Tamil Nadu Generation And Distribution Corporation Limited Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date10 Oct 2023
Closing Date16 Oct 2023
Tender Amount₹ 10,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Rocky ground- Erection of 8m 200 Kg PSC poles

1

-

-

... More
Hard Rock requring Blasting and Chisseling (Specific approval obtained from EE) - Excavation of Pole pits (1.25m * 0.6m*1.83m) for 8m 200 Kg PSC poles

1

-

-

... More
Hard Rock requring Blasting and Chisseling (Specific approval obtained from EE) - Erection of 8m 200 Kg PSC poles

1

-

-

... More
Normal ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M 300/ 400 Kg PSC Poles & 9.14M RCC poles

1

-

-

... More
Normal ground- Erection of 9M 300/ 400 Kg PSC Poles & 9.14M RCC poles

1

-

-

... More
Rocky ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M 300/ 400 Kg PSC Poles & 9.14M RCC poles

1

-

-

... More
Rocky ground- Erection of 9M 300/ 400 Kg PSC Poles & 9.14M RCC poles

1

-

-

... More
Hard Rock requring Blasting and Chisseling (Specific approval obtained from EE) - Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M 300/ 400 Kg PSC Poles & 9.14M RCC poles

1

-

-

... More
Hard Rock requring Blasting and Chisseling (Specific approval obtained from EE) - Erection of 9M 300/ 400 Kg PSC Poles & 9.14M RCC poles

1

-

-

... More
Normal ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for above 9.14M poles & 36' /40'/42' length RS Joists

1

-

-

... More
Normal ground- Erection of above 9.14M poles & 36'/40'/42' length RS Joists

1

-

-

... More
Rocky ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for above 9.14M poles & 36'/40'/ 42' length RS Joists

1

-

-

... More
Rocky ground- Erection of above 9.14M poles & 36' /40'/42' length RS Joists

1

-

-

... More
Hard Rock requring Blasting and Chisseling (Specific approval obtained from EE) - Excavation of Pole pits (1.25m * 0.6m*2.19m) for above 9.14M poles & 36'/40'/ 42' length RS Joists

1

-

-

... More
Hard Rock requring Blasting and Chisseling (Specific approval obtained from EE) - Erection of above 9.14M poles & 36'/40'/ 42' length RS Joists

1

-

-

... More
Transporting of poles from road side to pole pit - 8m PSC pole upto 2 Km

1

-

-

... More
Transporting of poles from road side to pole pit - 9m 300/400 Kg PSC, 9.14m RCC pole upto 2 Km

1

-

-

... More
Transporting of poles from road side to pole pit - RSJ 36'/40' Pole upto 2 Km

1

-

-

... More
Transporting of poles from road side to pole pit - RSJ 42' and above upto 2 Km

1

-

-

... More
Loading and Unloading of poles - 8m PSC Pole

1

-

-

... More
Loading and Unloading of poles - 9m 300/400 Kg PSC, 9.14m RCC

1

-

-

... More
Loading and Unloading of poles - RS Joists, tubular & rail pole (above 9.14m)

1

-

-

... More
Concreting of poles as per Board Standards (2'*2'*5'). The material such as cement, sand, jally, etc., have to be supplied by the contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sand,jally,form box and water curing for 14 days etc,.)

1

-

-

... More
Coping of pole (0.6m*0.6m*0.35m)

1

-

-

... More
Concreting of stay (o.3m * 0.3m * 1.5m) including materials

1

-

-

... More
Coil earthing per pole & pole earthing

1

-

-

... More
Normal ground- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set)

1

-

-

... More
Normal ground- Erection of stay set

1

-

-

... More
Rocky ground- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set)

1

-

-

... More
Rocky ground- Erection of stay set

1

-

-

... More
Hard Rock requring Blasting and Chisseling (Specific approval obtained from EE) - Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set)

1

-

-

... More
Hard Rock requring Blasting and Chisseling (Specific approval obtained from EE) - Erection of Stay Set

1

-

-

... More
Loading and Unloading charges of Oil drums (with oil)

1

-

-

... More
Loading and Unloading charges of Oil drums (without oil)

1

-

-

... More
Loading and Unloading charges of Conductor Drum, Cable Drum

1

-

-

... More
Loading and Unloading charges of Line Materials

1

-

-

... More
Loading and Unloading charges of Metering Set

1

-

-

... More
Fixing of V & Channel cross arm 5' including transporting of materials from road side to site

1

-

-

... More
Fixing of V & Channel cross arm 4.5' including transporting of materials from road side to site

1

-

-

... More
Fixing of V & Channel cross arm 3.5' including transporting of materials from road side to site

1

-

-

... More
Fixing of LT 3Phase cross arm including transporting of materials from road side to site

1

-

-

... More
Fixing of LT 1Phase cross arm including transporting of materials from road side to site

1

-

-

... More
Fixing of HT/ LT TI fitting including transporting of materials from road side to site

1

-

-

... More
Erection of HT Side arm with stud including transporting of materials from road side to site

1

-

-

... More
Erection of LT Side arm with stud including transporting of materials from road side to site

1

-

-

... More
Fixing of HT/LT insulator / LT shackle (per location) including transporting of materials from road side to site

1

-

-

... More
Fixing of 11 KV Disc including transporting of materials from road side to site

1

-

-

... More
Fixing of Tapping Channel Cross arm including transporting of materials from road side to site

1

-

-

... More
LT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/2.50 AAAC

1

-

-

... More
LT/HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/3.15 AAAC

1

-

-

... More
HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/4.09 ACSR

1

-

-

... More
HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For Dog Conductor

1

-

-

... More
For LT/HT line clear works (Please mention in % for respective conductor stringing)

1

-

-

... More
Guarding per span length- Spilt Neutral Guarding

1

-

-

... More
Guarding per span length- Flat Guarding (2 wires)

1

-

-

... More
Guarding per span length- Flat Guarding (4 wires)

1

-

-

... More
Guarding per span length- Flat Guarding (6 wires)

1

-

-

... More
Guarding per span length- Cradle Guarding (Fixing of ' X' arm)

1

-

-

... More
Guarding per span length- Fixing of one earthing device with stud

1

-

-

... More
Erection of transformer/dismantling upto 100 KVA

1

-

-

... More
Erection of transformer/dismantling for 250KVA

1

-

-

... More
Erection of transformer/dismantling for 500KVA

1

-

-

... More
Erection of centre support (Including concrete)

1

-

-

... More
Erection of Metering Set

1

-

-

... More
Erection of feeder cable with open type fuse unit per feeder

1

-

-

... More
Erection of feeder cable with open type fuse unit - for each addl feeder

1

-

-

... More
Erection of feeder cable -Bus bar arrangement with open type

1

-

-

... More
Loading & unloading of Distribution transformer below 250KVA

1

-

-

... More
Loading & unloading of Distribution transformer 250KVA

1

-

-

... More
Loading & unloading of Distribution transformer 500KVA

1

-

-

... More
Plinth work for 500KVA DT with construction material

1

-

-

... More
Fabrication, erection and excavation for centre support etc for 250/500 DT including transporting

1

-

-

... More
LED tube light erected in complete set (including transport)

1

-

-

... More
Painting of SC Number including Painting

1

-

-

... More
Manufacturing of clamps 50*8 mm

1

-

-

... More
Manufacturing of clamps 65*10 mm

1

-

-

... More
Alteration of clamps

1

-

-

... More
Street light switching point arrangement

1

-

-

... More
Drilling less than 23mm holes per hole/slotted hole

1

-

-

... More
Cutting of channel

1

-

-

... More
Cutting of Flat

1

-

-

... More
Cutting of Angle

1

-

-

... More
RSJ pole cutting

1

-

-

... More
Tubular pole cutting

1

-

-

... More
Rail pole cutting

1

-

-

... More
Fabrication of lightning arrestor frame

1

-

-

... More
LT-Changing of pin point to cut point

1

-

-

... More
HT-Changing of pin point to cut point

1

-

-

... More
Erection of service connection materials-1Ph service

1

-

-

... More
Erection of service connection materials-3Ph service

1

-

-

... More
Dismantling of deteriorated poles with concrete in damaged condition including grill separation etc.,

1

-

-

... More
Dismantling of poles without concrete in damaged condition including grill separation etc.,

1

-

-

... More
Providing jumpering at cut point

1

-

-

... More
complete replacement of worn out earth wire per structure

1

-

-

... More
Labour for manufacturing of open type fuse unit (Materials supplied by board)

1

-

-

... More
Manufacturing of HG fuse stool (Materials supplied by board)

1

-

-

... More
Tree clearence in HT or LT location

1

-

-

... More
Painting-Double pole Transformer structure materials (Double coat) including material

1

-

-

... More
Painting-Pole (Colour washing with distember) including material

1

-

-

... More
Painting-For transformer only (Double coat with paint)

1

-

-

... More
Numbering of poles with paint (Labour)

1

-

-

... More
Numbering of Distribution Trnasformer (Painting and writing of name board size-1-1/4*1 incl cost of paint and MS sheet

1

-

-

... More
Writing in seating channel with paint

1

-

-

... More
Painting of RCC Strcucture poles all metal parts, snowcem & aluminium paint with paint

1

-

-

... More
Painting of RSJ structure poles & metal parts-aluminium paint with paint

1

-

-

... More
Set right of leaning HT pole/LT pole including x arms, TI fittings

1

-

-

... More
Transformer structure erection-Excavation of structure pole pits ( 2 Nos)

1

-

-

... More
Transformer structure erection-Erection of structure poles (2 Nos)

1

-

-

... More
Transformer structure erection-Excavation of stay pits(4Nos)

1

-

-

... More
Transformer structure erection-Erection of stay set (4Nos)

1

-

-

... More
Transformer structure erection-Concreting of structure poles incl.materials mass concrete with copping

1

-

-

... More
Transformer structure erection-Concreting of stays (4Nos) incl.materials

1

-

-

... More
Erection of Structure materials-Top Channel

1

-

-

... More
Erection of Structure materials-Transformer seating channel and belting angle

1

-

-

... More
Erection of Structure materials-AB switch (Complete)

1

-

-

... More
Erection of Structure materials-HG fuse (Complete)

1

-

-

... More
Erection of Structure materials-Jumpering

1

-

-

... More
Fixing of Structure materials-HT LAS

1

-

-

... More
Fixing of Structure materials-LT LAS

1

-

-

... More
Erection of Structure materials - Transformer LT cable wiring / LT Bus Bar

1

-

-

... More
Erection of LT Open type fuse unit including cable jumbering up to the line including cutting welding bending, fabrication etc

1

-

-

... More
Earthing system-Excavation of 4 Nos. earth pits

1

-

-

... More
Earthing system-Excavation of earth wire trenches and paving of earth wire, Erection of 4 Nos. earth pipe and giving earth connection, Earthing of all metal parts, LAS etc., including central connection

1

-

-

... More
Earthing system-Mason works with brick for earth pits 4 Nos (cement supplied by Contractor)

1

-

-

... More
Earthing system- Transporting of structure materials ABS, HG Fuse, cable etc Except Pole

1

-

-

... More
Earthing system- Fixing of Danger Board (labour Only)

1

-

-

... More
Earthing system-Spreading yard jalli and cut stone and bricks including material

1

-

-

... More
Erection of Tapping structure-Excavation of structure pole pit. 2 Nos

1

-

-

... More
Erection of Tapping structure-Erection of structure pole. 2 Nos

1

-

-

... More
Erection of Tapping structure-Excavation of stay pit. 2 Nos

1

-

-

... More
Erection of Tapping structure-Erection of stay set. 2 Nos

1

-

-

... More
Erection of Tapping structure-Concreting of pole including materials mass concrete with copping 2 Nos

1

-

-

... More
Erection of Tapping structure-Concreting of stay 2 Nos.

1

-

-

... More
Erection of Structure materials-Top channel

1

-

-

... More
Erection of Structure materials-AB switch (complete)

1

-

-

... More
Erection of Structure materials-Assemble, operating pipe fixing etc., fixing of cross bracing

1

-

-

... More
Earthing system-Excavation of 1 No. earth pits Excavation of earth wire trench and paving of earth wire, Erection of 1 No. earth pipe and giving earth connection, Earthing of all metal parts, for tapping structure.

