Tamil Nadu Generation And Distribution Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date10 Dec 2024
Closing Date23 Dec 2024
Tender AmountRefer Documents
Costs
EMD
₹ 25,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Works Contract For West Division
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_EB_509616_1Bid Award Id
ViewTender No
SE/SEDC/WC.027/24-25dt.6.12.24Tender Authority
Tamil Nadu Generation And Distribution Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Stay bit 4.5” to 5” depth by using JCB or manual
120
-
-
... More
Hard Rock requires without blasting
30
-
-
... More
Medium rock and debse medium rock reqires blasting
15
-
-
... More
Erection of poles.
-
-
-
... More
PSC/ RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual
250
-
-
... More
PSC/ RCC poles/Metal poles above 8.00m by using JCB or maual
150
-
-
... More
Metal supports above 9.00m/ RSJ/ Rail pole/ Fabricated poles/ Tubular pole by using JCB or maual
15
-
-
... More
Erection of stay set complete
120
-
-
... More
Fixing of line materials
-
-
-
... More
HT V Cross arms / Channel Cross arms / Guarding Cross arm 3 1/2, 4 1/2 /Tapping Channel Cross arm
200
-
-
... More
LT 3 Phase cross arm
250
-
-
... More
LT single Phase cross arm
200
-
-
... More
HT / LT TI Fitting
120
-
-
... More
Fixing of Aluminium Knob
100
-
-
... More
Fixing of HT Pin Insulators (11/22 KV)
300
-
-
... More
Fixing of HT 11KV stain disc
200
-
-
... More
Fixing of HT 22KV stain disc
100
-
-
... More
Fixing of LT Pin Insulators
300
-
-
... More
Fixing of LT Shackle
250
-
-
... More
Paving and Stringing of conductor
-
-
-
... More
ACSR 7/4.09mm Raccoon conductor
3
-
-
... More
ACSR 7/3.35mm / AAAC 3.15 mm Rabbit conductor
9
-
-
... More
ACSR 7/2.59 mm / AAAC 2.50 mm weasel and ACSR 7/2.11 mm conductor
7
-
-
... More
Concreting of Poles
-
-
-
... More
Mass concreting including Materials (Cement + River sand/ M.Sand and Blue metals and watering)
29
-
-
... More
Sleeve concreting including cost of Materials and labour 375mm x 375mm x 50mm.
29
-
-
... More
Stay concreting including cost of Materials and labour 375mm x 375mm x 50mm.
21
-
-
... More
Earthing of Pole
-
-
-
... More
Earthing of pole with coil earthing including burying looping and binding.
30
-
-
... More
Replacement of earthing of pole with coil earthing including burying looping and binding
30
-
-
... More
Transport of Poles/Materials/ Conductors and other materials
-
-
-
... More
Transport of Poles/Materials/ Conductors and other materials (excluding loading and unloading charges) below 8 kms (Plains)
350
-
-
... More
Transport of Poles/Materials/ Conductors and other materials (excluding loading and unloading charges) 8 Kms. For additional Km (Irrespective of weight in tonnage)
200
-
-
... More
Transport of Poles road side to pole pit including loading and unloading
-
-
-
... More
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual up to 100 m
250
-
-
... More
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual beyond 100 m
150
-
-
... More
Loading & Unloading of Poles. & Materials
-
-
-
... More
Loading of poles upto 27"
200
-
-
... More
Loading of Metal (all sizes)
150
-
-
... More
Unloading of poles upto 27"
200
-
-
... More
Unloading of Metal (all sizes)
150
-
-
... More
Loading of materials
300
-
-
... More
Un-Loading of materials
300
-
-
... More
Erection of Transformer
-
-
-
... More
Loading or unloading of Transformer upto 100 KVA
10
-
-
... More
Loading or unloading of Transformer above 100 and upto 200KVA
10
-
-
... More
Loading or unloading of Transformer above 200 KVA
5
-
-
... More
Erection of New Transformer all capacities (with jumpering)
15
-
-
... More
Replacement of failed Transformers all capacities
5
-
-
... More
Loading/ unloading of HT Metering set
2
-
-
... More
Erection of HT Metering set
2
-
-
... More
Replacement of failed metering set
2
-
-
... More
Services Connections.
-
-
-
... More
Releasing of Single phase service wire and refixing.
150
-
-
... More
Releasing of Three phase service wire and refixing.
125
-
-
... More
Erection of street light including fixure fitting
15
-
-
... More
Dismantling of Line Materials
-
-
-
... More
Dismantling of transformer structure set
1
-
-
... More
Dismantling of Single pole transformer structure set
1
-
-
... More
Dismantling of DP Structure with AB switch, Top channel, Cross Bracing, Earthing, Painting, Providing stay and concreting.
1
-
-
... More
Dismantling of pole (9.0m and above).
25
-
-
... More
Dismantling of pole (7.5m and 8.0mtr).
30
-
-
... More
Dismantling of HT pin Insulator
121
-
-
... More
Dismantling of HT/LT TI Fitting
19
-
-
... More
Dismantling of 11 KV Strain Disc
100
-
-
... More
Dismantling of 22 KV Strain Disc
50
-
-
... More
Dismantling of LT 3 Phase X arm
100
-
-
... More
Dismantling of Tapping X arm, HT V Cross arms/ Channel Cross arms / Guarding cross arm
80
-
-
... More
Dismantling of 1 PH X arm
100
-
-
... More
Dismantling of Alu Knob
150
-
-
... More
Dismantling of LT pin Insulator
152
-
-
... More
Dismantling of LT Shackle Insulator
200
-
-
... More
Dismantling of Stay set complete
20
-
-
... More
Dismantling of ACSR 7/3.35mm
4
-
-
... More
Dismantling of ACSR 7/2.59mm & 7/2.11mm ACSR conductor
5
-
-
... More
Re-stringing of ACSR 7/3.35mm
1
-
-
... More
Re-stringing of ACSR 7/2.59mm
1
-
-
... More
Dismantling of street light including fixture fitting
15
-
-
... More
Lathe works
-
-
-
... More
Labour charges for alteration of Back Clamps / Stay Clamps to suit for the works
150
-
-
... More
Drilling of hole in channel only 3/4" & 1"
325
-
-
... More
Cutting of channel
29
-
-
... More
Cutting of RSJ poles
15
-
-
... More
T.I.Fitting welding with clamps
10
-
-
... More
Miscellaneous Works.
-
-
-
... More
Releasing of grills from RCC Poles
25
-
-
... More
Releasing of HTS wire from PSC poles
15
-
-
... More
Providing LT bus bar arrangement in DT structure loc.
25
-
-
... More
Erection of New 10' Earth pipe replacing the corroded earth pipe and renewal of earthing including burying looping and binding.
15
-
-
... More
Tree cutting works
-
-
-
... More
Cutting of coconut leaves (per tree)
100
-
-
... More
Clearing of branches of trees
190
-
-
... More
General
-
-
-
... More
Set right the leaning of poles (All size of poles)
9
-
-
... More
Engaging of JCB/ Crane for first 2 Hrs
4
-
-
... More
Engaging of JCB/ Crane For every additional Hrs
5
-
-
... More
Structure Erection
-
-
-
... More
Erection of Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of top channel, seating channel, belting angle including concreting (Except erection of Transformer)
6
-
-
... More
(Erection of Single Pole Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pit with collar including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure including concreting (Except erection of Transformer)
10
-
-
... More
Erection of D.P. structure with AB switch, top channel, cross bracing, earthing, painting, providing stay including concreting
2
-
-
... More
G.S.T. @18% should be Entered by the Bidder
1
-
-