Tamil Nadu Generation And Distribution Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date23 Feb 2022
Closing Date9 Mar 2022
Tender Amount₹ 10,00,000
Costs
EMD
₹ 10,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Works Contract For East N.g.pettai Sub Division
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_EB_222986_1Bid Award Id
ViewTender No
SPECNO037/2021-22DT23.02.2022Tender Authority
Tamil Nadu Generation And Distribution Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Excavation of Pole pit upto 30" (9.14M) Poles
40
-
-
Excavation of Pole pit above30" (9.14M) Poles
10
-
-
Hard rock without blasting (where houses are located)
10
-
-
Erection of RCC /PSC Poles/Metal poles upto 8.0M (27')
80
-
-
Erection of RCC /PSC Poles/Metal poles upto 9.14M (30')
25
-
-
Erection of RSJ,Rail,Fabricated poles above 30'-0 (9.14M)'
12
-
-
Erection of RSJ,Rail,Fabricated poles above 36'-0'
6
-
-
Erection of stay set complete
30
-
-
Fixing of 4 1/2" HT 'V' X arms/Channel X arms/Guarding X arms
40
-
-
Fixing of LT 3 Ф X arm
120
-
-
Fixing of LT 1 Ф X arms
50
-
-
Fixing of HT/LT TI Fittings
100
-
-
Fixing of HT Pin and Insulator - 22 KV
150
-
-
Fixing of HT 11 KV Strain disc
150
-
-
Fixing of LT Pin insulators
320
-
-
Fixing of Shackle
130
-
-
Fixing of Al.Knob
70
-
-
Earthing of pole including looping, binding, coiling and burying
40
-
-
Earthing of Addl. X arms
80
-
-
Paving of Conductor complete with ACSR 7/3.35 & AAAC 7/3.15 mm
500
-
-
Paving of Conductor complete with ACSR 7/2.59 mm /AAAC 7/2.50 mm & ACSR 7/2.11 mm
500
-
-
Mass concreting (Concreting of poles with size 2'x2'x6' including cost of jelly, Sand and Cement (With supply) with a mixture of 1:3:6 along Sleeve concreting and plastering of concrete with ratio 1:2 )
5
-
-
b. Sleeve concreting including materials (Cement 1/2 bag + sand and Blue metals and watering)
25
-
-
Base Concretting (1.5' X 1.5' x 1/4' including cost of jelly, Sand and Cement (With supply) )
10
-
-
Stay Concreting (Concreting of stay with size 1.5'x1.5'x 3' including cost of jelly, Sand and Cement (With supply) with a mixture of 1:3:6 along sleeve concreting and plastering of concrete portion above the ground level with ratio 1:2 )
35
-
-
Flat Guarding (with 2 M interval of lays)
10
-
-
HT Guarding
10
-
-
Transport of Materials Below 8 Kms
50
-
-
Transport of Materials Above 8 Kms for Addl.Kms
50
-
-
i) Loading of PSC pole 24' & 27'
80
-
-
ii) Loading of RCC pole up to 8 mtr(27') and metal poles of all sizes
10
-
-
iii) Loading of PSC pole 9.0 mtr pole (300Kg)
20
-
-
iv) Loading of PSC pole 9.0 mtr pole (400Kg)
10
-
-
v) Loading of RCC 9.14 mtr pole
10
-
-
i) Un Loading of PSC pole 24' & 27'
80
-
-
ii) UnLoading of RCC pole up to 8 mtr(27') and metal poles of all sizes
10
-
-
iii)Un Loading of PSC pole 9.0 mtr pole (300Kg)
20
-
-
iv) Loading of PSC pole 9.0 mtr pole (400Kg)
10
-
-
v) Un Loading of RCC 9.14 mtr pole
10
-
-
vii) Loading of Cement bag of 50 Kg
5
-
-
viii) Unloading of Cement bag of 50 Kg
5
-
-
ix) Loading of Transformer oil drum with Oil 200 Lit. capacity
13
-
-
x) Unloading of Transformer oil drum with Oil 200 Lit. capacity
10
-
-
Transporting of poles from road side to pole pit including loading and unloading of poles upto 27'-0'
95
-
-
Transporting of poles from road side to pole pit including loading and unloading of poles 30' and above including R.S.Joists poles
40
-
-
Loading and Unloading of Transformer upto 200 KVA for each
8
-
-
Erection of New Transformer upto 200 KVA
8
-
-
Replacement of failed Transformers upto 200 KVA Dismandling & erection
5
-
-
Loading & Erection of HT Metering set
4
-
-
Resagging (LT)
250
-
-
i) Resagging (HT) ACSR 7/2.59mm
50
-
-
ii) Resagging (HT) ACSR 7/3.35 mm
50
-
-
Erection of Street light including fixture fitting
20
-
-
Erection of Street light service
10
-
-
Fixing of new LED lamp fittings
10
-
-
Releasing of grills from RCC poles
10
-
-
Releasing of Single phase service wire and refixing
281
-
-
Releasing of three phase service wire (up to 50 KW) and refixing
55
-
-
Releasing of three phase service (above 50 KW) and refixing
10
-
-
Labour charges of special Type clamps for rail poles,RS Joists,Tubulator pole special clamps for Distribution Transformer Structure
50
-
-
Colour washing/Painting RCC pole
20
-
-
Alteration of Back clamp
110
-
-
Alteration of Stay clamp
30
-
-
Erection of new earth pipe by replacing the corroded earth pipe
24
-
-
Providing LT Bus bar arrangement in Distn.Transformer Structure location
5
-
-
Bruning of Coconut tree branches
45
-
-
Drilling of hole in channel only 3/4" & 1" per hole
150
-
-
Cutting of plate
98
-
-
Cutting of chennel
96
-
-
cutting of Angle
95
-
-
cutting of pipe
15
-
-
Assembling of Structure material: Excavation of structure pole Pits 3'X3'x6' Nos
8
-
-
Transporting of pole to pit location 2 nos.
8
-
-
Erection of poles 2 Nos
8
-
-
Excavation of stay pit 2 Nos
8
-
-
Erection of stay set (2 sets)
8
-
-
a Base concreting 2 Nos
6
-
-
b Stay concreting 2 Nos
6
-
-
a. Top channel 1 set
6
-
-
b.Bed channel 1 set
6
-
-
c.Cross with stud for bed channel
6
-
-
d.Belting angle and H.G.Fuse Angle
6
-
-
Erection of A.B.Switch
6
-
-
Erection of H.G.Fuse set complete
6
-
-
Structure earthing complete the pits and earth- tubes and 3 pipes completed
6
-
-
Bus bar arrangements per structure
6
-
-
Feeding arrangements with open type fuse unit for two feeders
6
-
-
HT/LT LAS fixing and jumpering complete
6
-
-
Fixing of support insulator angle and erection of 3Nos. Pin insulators
6
-
-
H.T Jumpering complete per structure
6
-
-
Provision of DT Name Board (Name of the 22/11 KV#, Name of the SS, Capacity) (Including painting materials and board with size of 500mmX200mmX16swg) per structure
6
-
-
Fixing of Danger Boards per structure
6
-
-
Provision of Earth Pit Coller per structure
6
-
-
Excavation of Structure pole pits - 2 Nos
6
-
-
Erection of poles and base concreting
6
-
-
Transporting of poles from road side to pit
6
-
-
Erection of stay pits 2 Nos. and erectin of stay sets 2 sets (including stay concreting)
6
-
-
Erection of Structure materials
6
-
-
Erection of AB switch
6
-
-
Erection of HT Jumpers
6
-
-
Structure concreting and plastering earth pits
6
-
-
Painting the structure and colouring the poles
6
-
-
Fixing of Danger Boards
6
-
-
Dismantling of Bus bar arrangements
-
-
-