1

-

-

... More
Earthing system-Mason works for earth pit (including material)

1

-

-

... More
Colour coating on poles with iron materials including paint and distember

1

-

-

... More
Transporting of 42' twin RSJ pole from roadside pole pit

1

-

-

... More
Fabrication of 42' Twin RSJ pole, Materials supplied by Board.

1

-

-

... More
Excavation & Erection of Twin 42' fabricated RSJ pole

1

-

-

... More
Concreting of 42' twin RSJ pole

1

-

-

... More
Loading & Unloading of 42' twin RSJ pole

1

-

-

... More
Re-Sagging of Conductor

1

-

-

... More
Dismantling of 8m PSC pole

1

-

-

... More
Dismantling of 9m PSC/ 9.14m RCC Pole/ RSJ

1

-

-

... More
Dismantling of stay set complete

1

-

-

... More
Replacement of detoriated stay rod

1

-

-

... More
Replacement of RSJ/Tubular poles below 30 feet

1

-

-

... More
Replacement of RSJ/Tubular poles above 30 feet

1

-

-

... More
Dismantling of detoriated cables of various size (95,120,185 sq.mm) from DT, LT bushing to LT open type clamp and erection of suitable lug at both ends

1

-

-

... More
Replacement of new 10' earth pipe replacing the corroded earth pipe and renewal of earthing including burying, looping and binding

1

-

-

... More
Mass Concrete for poles (All Materials including) (Ratio 1:2:4) (0.72 m3) (0.65*0.65*1.65 m,0.6*0.6*0.35 Cum)

1

-

-

... More
Sleeve Concrete for poles (All Materials including cement) (Ratio 1:2:4) (0.202) (0.5*0.45*0.9M)

1

-

-

... More
Providing of Spacers in LT Lines

1

-

-

... More
Hiring of JCB

1

-

-

... More
Hiring of Crane

1

-

-

... More
Exceeding 1 Hour for every hour

1

-

-

... More
Transporting Charges for DT / Line materials using private vehicle upto 20 KM (Up and Down)

1

-

-

... More
Beyond 20 KM for every KM

1

-

-

... More
Single pole structure erection- 9.0 mtr RCC POLE (square) -Loading & Unloading of poles

1

-

-

... More
Single pole structure erection- 9.0 mtr RCC POLE (square) -Excavation of pole pit & pole erection

1

-

-

... More
Single pole structure erection- 9.0 mtr RCC POLE (square) -Transporting road side to pole pit

1

-

-

... More
Single pole structure erection-Excavation and erection of stay set complete with stay clamps ( with 16mm stay rod with base plate )

1

-

-

... More
Fixing of single pole structure materials & structure clamps ( Tapping channel - 1 No., Tr.bed, Erection AB switch - 1 set, Erection HG Fuse set - 1 set )

1

-

-

... More
Erection of 16/25 KVA DT

1

-

-

... More
Earthing for 9 mtr RCC structure square pole (3 pits)

1

-

-

... More
Concreting including materials for 9 mtr RCC square pole-Base concreting 1:4:8 500*650*150mm, Pole concreting1:2:4 500*500*1700 & Coping 1:2:4 ( as per actuals )

1

-

-

... More
Erection of LT wiring kit ( Double open type circuit)

1

-

-

... More
Fixing of caution / Danger Board as per drawing

1

-

-

... More
Painting of single pole str including iron materials double coat with painting materials

1

-

-

... More
Maintenance of AB switch-Replacement of male and female one number contact and PTinsulator

1

-

-

... More
Maintenance of AB switch-Cleaning of contacts, lubrication and checking of operating pipe movments

1

-

-

... More
Maintenance of Distribution Transformer-Cleaning of HT/LT Bushings, Oil level checking , Silical gel replacement, Terminal tightness checking, Cleaning of DT yard, earth pit watering and maintenance of open types, Providing of 'g' jumpering etc.,

1

-

-

... More
Dismantling of other line materials - (Please mention In percentage for respective line material errection works)

1

-

-

... More
corroded pole welding with 4 piece of iron

1

-

-

... More
Welding joint for RSJ pole per foot

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.