Tamil Nadu Generation And Distribution Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Electrical Cables And Wires
Electrical and Electronics
Electrical Works
Eprocure
Opening Date8 Jul 2022
Closing Date21 Jul 2022
Tender AmountRefer Documents
Costs
EMD
₹ 25,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_EB_240544_1Bid Award Id
ViewTender No
spec 22 22-23 dt 8.7.22Tender Authority
Tamil Nadu Generation And Distribution Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Rate contract for Erection dismantling laying of HT LT cable for improvement extension DCW works and allied works and maintenance works in respect of AEE Chintadripet Pudupet Park Town subdivision of Anna Salai division for One year
Rate contract for Erection dismantling laying of HT LT cable for improvement extension DCW works and allied works and maintenance works in respect of AEE Chintadripet Pudupet Park Town subdivision of Anna Salai division for One year
BOQ Items
Transporting of 9.14 m poles from Road side to pole pit
1
-
-
Structure pole mass Concreting and coping 0.6x0.6x1.65 for DP structure Including cost of materials and cement.
1
-
-
Erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing. DPDC channel, T.I. Fitting etc., in complete.
1
-
-
Erection of HG fuse set with transport
1
-
-
Erection of 11 KV AB switch complete set with transport
1
-
-
Transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., complete including cost of coal and salt
1
-
-
Erection of Aluminium bus bar pipe complete for H.T. Bus bar arrangements for DP Structure
1
-
-
For Triple Pole and four pole structure
1
-
-
Erection of L.T. Open type fuse unit including cable jumpering upto the line.
1
-
-
Providing LT bus bar arrangements in DT structure including fixing of cross arm and insulator.
1
-
-
Erection of H.T. jumpering in DP structure complete
1
-
-
Erection of H.T. LAS
1
-
-
Erection of L.T. LAS
1
-
-
Erection of DT excluing loading and unloading
-
-
-
Upto 100 KVA
1
-
-
Above 100 KVA
1
-
-
Painting of two coats of Aluminium paints for DP structure and iron materials including cost of paint and distemper etc.
1
-
-
Loading and unloading of Distribution Transformer at site and store.
1
-
-
Dismantling of failed DT from the structure including removing HT & LT connection and all other incidental works. (excluding loading and unloading)
-
-
-
Upto 100 KVA
1
-
-
Above 100 KVA
1
-
-
Crane hire charges
1
-
-
LAYING OF HT CABLE
-
-
-
Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc.,
-
-
-
Normal Road (earth)
1
-
-
Tar Road
1
-
-
Concrete Road
1
-
-
Transporting of 11 KV HT cable from departmental stores to work spot by engaging private vehicle including recoiling , coiling and loading and unloading at both sites.
-
-
-
3x300 sq mm XLPE (1 drum: 200 m)
1
-
-
3x120 sq mm XLPE (1 drum: 200 m)
1
-
-
LAYING OF HT CABLE
-
-
-
Laying of 300 sq mm XLPE cable
1
-
-
Laying of 120 sq mm XLPE cable
1
-
-
Covering HT cable by cement "V" trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & Cable size on the trough
1
-
-
Refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete.
1
-
-
Transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 empty drums)
1
-
-
LAYING OF LT CABLE
-
-
-
Tansport of LT cable to work site by engaging vehicle including recoiling, coiling, loading & unloading at both sites.
-
-
-
240 sq.mm ( 1 drum - 200 m)
1
-
-
120 sq. mm ( 1 drum - 500 m)
1
-
-
25 sq. mm ( 1 drum - 500 m)
1
-
-
16 sq. mm ( 1 drum - 500 m)
1
-
-
Excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and T&P etc.
-
-
-
Normal Road (earth)
1
-
-
Tar Road
1
-
-
Concrete Road
1
-
-
LAYING OF LT CABLE
-
-
-
Laying of 240 sq.mm cable
1
-
-
Laying of 120 sq.mm cable
1
-
-
Laying of 25 sq.mm cable
1
-
-
Laying of 16 sq.mm cable
1
-
-
Excavation of 11KV straight joint pit
1
-
-
Refilling with excavated earth layers as per std specification including all materials, lead, lift etc., complete.
1
-
-
ERECTION OF PILLAR BOX
-
-
-
Erection of pillar box including excavation of foundation pits as per standard specification 2 Nos pillar concrete walls, coping and earthing including cost of all materials, elec. works, transportion, lead, lift etc.,
-
-
-
4/6/8 way, HRC & mini pillar boxes for 2 feet i-e 0.6m
1
-
-
4/6/8 way,HRC & mini pillar boxes for 3 feet i-e 0.9m(Rate for HB/Con)
1
-
-
4/6/8 way, HRC & mini pillar boxes for 4 feet i-e 1.2 m(Rate for HB/Con)
1
-
-
4/6/8 way, HRC & mini pillar boxes for 5 feet i-e 1.5 m(Rate for HB/Con)
1
-
-
Cleaning & painting with Aluminium paint 2 coats & numbering with fdr details
-
-
-
8 way pillar box/HRC Pillar Box
1
-
-
6 way pillar box/HRC Pillar Box
1
-
-
4 way pillar box/HRC Pillar Box
1
-
-
Mini way pillar box/HRC Pillar Box
1
-
-
DISMANTLING OF PILLAR BOX
-
-
-
Dismantling of old pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking.
-
-
-
4/6/8 way pillar box/HRC pillar Box
1
-
-
Mini pillar box/HRC pillar Box
1
-
-
Erection of cross bracing set
-
-
-
DP structure
1
-
-
TP structure
1
-
-
Erection of Top Channels
-
-
-
10' Centre
1
-
-
15' Centre
1
-
-
Erection of 33 KV centre rotating AB switch complete set
1
-
-
Erection of 11 KV centre rotating AB switch complete set
1
-
-
Metering set loading & unloading
-
-
-
Loading
1
-
-
Un loading
1
-
-
Erection of metering sets
-
-
-
Up to 11 metering set
1
-
-
A).Loading of poles
-
-
-
9.14 meters pole RCC /9.0 mtr PSC/9.14 RSJ /Each
1
-
-
B).Un Loading of poles
-
-
-
9.14 meters pole RCC /9.0 mtr PSC/9.14 RSJ /Each
1
-
-
MAINTENANCE WORK
-
-
-
Maintenance of DT structure for various capacity (pole mounted structure)
1
-
-
DP/TP Structure maintenance
1
-
-
DT maintenance
1
-
-
Replacement of HT Bushing rod
1
-
-
Replacement of LT Bushing rod
1
-
-
Replacement of Gasket
1
-
-
Structure earthi re - wiring .
1
-
-
Replacement of Structure earthing in complete without material
1
-
-
DT structure Yard cleaning
1
-
-
Numbering of location including cost of paint and labour
1
-
-
Maintenance of pillars works such as replacement of damaged insulators worn out stem bolts, lugs, termination of cables and dressing.
-
-
-
8 way pillar box /6 way pillar box
1
-
-
4 way pillar box
1
-
-
Mini pillar box
1
-
-
HRC Fuse Pillar Box
1
-
-
Fixing of Missing Doors in Pillars including materials
-
-
-
MS Mini Pillar Door
1
-
-
MS 4 Way Pillar Door
1
-
-
MS 6 Way / 8 way Pillar Door
1
-
-
FRP 4 Way Pillar Door
1
-
-
Maintenance of 11 KV ABS only. (Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating).
-
-
-
11 KV AB switch at structure in work site
1
-
-
11 KV AB switch at SS
1
-
-
Maintenance of 33 KV ABS only. (Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating).
-
-
-
33 KV AB switch at SS/ Structure
1
-
-
Tree Clearance
1
-
-
Cutting of big tree fouling on the line.
1
-
-
Clearing of heavy bushes
1
-
-
Jungle/bushes/velikathan clearence
1
-
-
DISMANTLING WORKS
-
-
-
Dismantling of 9.14 Mtr. Poles/RSJ/Tubular Poles
1
-
-
Dismantling of damaged 6 way / 4 way Pillar box
1
-
-
Dismatling of Transformer structure materials
1
-
-
Dismatling of AB Switch with HG Fuse set
1
-
-
Releasing of " V " X Arm
1
-
-
Stacking of materials / Scarp
1
-
-
Substation Maintenance
-
-
-
Removing weed in Substation/Office premises per sq.mtr(Jungle Clearance)
1
-
-
Hot oil circulation for replacement of Tr.oil in Pr.Tr. With filter machine & loading.
1
-
-
Transporting of filter machine unit& oil drum (to&fro)
1
-
-
Cleaning of 110 KV Breakers including CTs and allied maintenance work
1
-
-
Cleaning of 110 KV LAS
1
-
-
Cleaning of 110 KV AB Switch and applying Petroleum jelly
1
-
-
Cleaning of 110 KV Power transformer insulators and other maintenance work
1
-
-
Cleaning of 110 KV Bus Insulators
1
-
-
Cleaning of 33/ 11 KV Breakers including CTs and allied maintenance work
1
-
-
Cleaning of 33 KV /11 KV LAS
1
-
-
Cleaning of 33/11 KV AB Switch including tightening of Bolt & Nutt and applying Petroleum jelly
1
-
-
Cleaning of 33/11 KV KV Power transformer insulators and other maintenance work
1
-
-
Cleaning of 33/11 KV Bus Insulators
1
-
-
Aluminium painting in substation
1
-
-
33KV structure
1
-
-
11KV structure
1
-
-
Power transformer
1
-
-
Breaker
1
-
-
ERECTION OF SINGLE POLE DT STRUCTURE
-
-
-
Loading and unloading of RCC 9 / 9.14 mtr Square Pole
1
-
-
Excavation of pole pit for 3' x 3' x 6' size
1
-
-
Erection of RCC 9 / 9.14 mtr Square Pole including base plate erection.
1
-
-
Loading , unloading and erection of HVDS DT (16 ,25 & 40 KVA)
1
-
-
Excavation of stay Pit for 2' x 2' x 6' size
1
-
-
Erection of stay set complete including base plate
1
-
-
SINGLE POLE Transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe and pit filled with mixture of salt, coal and earth refiling etc., complete including cost of coal and salt ,Fixing of earth connections with GI wire , bolt and Nuts.
1
-
-
Erection of Transformer Structure materials
1
-
-
Erection of HG fuse set
1
-
-
Erection of 11 KV AB switch complete set
1
-
-
Provision of Mass concreting of pole with cement , sand and jelly
1
-
-
Erection of H.T. LAS
1
-
-
Erection of L.T. LAS
1
-
-
Erection of H.T. jumpering in DT structure complete
1
-
-
Erection of L.T. Open type fuse unit including cable jumpering complete set.
1
-
-
Erection of AB switch alone for DP Switch
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements