Tamil Nadu Generation And Distribution Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender

Services
Electrical and Electronics
Electrical Works
Eprocure
Opening Date7 Feb 2025
Closing Date20 Feb 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
For pole above 8.00m length by using JCB/Manual

1

-

-

... More
In Hard Soil (common to all size of poles)

1

-

-

... More
In rocky area (common to all size of poles) by blasting / Manual

1

-

-

... More
Excavation of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual

1

-

-

... More
Excavation of Stay pit in Hard rock soil

1

-

-

... More
ERECTION OF POLES AND ACCESSORIES

1

-

-

... More
Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manual

1

-

-

... More
Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual

1

-

-

... More
Erection of metal supports above 9m / RSJ / Rail Pole/Tubular Poles

1

-

-

... More
Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc.

1

-

-

... More
Erection of additional Stay in the same stay rod, excluding excavation of stay pit and burial of stay rod.

1

-

-

... More
Erection of stay set complete in the rock area by blasting

1

-

-

... More
Fixing of Line Materials

1

-

-

... More
V cross arm 3.5 feet

1

-

-

... More
V cross arm 4.5 feet

1

-

-

... More
V cross arm 5.0 feet

1

-

-

... More
Fixing of LT S phase cross arm

1

-

-

... More
Fixing of LT 3 phase cross arm

1

-

-

... More
Fixing of HT / LT Ti fitting

1

-

-

... More
Fixing of HT PIN insulator with Pin 11 kv

1

-

-

... More
Fixing of HT PIN insulator with Pin 22 kv

1

-

-

... More
Fixing of HT PIN insulator with Pin 33 kv

1

-

-

... More
Fixing of LT PIN insulator

1

-

-

... More
Fixing of HT strain disc 11 KV

1

-

-

... More
Fixing of HT strain disc 22 KV

1

-

-

... More
Fixing of HT strain disc 33 KV

1

-

-

... More
Fixing of Two Tapping cross arm per cut point upto 33 KV line including fixing of Discs,insulators and Jumpering etc..

1

-

-

... More
Set right of all sizes of leaning poles

1

-

-

... More
Fixing of shackle

1

-

-

... More
Fixing of Aluminium knob

1

-

-

... More
Fixing of HT LAS (3 Nos.)

1

-

-

... More
Fixing of LT LAS (3 Nos.)

1

-

-

... More
Fixing of Tapping Channel X Arm

1

-

-

... More
STRINGING OF CONDUCTORS:

1

-

-

... More
Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor

1

-

-

... More
Paving and stringing of conductors of above 7/2.59 mm ACSR or other equivalent conductor upto 7/3.35mm ACSR or other equivalent conductor

1

-

-

... More
Paving and stringing of conductors of one run of PVC cable line of all sizes with GI wire and reel insulator.

1

-

-

... More
Paving and stringing of conductors of 7/4.09mm ACSR or other equivalent conductor

1

-

-

... More
Paving and stringing of conductors of 7/4.72 mm Dog Conductor or other equivalent conductor

1

-

-

... More
Releasing and reerection (resagging) of one run of all sizes of conductor

1

-

-

... More
ERECTION OF DISTRIBUTION TRANSFORMERS:

1

-

-

... More
Erection of Distribution Transformer structure complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit HT / LT LAS and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer. (Data as per Annexure II)

1

-

-

... More
Erection of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa.

1

-

-

... More
(i) Upto 25 KVA Distribution transformer / Metering set.

1

-

-

... More
(ii) Above 25 KVA to 100 KVA

1

-

-

... More
(iii) Above 100 KVA to 250 KVA

1

-

-

... More
(iv) 500 KVA and above

1

-

-

... More
(V) Failed DT replacement below 100 KVA

1

-

-

... More
(vi) Failed DT replacement 100 KVA and above

1

-

-

... More
Erection of 11 KV single pole Structure including erection of DT complete without centre support (Data as per Annexure III)

1

-

-

... More
Erection of 11 KV Single Pole structure including erection of DT complete with centre support ( Data as per Annexure III)

1

-

-

... More
ERECTION OF DP STRUCTURE:

1

-

-

... More
Erection of DP structure with stay as per TNEB standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc., (Data as per Annexure I)

1

-

-

... More
(i) With 11 KV AB switch using all types of poles of size 9.14 m and above length

1

-

-

... More
(i) With 22 / 33 KV AB switch using all types of poles of size 9.14 m and above length

1

-

-

... More
Erection of single pole DP with complete and with single earth

1

-

-

... More
CONCRETING WORKS:

1

-

-

... More
Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour)

1

-

-

... More
(i) Mass concreting of poles

1

-

-

... More
(ii) Sleeve concreting

1

-

-

... More
(iii) Stay concreting

1

-

-

... More
EARTHING:

1

-

-

... More
(i) Earthing of poles with GI wires 4 or 6 SWG by coil earthing

1

-

-

... More
(ii) Provision of spike including earthing arrangement

1

-

-

... More
(iii) Pipie earthing including excavation of earth pit and fixing earth pipe 3 m length

1

-

-

... More
(iv) Replacing the corroded earth pipes of transformer structure and replacing the earth wire completely with aluminium lugs for termination

1

-

-

... More
(v) Replacement of corroded earth pipe

1

-

-

... More
LOADING AND UNLOADING CHARGES:

1

-

-

... More
Loading or unloading of Distribution Transformer

1

-

-

... More
(i) Upto 100 KVA

1

-

-

... More
(ii) Above 100 KVA and upto 500 KVA

1

-

-

... More
(iii) Metering set of all ratios

1

-

-

... More
Loading or unloading of various sizes of poles

1

-

-

... More
(i) REC, RCC, PSC pole upto 8.00 m length

1

-

-

... More
(ii) All REC, RCC pole above 8.00 m length

1

-

-

... More
(iii) Metal poles all sizes

1

-

-

... More
Loading of Conductor

1

-

-

... More
Unloading of Conductor

1

-

-

... More
Loading / Unloading of Iron & Steel

1

-

-

... More
Loading / Unloading of Oil

1

-

-

... More
Loading / Unloading of line materials

1

-

-

... More
Loading / Unloading of 11 KV strain disc

1

-

-

... More
Loading / Unloading of LT Pin insulator shackle, guy shackle, LT Pin, Metal parts, HT pin etc.,

1

-

-

... More
Loading / Unloading of meters

1

-

-

... More
(i) Single Phase Meter

1

-

-

... More
(ii) Three Phase Meter

1

-

-

... More
Guarding Arrangement

1

-

-

... More
Provision of guarding with two numbers earth pits excluding stay set erection

1

-

-

... More
(i) Flat guarding with earth pit

1

-

-

... More
(ii) Split neutral

1

-

-

... More
TRANSPORTATION CHARGES:

1

-

-

... More
Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.50 KM

1

-

-

... More
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading)

1

-

-

... More
(i) For a lead upto 5 KM

1

-

-

... More
(ii) Above 5 KM of lead of every KM

1

-

-

... More
Transport of Metal pole of all sizes by head loads in hill areas from road side to pole pit location

1

-

-

... More
(i) Upto 1 KM

1

-

-

... More
(ii) Above 1 KM per each KM

1

-

-

... More
Transporting of conductors of all sizes from road side to pit locations upto one KM of Conductor

1

-

-

... More
(i) Transporting of Distribution Transformer / Line materials from stores to office / site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry)

1

-

-

... More
(ii) Above 10 KM

1

-

-

... More
Dismantling Charges

1

-

-

... More
Dismantling of RCC, REC, PSC & metal pole of all sizes including the closing of the pit

1

-

-

... More
For breaking the mass concrete of all supports

1

-

-

... More
Dismantling of stay set complete

1

-

-

... More
(i) including stay rod

1

-

-

... More
(ii) Without stay rod

1

-

-

... More
Dismantling of conductor of upto 7/3.35 including transporting the conductors to the nearest road side and stocking in coils

1

-

-

... More
Dismantling of conductor of above 7/3.35 including transporting the conductors to the nearest road side and stocking in coils

1

-

-

... More
Dismantling of Transformer structure materials complete set and transporting the same from the location to the road side

1

-

-

... More
Dismantling of Cross arm clamps TI fitting hardwares, insulators etc.,

1

-

-

... More
PAINTING:

1

-

-

... More
Painting of distribution transformer of all capacities (paint to be supplied by the Board) including cleaning of DT

1

-

-

... More
Numbering of poles including base painting and with cost of paint

1

-

-

... More
Painting of iron poles up to 36 ft length with double coats including cost of paint

1

-

-

... More
Painting of iron poles up to 40 ft 200/100 length with double coats including cost of paint

1

-

-

... More
Painting of Cement poles by Distember coating including cost of distember

1

-

-

... More
Painting of structure materials distribution transformers with aluminium paint of structure poles and writing of transformer details (Items 1 to 6 brush to be owned by the contractor)(Paint to be supplied by Department)

1

-

-

... More
Service Connection Details painting

1

-

-

... More
WORKSHOP CHARGES:

1

-

-

... More
Manufacturing / Altering of Clamps

1

-

-

... More
Drilling of holes in the structure materials clamps etc.,

1

-

-

... More
GENERAL:

1

-

-

... More
Numbering of Poles including cost of paint

1

-

-

... More
Painting of RCC poles Including cost of distember

1

-

-

... More
Clearing of tree braches of coconut trees

1

-

-

... More
Clearing of tree braches of Neem, Tamarin, Country etc

1

-

-

... More
Leveling of Ground using Bul Dozer

1

-

-

... More
Clearing of Branches / Trees with JCB

1

-

-

... More
Fencing of Distribution Transformer Structure at Road side- Fabrication and Erection.(including all materials)

1

-

-

... More
LAYING OF HT CABLE

1

-

-

... More
Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., - Normal Road

1

-

-

... More
Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc., - Tar Road

1

-

-

... More
Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc.,-Concrete Road

1

-

-

... More
Loading and unloading of HT Cable including coiling and recoiling

1

-

-

... More
Transporting of 11 KV HT cable from departmental stores to work spot by engaging private vehicle upto 5 Km

1

-

-

... More
Transporting of 11 KV HT cable from departmental stores to work spot by engaging private vehicle above 5 Km

1

-

-

... More
Laying of 11KV 3 X 300 sq mm XLPE cable

1

-

-

... More
Laying of 11KV 3 X 120 sq mm XLPE cable

1

-

-

... More
Covering HT cable by cement "V" trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & Cable size on the trough

1

-

-

... More
Refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete.

1

-

-

... More
Transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 drums) upto 5 Km

1

-

-

... More
Transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 drums) above 5 Km

1

-

-

... More
Laying of HT UG cable using Trenchless Method

1

-

-

... More
Laying of HT UG cable using Trenchless Method with Pipes

1

-

-

... More
Laying of HT UG cable using Trenchless Method without Pipes

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.