

-

-

-

... More
Labour charges for 50 mm Aluminium Bus bar erection including suitable modification of switch end clamps and Transformer free end clamps, providing suitable bend and holes wherever necessary as directed by the Field Engineer.

-

-

-

... More
Labour for erection of LV Jumper including modification of clamps providing holes wherever necessary as directed by the field engineer.

-

-

-

... More
Charges for Transport insurance for Power Transformer from the released SS site to the allotted SS site with Nationalised Insurance company.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.