Tamil Nadu Generation And Distribution Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date10 Dec 2024
Closing Date23 Dec 2024
Tender AmountRefer Documents
Costs
EMD
₹ 25,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Works Contract For East Division
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_EB_509653_1Bid Award Id
ViewTender No
SE/SEDC/WC.028/24-25dt.6.12.24Tender Authority
Tamil Nadu Generation And Distribution Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Hard rock without blasting (where houses are located)
10
-
-
... More
Stay pit 4.5' to 5' depth by using JCB or manual
120
-
-
... More
Erection of poles.
-
-
-
... More
PSC/ RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual
200
-
-
... More
PSC/ RCC poles/Metal poles above 8.00m by using JCB or manual
150
-
-
... More
Metal supports above 9.00m/ RSJ/ Rail pole/ Fabricated poles/ Tubular pole by using JCB or manual
10
-
-
... More
Erection of stay set complete
120
-
-
... More
Transport of Poles road side to pole pit including loading and unloading
-
-
-
... More
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual up to 100 m
160
-
-
... More
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual beyond 100m
200
-
-
... More
Transport of poles/Materials/ conductors and other materials (excluding loading and unloading charges.)
-
-
-
... More
Below 8 Kms (Plains)
250
-
-
... More
Above 8 Kms. For additional Km (Irrespective of weight in tonnage)
250
-
-
... More
Loading and unloading of poles:
-
-
-
... More
Loading of poles upto 8.0 M/ 27
200
-
-
... More
Unloading of poles upto 8.0 M/27
200
-
-
... More
Loading of poles above 8.0 M
150
-
-
... More
Unloading of Poles above 8.0 M
150
-
-
... More
Loading of metal poles (All sizes)
10
-
-
... More
Unloading of metal poles (All sizes)
10
-
-
... More
Loading of materials
100
-
-
... More
Unloading of materials
100
-
-
... More
Leading and stacking of materials
50
-
-
... More
Fixing of Cross Arms
-
-
-
... More
HT "V" cross arms (all types) / Channel cross arms/ Guarding Cross arms
250
-
-
... More
Double Channel X-arm
100
-
-
... More
Guarding Cross arm
100
-
-
... More
LT 3 phase cross arms
300
-
-
... More
LT Single phase cross arms
250
-
-
... More
HT/LT TI Fittings
150
-
-
... More
Fixing of Aluminium Knob
300
-
-
... More
Fixing of HT pin Insulators 22 KV
400
-
-
... More
Fixing of HT 11 KV strain disc.
150
-
-
... More
Fixing of HT 22 KV strain disc
150
-
-
... More
Fixing of LT pin Insulator
400
-
-
... More
Fixing of LT shackle
300
-
-
... More
Paving of Conductor, stringing etc., complete with ACSR/ AAAC for both HT/LT lines.
-
-
-
... More
ACSR 7/4.09 mm Raccoon conductor
3
-
-
... More
ACSR 7/3.35mm / AAAC 3.15 mm Rabbit conductor
7
-
-
... More
ACSR 7/2.59 mm / AAAC 2.50 mm weasel and ACSR 7/2.11 mm Conductor
10
-
-
... More
Guarding arrangements:
-
-
-
... More
Flat guarding including fixing of 2 Nos. cross arms
15
-
-
... More
HT Guarding
15
-
-
... More
Concreting of poles:
-
-
-
... More
Mass concreting including materials (Cement + River sand/ M sand and Blue metals and watering)
42
-
-
... More
Sleeve concreting including materials (Cement + River Sand/ M sand and Blue metals and watering)
50
-
-
... More
Earthing of pole with coil earthing including burying looping and binding
100
-
-
... More
Painting
-
-
-
... More
Painting of metal poles including cross arms (excluding cost of paint)
100
-
-
... More
Numbering of pole with paint and with base painting.
50
-
-
... More
Painting of Transformer (Double coat)
25
-
-
... More
Erection of Transformer
-
-
-
... More
Loading of Transformer upto 100 KVA
5
-
-
... More
Unloading of Transformer upto 100 KVA
5
-
-
... More
Loading of Transformer above 100 and upto 200 KVA
5
-
-
... More
Unloading of Transformer above 100 and upto 200 KVA
5
-
-
... More
Loading of Transformer above 200 KVA
2
-
-
... More
unloading of Transformer above 200 KVA
2
-
-
... More
Erection of New Transformer all capacities (with jumpering)
7
-
-
... More
Replacement of failed Transformers all capacities (with jumpering)
7
-
-
... More
Erection of HT Metering set
3
-
-
... More
Loading of HT Metering set
3
-
-
... More
Unloading of HT Metering set
3
-
-
... More
Lathe Works
-
-
-
... More
Labour charges for alteration of Back Clamps/ Stay Clamps to suit for the works
50
-
-
... More
Drilling of hole in channel only 3/4" & 1"
300
-
-
... More
Cutting of channel
150
-
-
... More
Cutting of RSJ pole
50
-
-
... More
RSJ pole welding
50
-
-
... More
Re-sagging of HT/LT lines
-
-
-
... More
Re-sagging ACSR 7/4.09 mm Raccoon conductor
1
-
-
... More
Re-sagging ACSR 7/3.35mm / AAAC 3.15 mm Rabbit conductor
2
-
-
... More
Re-sagging ACSR 7/2.59 mm / AAAC 2.50 mm Weasel and ACSR 7/2.11 mm conductor
3
-
-
... More
Releasing of ACSR/AAAC conductors from conductor drum and coiling 7/2.59, AAAC 7/2.50, ACSR 7/3.35, 7/3.15 MM
10
-
-
... More
Service Erected:
-
-
-
... More
Erection of street light including fixure fitting
50
-
-
... More
Erection of street light service
10
-
-
... More
Fixing of new SV/MV lamp fittings
10
-
-
... More
Agricultural service fixing
50
-
-
... More
Releasing of single phase service and re-fixing.
150
-
-
... More
Releasing of 3 phase service and (upto 50 HP) re-fixing.
200
-
-
... More
Releasing of 3 phase service and (above 50 HP) re-fixing.
50
-
-
... More
Releasing of grills from RCC Poles
50
-
-
... More
Tree cutting works
-
-
-
... More
Cutting of coconut leaves (per tree)
150
-
-
... More
Clearing of branches of trees
100
-
-
... More
DT/ DP erection
-
-
-
... More
Erection of Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of top channel, seating channel, belting angle including concreting (Except erection of Transformer)
5
-
-
... More
Erection of Single Pole Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pit with collar including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure including concreting (Except erection of Transformer)
8
-
-
... More
Erection of D.P. structure with AB switch, top channel, cross bracing, earthing, painting, providing stay including concreting
3
-
-
... More
Dismandling of Line Materials
-
-
-
... More
Dismandling of Transformer structure Complete
2
-
-
... More
Dismantling of Single pole Transformer Structure complete
2
-
-
... More
Dismantling of D.P Structure complete
1
-
-
... More
Dismandling of pole from pole pit (9.0m and above)
80
-
-
... More
Dismandling of pole from pole pit (7.5mtr & 8mtr)
100
-
-
... More
Dismandling of pole (9.0m and above)
80
-
-
... More
Dismandling of pole (7.5mtr & 8mtr)
100
-
-
... More
Dismandling of HT 22 KV Pin Insulator
100
-
-
... More
Dismandling of HT TI Fitting
50
-
-
... More
Dismandling of11 KV disc
100
-
-
... More
Dismandling of 22 KV disc
60
-
-
... More
Dismandling of 3 PH X arm
150
-
-
... More
Dismandling of Tapping X arm, V X arm & Guarding X arm
120
-
-
... More
Dismandling of 1 PH X arm
150
-
-
... More
Dismandling of Alu Knob
150
-
-
... More
Dismandling of LT pin Insulator
200
-
-
... More
Dismandling of LT Shackle Insulator
200
-
-
... More
Stay set complete dismandling
30
-
-
... More
Dismandling of 7/4.09 mm ACSR conductor
2
-
-
... More
Dismandling of 7/3.35 mm ACSR conductor
3
-
-
... More
Dismandling of 7/2.59 & 7/2.11 mmACSR conductor
5
-
-
... More
Dismantling of Guarding
4
-
-
... More
Dismantling of St light fitting
12
-
-
... More
Dismantling of st light SC
5
-
-
... More
G.S.T. @18% should be Entered by the Bidder
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements