Tamil Nadu Generation And Distribution Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Electrical Cables And Wires
Electrical and Electronics
Eprocure
Opening Date14 Nov 2024
Closing Soon3 Dec 2024
Tender AmountRefer Documents
Costs
EMD
₹ 1,14,800Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_EB_501192_1Tender No
CED/CNR/C216/2024-25Tender Authority
Tamil Nadu Generation And Distribution Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Drilling, Reaming & Laying of 33 KV Cable (3Nos). Using Trenchless Technology Method at a depth of about 1.50meters or more by using directional drilling unit equipped with automated pipe handling system (Horizontal Directional Drilling Machine), Using bentonite mud mixing system and all necessary accessories using pulling the cable carefully without damaging other service like telephone, Internet cables, Water pipes, etc., installation including cost of pipe, hire charges for all the accessories and equipment etc. Taking the necessary drive pit for drilling & laying the cable, remove the excavated earth. The rate quoted for including the charge of GPR (Ground Penetrating radar ) Survey for identify the existing utility in the proposed bore path and including cost of making entry pit and exit pit for every 250 meters minimum intervals.
3015
-
-
Dismantling the brickwork, PCC , RCC inside the cable trench and cable duct wherever occur of any thickness and clearing the trench/duct free from debris and without hinderence to the cable laying work including lead, lift, labour, tools & plants etc., complete as per direction of Engineer-in-charge.
-
-
-
Dismantling B.W.
1
-
-
Dismantling P.C.C.
1
-
-
Dismantling R.C.C.
1
-
-
Providing M.S. barricading 1.5m Height Using M.S Sheet 4 mm thick MS Angle 50 x 50 x 8 mm Base Channel 100 x 50 and covering with green cloth for a height of 1.5m inclusive of all materials, leads, lifts, labour,welding and Erection , Transporting at site, Placing in position, Shifting to New Location after completing works, Tools, & Plants etc., Complete
84
-
-
Laying plain cement concrete 1:3:6, using 20mm BG metal for bottom portion of trench for fixing PVC pipe in the cable duct in proper alignment and level as per std. specification including cost of all materials, labour, lead,lift etc., complete.
6
-
-
Transporting of 33 KV Cable drums inlcuding cost of loading at stores, unloading of 33KV cable drums each weighing approximately 7T in lorries using truck mounted crane for both loading and unloading including cost of labour required, etc.,
19
-
-
Laying of 1x630 sq.mm 33KV XLPE UG cable by means of winch over rollers provided by contractor. The rate includes the cost of pulling the steel wire rope from winch side to drum side providing labour as required at site for tying the cable in trefoil formation with nylon rope/etc., complete.
143
-
-
Refilling with filling sand in layers well consolidated asper std. specification including cost of all materials,labour,lead, lift etc.complete.
53.5
-
-
Supply and laying RCC cover slab (60cmx50cmx5cm) including cost of slab, stencilling and laying carefully as directed by the Engineer including cost of all materials,labour, leads, lifts, etc., complete.
297
-
-
Refilling with excavated earth in layers and well consolidated as per std. specification including cost of all materials,labour,lead lift etc.,complete.
63
-
-
Transporting and clearing the excess excavated earth and debris then and there immediately to avoid any hinderence to the normal flow of traffic and public beyond a distance of 5km from the work spot as per the direction of Engineer - in - charge including loading and unloading etc.,
63
-
-
Transporting of 33 KV empty drums loading at site, and devolution of empty 33KV steel cable drum each weighing 1 to 1.5T from various work site (3drums at a time) and balance cables if any to departmental stores
19
-
-
Providing watch and ward (unskilled) at site as instructed by the Engineer incharge at site.
42
-
-
Bailing out water from cable trench and duct while excavating and also while laying cable using 5HP diesel pump including cost of fuel, operator etc.,
70
-
-
Providing 18 gauge alumininum strip with Nylon tie at 10m intervals for engraving voltage level, size of the cable, name of the feeder including cost of all materials, labour charges, transportation charges, etc., complete. (Every 10m intervals)
13
-
-
Casting & placing of RCC offset slab (cable route indication slab)of size 750x750x60 mm casting in RCC 1:2:4 using 12 to 20 mm HBG metal with necessary reinforcement,piling,shuttering,curing, transport from casting yard to various locations & fixing the slab along 33KV cable route as directed by site Engineer at site with PCC 1:3:6 including cost of all materials,labour,lead,lift etc including 2 coats of flourescent painting.
65
-
-
GST @ 18%
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%