Tamil Nadu Generation And Distribution Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender

Works
Electrical Generators And Transformers
Electrical and Electronics
Electrical Works
Eprocure
Opening Date30 Oct 2024
Closing Date13 Nov 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Attending Preventive Maintenance And Breakdown Works Of Steam Generator And Its Auxiliaries For A Period Of 180 Days From The Date Of Taking Over Of The Site

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Attending preventive maintenance and breakdown works of Steam Generator and its Auxiliaries for a period of 180 Days from the date of taking over of the site
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Lowering the coils for cutting, grinding and welding with providing proper chain block support and lifting the same coils after completion of works including the charges like consumables, T&P’s and etc.,

8

-

-

... More
Fin welding including the cost of Welding electrode, all consumables, hire charges for welding generator & other T&P’s etc.

60

-

-

... More
Opening of all manhole doors, and closing manhole doors after completion work including changing of asbestos ropes and clamps in the doors in Boiler area.

100

-

-

... More
Arrangement of platform and scaffolding materials and erection of the same wherever required in the boiler area for tube rectification work / hydro test and transporting the scaffolding materials.

16

-

-

... More
Transporting the ash from 17m to ‘0’m and dumping the ash into MTPS Ash dyke by pulley arrangements including cost of consumables, hire charges for T&P’s, etc.,

20

-

-

... More
Charges for transportation, Assembling and dismantling of Temporary maintenance platform / Sky climber for Shut down Maintenance works.

10

-

-

... More
Operation of Temporary maintenance platform / Sky climber as per the requirements to assist various works such as Burner cleaning, tube thickness survey, tube rectification works if any etc,

60

-

-

... More
Shifting the Temporary maintenance platform / Sky climber inside the furnace for access of LHS / RHS side.

6

-

-

... More
Shifting the Temporary maintenance platform / Sky climber inside the furnace for access of Front / Rear side.

12

-

-

... More
Overhauling of valves including dismantling, inspection, rectification of defects, if any, lapping of valve seat and disc, renewal of sealing rings/gland packing etc., cleaning of all parts, freeing of all fasteners, inspection of drive bush, bearings, etc., renewing if necessary, assembling the valve, yoke and actuators Main steam stop valve, (18 inches) feed water main isolation valves (20 inches)

3

-

-

... More
Overhauling of valves including dismantling, inspection, rectification of defects, if any, lapping of valve seat and disc, renewal of sealing rings/gland packing etc., cleaning of all parts, freeing of all fasteners, inspection of drive bush, bearings, etc., renewing if necessary, assembling the valve, yoke and actuators 200/250 size of valves

2

-

-

... More
Overhauling of valves including dismantling, inspection, rectification of defects, if any, lapping of valve seat and disc, renewal of sealing rings/gland packing etc., cleaning of all parts, freeing of all fasteners, inspection of drive bush, bearings, etc., renewing if necessary, assembling the valve, yoke and actuators 150/250, 100/250 and 65/250 size of valves

15

-

-

... More
Overhauling of valves including dismantling, inspection, rectification of defects, if any, lapping of valve seat and disc, renewal of sealing rings/gland packing etc., cleaning of all parts, freeing of all fasteners, inspection of drive bush, bearings, etc., renewing if necessary, assembling the valve, yoke and actuators 400/40 and 300/40 size of valves

3

-

-

... More
Overhauling of valves including dismantling, inspection, rectification of defects, if any, lapping of valve seat and disc, renewal of sealing rings/gland packing etc., cleaning of all parts, freeing of all fasteners, inspection of drive bush, bearings, etc., renewing if necessary, assembling the valve, yoke and actuators 250/40, 200/40, 150/40 and 100/40 size of valves

4

-

-

... More
Overhauling of valves including dismantling, inspection, rectification of defects, if any, lapping of valve seat and disc, renewal of sealing rings/gland packing etc., cleaning of all parts, freeing of all fasteners, inspection of drive bush, bearings, etc., renewing if necessary, assembling the valve, yoke and actuators 40 mm to 50 mm size of valves

20

-

-

... More
Overhauling of valves including dismantling, inspection, rectification of defects, if any, lapping of valve seat and disc, renewal of sealing rings/gland packing etc., cleaning of all parts, freeing of all fasteners, inspection of drive bush, bearings, etc., renewing if necessary, assembling the valve, yoke and actuators 15mm to 20mm size of valves

4

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.