Tamil Nadu Generation And Distribution Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Machinery and Tools
Eprocure
Opening Date20 Dec 2024
Closing Soon26 Dec 2024
Tender AmountRefer Documents
Costs
EMD
₹ 25,800Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Nctps Ii M I Circle Mpm Unit I Mill 1d Replacement Of Damaged
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_EB_512388_1Tender No
CE NCTPS II SE M I O M 257 2024 25Tender Authority
Tamil Nadu Generation And Distribution Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
NCTPS II M I Circle MPM Unit I Mill 1D Replacement of damaged
BOQ Items
... More
Charges for dismantling of worn-out Mill Outlet Venturi collar, removing, lowering the Mill Outlet Venturi collar to the mill floor, transportation, leading, lifting, erecting and fixing the new/ reconditioned or released Mill Outlet Venturi collar on the seperator body inner , including the hire charges for T&Ps and cost of consumables. (Required Mill Outlet Venturi collar will be supplied by TANGEDCO), transporting of Mill Outlet Venturi collar from store to site/site to Mill floor at a height of 5m elevation devolute the released damaged materials from site to stores )
1
-
-
... More
Charges for dismantling of worn-out Mill Outlet Venturi Profile by dismantling and cutting the center coal feed pipe, removing and lowering the Mill Outlet Venturi profile to the mill floor,transportation, leading, lifting, erecting and fixing the new/ reconditioned or released Mill Outlet Venturi profile on the seperator body inner , including the hire charges for T & Ps and cost of consumables. (Required Mill Outlet Venturi profile will be supplied by TANGEDCO) , transporting of Mill Outlet Venturi profile from store to site/site to mill floor at a height of 5m elevation devolute the released damaged materials from site to stores )
1
-
-
... More
Charges for dismantling of worn-out Mill inverted cone by dismantling and cutting the center coal feed pipe, removing and lowering the Mill inverted cone to the mill floor, transportation, leading, lifting, erecting and fixing the new/ reconditioned or released Mill inverted cone on the seperator body inner , including the hire charges for T & Ps and cost of consumables. (Required Mill inverted cone will be supplied by TANGEDCO) transporting of Mill inverted cone from store to site/site to Mill floor at a height of 5m elevation devolute the released damaged materials from site to stores )
1
-
-
... More
Charges for dismantling of worn-out Mill inner cone by dismantling of separator body, dismantling the fixing bolts on Mill inner cone, removing and lowering the Mill inner cone to the mill floor, transportation, leading, lifting, erecting and fixing the new/ reconditioned or released Mill inner cone on the seperator body top , including the hire charges for T & Ps and cost of consumables. (Required Mill inner cone will be supplied by TANGEDCO transporting of Mill inner cone from store to site/site to mill floor at a height of 5m elevation devolute the released damaged materials from site to stores )
1
-
-
... More
Charges for removal of separator body along with classifier assembly, lifting and aranging rails for shifting the separater body and placing it an appropriate place and after renewal of supporting fixtures and rails including the cost of consumables and hire charges for T&Ps.
1
-
-
... More
Charges for refixing the worn-out/dislocated/ damaged bull ring segments after removal of clamping ring, bowl extension rings, wedges, cleaning and surface preparation in bowl, positioning, fixing of new/dislocated set of bull ring segments and fixing of clamping ring, bowl extension rings, wedges etc., in position and welding of gap rod, including hire charges for T&P's and cost of consumables.
1
-
-
... More
Charges for removal of bowl & bowl hub assembly by lifting and arranging rails for shifting it to repair bay removing the bowl fixing bolts & separating the bowl and bowl hub assembly shifting new/reconditioned bowl hub to mill, positioning & fixing including the cost of consumables and hire charges for T&Ps.(Required bowl &bowl hub assembly will be supplied by TANGEDCO )
1
-
-
... More
Charges for dismantling and removing the insulation cover plates in order to access for removing the labyrinth seals, dismantling and removing the damaged labyrinth seals, checking the seal grooves, bure cleaning, rectification & reconditioning the damaged area for proper flow, seating area rectification of damaged insulation cover plates, removing the sheared screws, retapping the same and refixing of insulation cover plates after fixing rectified labyrinth seals including hire charges for T&P's and cost of consumables.
1
-
-
... More
Charges for attending hot air leakage in inner labyrinth seal area by removing the inner skirt cover by cutting inside the underbowl, removing the studs, removing inner labyrinth seal and placing on the floor, checking labyrinth seal inner grooves, rectifing defects, fixing of graphite rope inside the labyrinth seal grooves, flushing of seal air lines of labyrinth seal area, leading, lifting and positioning labyrinth seal and refixing the studs, reassembling inner skirt cover, checking clearance between labyrinth seal and bowl hub and conducting trail run of mill including cost of consumables, T&P's, etc.,
1
-
-
... More
Charges for rectification of damaged and worn out clasiffier bottom ring area by removing sheared fastners, cleaning of fastner holes, attending rectification works in inner cone top, including the hire charges for T&P's and cost of consumables.
1
-
-
... More
Charges for Journal bearing play test checking of reading before dismantling of the journal assembly, dismantling of trunnion shaft assembly, removal of journal upper housing, journal shaft with bearing, inspecition and cleaning including leading lifing, including cost of consumables and hire charges for Tools & Plants.
3
-
-
... More
Charges for checking the end ply of upper journal bearing after assenbling of journal assembly , dimantling the bearing spacer, if necessary correction to be made and adding shims to reducing the journal bearing ply, including cost of consumables and hire charges for T&Pls.
3
-
-
... More
Charges for re-shifting the rectified/new grinding roller journal assembly with saddle from repair bay/work shop including hire charges for T&P's and cost of consumables.
3
-
-
... More
Charges for inserting overhauled/new journal assembly into the miill,after positioning and fixing including cost of consumables and hire charges for T&Ps.
3
-
-
... More
Charges for re-fixing the journal door after attending the breakdown works including cost of consumables and hire charges for Tools & Plants.
3
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%