Tamil Nadu Generation And Distribution Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender

Works
Machinery and Tools
Electrical and Electronics
Electrical Works
Eprocure
Opening Date18 Jun 2024
Closing Date25 Jun 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
NCTPS II 600 MW MI Circle BM Division Unit II Air pre heater 2A Annual Overhauling of renewal of 2 Nos
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismantling of hot end static seals provide at a hot end sector plate by arresting the static seal plates using Chain Blocks, gas cutting and goughing of static seals without damaging the sector plate and centre section plate at inside the APH and re-erection of a new hot end static seals of sector plate in position by welding with center section plate and a new sector plate erected with proper clearence between guiding surfaces.

2

-

-

... More
Dismantling of a hot end Sector plate Guide pins located at in board and out board of APH by gas cutting and removing from the top of centre section plate at the top of Air Pre Heater and mechanical cleaning of pins and re-erection of dismantled Sector plate Guide pins in position by welding with center section plate after the erection of a new hot end sector plate.

2

-

-

... More
Removing of Inboard adjuster screw and out board adjust screw of a hot end sector plate one by one after arresting and supporting the sector plate. Mechanical cleaning of all adjuster screw and threaded holes in center section plate and re-assembling the adjuster screw with center section plate and sector plate after positioning of a new hot end sector plate in exact location.

2

-

-

... More
Cutting and removing of bracing support pipes at APH flue gas hot end side to facilitate to mobile the lowered the sector plate by rotating the APH rotor and re-erection of removed bracing pipes by welding in position after the erection of new hot end sector plate.

2

-

-

... More
Arresting of existing wornout sector plate by chain block and hydraulic jack after removing of adjuster screws and guide pins, lowering of sector plate gradually and placing it on APH rotor by providing proper packing and releasing of chain block supports, Lifting of a sector plate at in-board mounted on self aligning roller by means of jack and keep it without touching the guide bearing spool and static part of APH, cutting of roller brackets, releasing of lowered sector plate by mobilizing on flue gas side, lifting and drawing outside of Air pre heater through the opening made in Air pre heater flue gas side shell body mother plate, leading and lowering of removed worn-out hot end sector plate from 19.15mtr Air pre heater floor level to '0' mtr boiler floor by means of motor operated winch, transporting and devoluting to store.

2

-

-

... More
Erection of a new hot end sector plate, this work includes transporting of sector plate from store to site, leading and lifting of a new hot end sector plate from '0' mtr boiler floor to 19.15mtr Air pre heater floor level by means of motor operated winch and inserting the new sector plate through the flue gas shell body mother plate opening by means of chain blocks support, placing the sector plate on rotor out board by packing with hydraulic jacks in proper orientation on the APH rotor, lifting of a sector plate at in-board by means of jack without touching the static part of APH and sector plate in board mounting roller, releasing of chain block supports from static body of APH, mobilizing the new sector plate to the existing wornout sector plate removed location by means of rotating the APH rotor and re-assembling the new hot end sector plate in position as per standard procedure and aligning of sector plate as per the standard alignment protacal.

2

-

-

... More
Commissioning after the completing of new hot end sector plate erection works and providing field support for monitoring the performance till the Unit attain maximum generation.

2

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.