Tamil Nadu Generation And Distribution Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date12 Jul 2024
Closing Date24 Jul 2024
Tender Amount₹ 2,46,200
Costs
EMD
₹ 2,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_EB_462425_1Bid Award Id
ViewTender No
SE/CEDC/S/C/No.08/24-25Tender Authority
Tamil Nadu Generation And Distribution Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Construction of fire protection wall in between power transformer at Sellapampalayam 110 11 KV Sub Station
Construction of fire protection wall in between power transformer at Sellapampalayam 110 11 KV Sub Station
BOQ Items
Supplying and filling of M.sand in foundation and basement with well consolidation, watering including cost of all materials, labour, lead,lift, etc., complete.
1
-
-
PCC 1:3:6 mix using 20mm HBS machine crushed metal for foundation and flooring including cost of all materials, M.sand, curing, labour, lead, lift, etc. complete.
1
-
-
Brick work in CM 1:5 mix using class II chamber burnt bricks of size for super structure including cost of all materials, M.Sand, Curing, labour, lead, lift, curing, etc., complete.
0.3
-
-
RCC 1:1.5:3 using 12-20mm HBS machine crushed metal for raft foundation including cost of all materials, M.sand, curing, vibrating charges, labour, lead, lift, etc., complete, but excluding cost of steel reinforcement. (Raft)
2.5
-
-
RCC 1:1.5:3 using 12-20mm HBS machine crushed metal for column concrete with form work including cost of all materials, M.Sand, curing, vibrating charges, labour, lead, lift, etc., complete. But excluding cost of steel reinforcement. For column concrete upto Ground level
0.5
-
-
RCC 1:1.5:3 using 12-20mm HBS machine crushed metal for column concrete with form work including cost of all materials, M.Sand, curing, vibrating charges, labour, lead, lift, etc., complete. But excluding cost of steel reinforcement. For column concrete above Ground level
1
-
-
RCC 1:1.5:3 using 12-20mm HBS machine crushed metal for column concrete with form work including cost of all materials, M.Sand, curing, vibrating charges, labour, lead, lift, etc., complete. But excluding cost of steel reinforcement. For column concrete above Lintel level (Under LC condition)
1
-
-
RCC 1:1.5:3 mix using 12-20mm HBS machine crushed metal for Grade beam with form work including cost of all labour, materials, M.Sand,curing, vibrating charges, labour, lead, lift, etc. complete. But excluding cost of steel reinforcement.
0.5
-
-
RCC 1:1.5:3 mix using 12-20mm HBS machine crushed metal for continuous lintel and roof beam with formwork including cost of all materials, M.Sand, curing, vibrating charges, labour, lead, lift, etc., complete but excluding cost of steel reinforcement. (Ground floor)
0.25
-
-
RCC 1:1.5:3 mix using 12-20mm HBS machine crushed metal for continuous Roof beam with form work including cost of all materials, M.Sand, curing, vibrating charges, labour, lead, lift, etc., complete but excluding cost of steel reinforcement. (under LC condition)
0.25
-
-
Brickwork in CM 1:5 mix using class II chamber burnt bricks of size for super structure including cost of all materials, M.Sand, curing, labour, lead, lift, etc., complete. (Ground floor)
2
-
-
Brickwork in CM 1:5 mix using class II chamber burnt bricks of size for super structure including cost of all materials, M.Sand, curing, labour, lead, lift, etc., complete. (Under LC condition)
2
-
-
Refilling with excavated earth other than sand in foundation and well consolidation, watering including labour, lead , lift, etc., complete as per standard specification.
8
-
-
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, typing and fixing in position as per specification including cost of all materials, binding wire, labour, lead and lift etc., complete.
650
-
-
Plastering with cm 1:5 mix using 12mm thick for inside & outside walls, including cost of all materials, M.Sand, curing, labour, lead, lift etc., complete.
60
-
-
Colour washing two coats of cement paint over one coat of primer using white cement for outside wall surface including cleaning the plastered surface, cost of all materials, labour lead, lift etc., complete.
60
-
-
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
1
-
-
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
1
-
-
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements