Tamil Nadu Generation And Distribution Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender

Consultancy Services
Eprocure
Opening Date25 May 2020
Closing Date24 Sep 2020
Tender Amount₹ 13,78,78,473 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply, installation, operation, testing, commissioning and acceptance including warranty for one year period and comprehensive AMC for operation and maintenance services for 5 years concurrently for Automatic Rain Gauge of Sensor type: Tipping bucket with siphon, Range: 0 to 500 mm/hr, Sensing: Magnet and reed switch (on-off output), Resolution: 0.2 mm, Accuracy: 2% of intensity (up to 10 cm/h), Material: UV resistant plastic or corrosion-resistant metal (aluminium, stainless steel), shock and vibration resistant, Rim diameter: Receiver/collecting funnel diameter: 200±0.3 mm diameter with machined aluminium 200 mm rim or equivalent, Output interface: SDI-12 / RS 485 / compatible with data logger, Power supply 12 V DC or switch rated for 12 V DC, Enclosure: Lockable (key) box provided by the supplier to be mounted in Stilling well or Gauge hut, with IP65 or NEMA 4 protection, Graduated tape should be of high quality to withstand a harsh and humid environment, should not get twisted or wrinkled during operation, Sensor Mounting support, cables (power and signal), and other accessories as required, complete tool kit for installation and routine maintenance giving full details etc, civil works required for the installation, protection arrangements, provision of remote monitoring facility by transferring the datas, provision of full documentation and maintenance manual in English etc to the satisfaction of the Engineer at site as per CWC specifications including the cost of materials, , transportation, insurance charges, supporting arrangements, protection arrangements, charges for the specialists, labour , lead, lift etc complete

7

-

-

... More
Supply, installation, operation, testing, commissioning and acceptance including warranty for one year period and comprehensive AMC for operation and maintenance services for 5 years concurrently for Bi reflex Survey targets with convergence bolt made of 12 mm x 170 mm galvanized steel rebar with SS threaded stud shall be securely attached to the exposed rock or shotcrete surface, provided with a plastic cap with a breaking point serving as an adapter for the mounting of a reflector with a marked centre point, designed for high precision measurements with two axes of rotation and to be observable from both sides, accuracy must be better than ± 0.1 mm to achieve an overall accuracy of ± 1 mm within the measuring section, replaceable without loss of precision of reputed make with ISI standard, necessary supporting arrangements, civil works required for the Installation etc to the satisfaction of the Engineer at site as per CWC specifications including the cost of materials, ,transportation, insurance charges, charges for the specialists, labour , lead, lift etc complete.

31

-

-

... More
Supply, installation, operation, testing, commissioning and acceptance including warranty for one year period and comprehensive AMC for operation and maintenance services for 5 years concurrently for GSM/GPRS DATA MODEM to transmit data from Data logger to Data Centre / Local PC using SIM card in places where SIM card Network coverage is possible. Providing of SIM card, selection of Network operator will be decided by TANGEDCO

17

-

-

... More
Supply, installation, operation, testing, commissioning and acceptance including warranty for one year period and comprehensive AMC for operation and maintenance services for 5 years concurrently for Permanent bench mark made up of stainless steel or Aluminium of reputed make with ISI standard, necessary supporting arrangements, charges for surveying the levels, civil works required for the installation etc to the satisfaction of the Engineer as per CWC specifications at site including the cost of materials, transportation, insurance charges, charges for the specialists, labour , lead, lift etc complete.

11

-

-

... More
Supply, installation, operation, testing, commissioning and acceptance including warranty for one year period and comprehensive AMC for operation and maintenance services for 5 years concurrently for V-SAT equipment for Seismic equipments at Dam site where ever the Mobile network coverage is not available with 8Nos 12V-100AH battery, 4No 150W Solar panel, 2Nos 20A solar charge controller, 2Nos power supply / battery charger, earthing, conduit, GPS extender, converter where ever necessary as per the satisfaction of site Engineer as per CWC specifications, including Bandwidth charges upto 20Kbps for 5 years, site preparation, consumables, labour charges, cost of materials, , transportation, insurance charges, charges for the specialists, labour, lead, lift etc complete. Iron mesh caging is to be provided for VSAT antenna and solar module or wherever required to avoid monkey menace at the remote dam sites.

6

-

-

... More
Supply, installation, operation, testing, commissioning and acceptance including warranty for one year period and comprehensive AMC for operation and maintenance services for 5 years concurrently for Pore water pressure sensor using Sensor Type: Vibrating wire piezometer in stainless steel housing with stainless steel filter stone, thermistor, unvented, Range :10 kg/cm2, Resolution: 0.025 % FSR (min) or better, Accuracy: ± 0.1 % FS or better, Over Range: 200% FSR, Operating Temp: -20 deg C to + 60 deg C, Compensated: From 0 to + 60 °C, Temperature compensation: Inbuilt, Output interface: SDI-12 / RS 485 / 4-20 mA /compatible with data logger, Power supply: 10-15 V DC, Linearity: 0.5% F.S, operating humidity: 5 to 100%, Altitude: 0 to 2500 metres, Material: Stainless Steel, Protection: IP 68 or NEMA-4 Standards etc. of reputed make with ISI standard, drilling the borehole to the adequate depth, civil works required for the installation, cost of 50 mm dia PVC pipe of 10 kg/sqcm of finolex or equivalent make, provision of remote monitoring facility by transferring the datas, provision of full documentation and maintenance manual in English etc to the satisfaction of the Engineer at site as per CWC specifications including the cost of materials, , transportation, insurance charges, supporting arrangements, protection arrangements, charges for the specialists, labour, lead, lift etc complete.

4

-

-

... More
Supply, installation, operation, testing, commissioning and acceptance including warranty for one year period and comprehensive AMC for operation and maintenance services for 5 years concurrently for Temperature sensor to monitor the temperature in dam of sensor type : Resistance type , Range :- 20° to + 60 deg C, Over range 0 to +80 °C, Over range effect ±0.1% F.S. up to 150%, Coil resistance 140 to 160 Ohm @ 25°C, Surge arrestor: Citel 90 V gas discharge tube, Accuracy: 1% or better, Resolution: 0.05 deg C or better, Operating Temp: -20 deg C to + 60 deg C, operating humidity: 5 to 100%, Altitude: 0 to 3500 metres, Dimensions Approximately 20 mm diameter x 120 mm length, Linearity 0.5% F.S, Material: Stainless Steel, protection: IP - 68 or NEMA - 4 Standards etc. of reputed make with ISI standard with installation tools and misc accessories, civil works required for the installation, provision of remote monitoring facility by transferring the datas, provision of full documentation and maintenance manual in English etc to the satisfaction of the Engineer at site as per CWC specifications including the cost of materials, , transportation, insurance charges, supporting arrangements, protection arrangements, charges for the specialists, labour, lead, lift etc complete.

32

-

-

... More
Supply, installation, operation, testing, commissioning and acceptance including warranty for one year period and comprehensive AMC for operation and maintenance services for 5 years concurrently for Vibrating Wire Joint Meter of sensor type : Vibrating Wire with built-in thermistor, Range :100 mm (Uni- Axial), Over Range: 1.25 x range, Resolution: 0.025% FSR or better, Accuracy: ±0.2 % FSR or better, Linearity 0.5% F.S, Operating Temp: -20 deg C to + 60 deg C, operating humidity: 5 to 100%, Altitude: 0 to 2500 metres, Thermistor : NTC, YSI or Equivalent, Material: Stainless Steel, protection: IP - 68 or NEMA - 4 Standards etc. of reputed make with ISI standard, pair of mount anchor to hold the sensor in place by drilling the anchor in the structure and fastening the sensor to the mount assembly, installation tools and misc accessories, civil works required for the installation, provision of remote monitoring facility by transferring the datas,provision of full documentation and maintenance manual in English etc to the satisfaction of the Engineer at site as per CWC specifications including the cost of materials, transportation, insurance charges, supporting arrangements, protection arrangements, charges for the specialists, labour , lead, lift etc complete.

12

-

-

... More
Supply, installation, operation, testing, commissioning and acceptance including warranty for one year period and comprehensive AMC for operation and maintenance services for 5 years concurrently for Uplift Pressure sensor with Bourden Gauge using sensor type : Vibrating Wire Piezometer with built-in thermistor & mechanical bourden guage, Range :0 - 10 kg/cm2, Over Range: 1.50 x Range, Over range effect: ± 0.1% F S, Resolution: 0.025 % FSR (min) or better, Accuracy: ± 0.1 % FS or better, Temperature compensation: Inbuilt, Operating Temp: -20 deg C to + 60 deg C, operating humidity: 5 to 100%, Altitude: 0 to 2500 metres, Material: Stainless Steel, Thermistor: YSI or Equivalent (3kΩ @ 25 C), protection: IP - 68 or NEMA - 4 Standards and mechanical bourden gauge of Range: 10 kg/cm2, Type: Bourden Pressure gauge etc. of reputed make with ISI standard, Uplift Pressure Meter Head Assembly, G.I Pipe, G.I Coupling and drilling the borehole to the adequate size and depth, civil works required for the installation, provision of remote monitoring facility by transferring the datas, provision of full documentation and maintenance manual in English etc to the satisfaction of the Engineer at site as per CWC specifications including the cost of materials, , transportation, insurance charges, supporting arrangements, protection arrangements, charges for the specialists, labour , lead, lift etc complete.

26

-

-

... More
Supply, installation, operation, testing, commissioning and acceptance including warranty for one year period and comprehensive AMC for operation and maintenance services for 5 years concurrently for Tilt Meter of sensor type : Vibrating wire / MEMS biaxial, Range :± 15 degrees, Accuracy: ±0.1% F. S or better, Resolution ± 0.05 mm/m (8 arc seconds), Operating Temp: -20 deg C to + 60 deg C, operating humidity: 5 to 100%, Altitude: 0 to 2500 metres, Size (l x b x h) 162 x 90 x 145 mm (App.), Tilt plate size 142 x 24 mm high (App.) aluminium alloy , Sensor Output: 4-20 mA or digital, ±5V, Over range Effect: ± 0.1 % FS upto 150 %, Material: Stainless Steel, protection: IP 68 or NEMA-4 Standards, Required Lightning protection etc. of reputed make with ISI standard, mounting Plate with accessories, installation tools and misc accessories, civil works required for the installation, provision of remote monitoring facility by transferring the datas, provision of full documentation and maintenance manual in English etc to the satisfaction of the Engineer at site as per CWC specifications including the cost of materials, transportation, insurance charges, supporting arrangements, protection arrangements, charges for the specialists, labour , lead, lift etc complete.

20

-

-

... More
Supply, installation, operation, testing, commissioning and acceptance including warranty for one year period and comprehensive AMC for operation and maintenance services for 5 years concurrently for Inclinometer of sensor type : Vibrating Wire with built-in thermistor, Range : ± 15 degrees, Probe: Bi – Axial (length 500 mm), Resolution: 0.01 mm or better, Accuracy: ± 0.02 % FSR or better, Operating Temp: -20 deg C to + 60 deg C, operating humidity: 5 to 100%, Altitude: 0 to 2500 metres, Material: Stainless Steel, Thermistor: YSI or Equivalent (3kΩ @ 25 C), protection: IP - 68 or NEMA - 4 Standards, lightning protection etc. of reputed make with ISI standard, inclinometer casing tube to house the sensor made of PVC with special grooves inside,guide wheel to hold the sensor in-place inside the casing pipe, top connection tube made of Stainless steel to interconnect the sensor, joint clamp to hold the joints and interconnections, wheel union for bi-axial sensors, top cover to seal the borehole etc and drilling the borehole to the adequate depth, civil works required for the installation, provision of remote monitoring facility by transferring the datas, provision of full documentation and maintenance manual in English etc to the satisfaction of the Engineer at site as per CWC specifications including the cost of materials, , transportation, insurance charges, supporting arrangements, protection arrangements, charges for the specialists, labour , lead, lift etc complete.

4

-

-

... More
Supply, installation, operation, testing, commissioning and acceptance including warranty for one year period and comprehensive AMC for operation and maintenance services for 5 years concurrently for Automatic V-Notch to measure the seepage water in the drainage gallery using sensor type : Vibrating wire type, Flow range: Upto 100 litre / sec, Over Range: 150% FSR, Sensitivity 0.01 litre with read-out unit, Resolution: 0.03 % FSR (min) or better, Accuracy: ± 1 % FS or better, Operating Temp: -20 deg C to + 60 deg C, Output Range: 4-20 mA, Material: Stainless Steel, V- Notch type: 90° V-notch weir, etc. of reputed make with ISI standard, civil works required for the installation, provision of remote monitoring facility by transferring the datas, provision of full documentation and maintenance manual in English and annual maintenance charges for a period of five years etc to the satisfaction of the Engineer at site as per CWC specifications including the cost of materials, transportation, insurance charges, supporting arrangements, protection arrangements, charges for the specialists, labour , lead, lift etc complete.

11

-

-

... More
Supply, installation, operation, testing, commissioning and acceptance including warranty for one year period and comprehensive AMC for operation and maintenance services for 5 years concurrently for Vibration sensor to monitor and record the vibrations transferred to the dam wall during water pumping using Sensor Type: Tri- Axial, Sensor Range: ± 2g, Accuracy: ±0.1% FSR protection: IP - 68 Standards etc. of reputed make with ISI/IEC standard with installation tools and misc accessories, civil works required for the installation, provision of remote monitoring facility by transferring the datas, provision of full documentation and maintenance manual in English etc to the satisfaction of the Engineer at site as per CWC specifications including the cost of materials, transportation, insurance charges, supporting arrangements, protection arrangements, charges for the specialists, labour, lead, lift etc complete.

4

-

-

... More
Supply, installation, operation, testing, commissioning and acceptance including warranty for one year period and comprehensive AMC for operation and maintenance services for 5 years concurrently for Broadband Seismometer with 4Nos 12V-100AH battery, 1No 100W Solar panel, 1No 20A solar charge controller, 2No power supply / battery charger, 1No Advance Lightning Protection system (Lightning arrestor), earthing, conduit, GPS extender, converter where ever necessary and Data Acquisition System for Seismograph as per the satisfaction of site Engineer and specalist as per CWC specifications, Pre-dispatch Inspection, field expenses, site preparation, Protection arrangements with adequate size weather protection IP67 metal boxes, supporting arrangements, consumables, transportation, cost of materials, Custom duty,freight charges, insurance charges, charges for the specialists, cost of man power, contingencies, storage equipments, labour , lead, lift etc complete.

2

-

-

... More
Supply, installation, operation, testing, commissioning and acceptance including warranty for one year period and comprehensive AMC for operation and maintenance services for 5 years concurrently for Strong Motion Accelerograph in the Dam structures with 4Nos 12V-100AH battery, 1No 100W Solar panel, 1No 20A solar charge controller, 2No power supply / battery charger, earthing, conduit, GPS extender, converter whereever necessary as per the satisfaction of site Engineer and specalist as per CWC specifications including Pre-dispatch Inspection, field expenses, site preparation, Protection arrangements with adequate size IP67 metal boxes, supporting arrangements, consumables, transportation, cost of materials, Custom duty, freight charges, insurance charges, charges for the specialists, cost of man power, contingencies, storage equipments, labour, lead, lift etc complete.

18

-

-

... More
Supply, installation, operation, testing, commissioning and acceptance including warranty for one year period and comprehensive AMC for operation & maintenance services for 5 years concurrently for Surveillance Equipments (CCTV) for 24 hours monitoring the dam site from the dam control room for protection of the dam equipments and dam area by providing 19" LED monitor, 4 nos 40 mtrs range, 360° outdoor type IR camera, 500 GB hard disc drive, power supply unit, cables required for the connection of the camera and accessories of any reputed make with ISI/IEEE standard, laying the camera cable in open/concealed wiring by inserting in 20 mm dia UPVC pipe of finolex or equivalent make to the satisfaction of the Engineer at site including cost of materials with all accessories, labour , lead, lift etc., complete.

11

-

-

... More
Supply, installation, operation, testing, commissioning and acceptance including warranty for one year period and comprehensive AMC for operation and maintenance services for 5 years concurrently for Laptop computer system for downloading the data from the data logger including provision of new Laptop computer of Lenovo/HP/DELL or any reputed make, Model No: Ideapad 500S-14ISK or equivalent, Processor: Intel Core i5 Processor, Operating System: Windows 7 or Higher Version, Display Type: 14.0" or higher size FHD LED Antiglare Backlight 920x1080, Hard Drive: 1 TB, Memory: 4.0GB DDR3L or higher size 1600MHz, Optical Drive: DVD Recordable, Graphics: 2 GB DDR3, Add-On Software: Microsoft Office 2016 for 1 User etc, as per ISI/IEC standard to the satisfaction of the Engineer at site including cost of materials, labour , lead, lift etc complete

5

-

-

... More
Supply, installation, operation, testing, commissioning and acceptance including warranty for one year period and comprehensive AMC for operation and maintenance services for 5 years concurrently for Solar power supply arrangement for providing power supply to the instrumentation system including provision of new 40 watts capacity solar panel, 2 nos of 180 AH Battery and inverter of reputed make with ISI/IEEE standard, along with all mounting accessories, enclosures for protection from environment and relevant connections between the components, civil works required for the installation etc to the satisfaction of the Engineer at site including the cost of materials, , transportation, insurance charges, supporting arrangements, protection arrangements, charges for the specialists, labour , lead, lift etc complete.

2

-

-

... More
Supply, installation, operation, testing, commissioning and acceptance including warranty for one year period and comprehensive AMC for operation and maintenance services for 5 years concurrently for Inverter power supply arrangement for providing power supply to the instrumentation system including provision of new inverter of 5.2 KVA capacity, 1 no of 180 AH tubular inverter battery etc. of reputed make with ISI/IEC standard, along with all mounting accessories and cables, enclosures for protection from environment and relevant connections between the components, civil works required for the installation etc to the satisfaction of the Engineer at site including the cost of materials, transportation, insurance charges, supporting arrangements, protection arrangements, charges for the specialists, labour , lead, lift etc complete.

16

-

-

... More
Supply, installation, operation, testing, commissioning, including warranty for one year period and acceptance of new 4 core, 1.5 sqmm, PVC insulated, shielded copper cable of reputed make with ISI standard , laying the cable on the GI cable tray / UPVC pipe of suitable size , provision of cable gland and end termination and laying the cable in open / consealed wiring for connecting the various sensors at dam top and drainage gallery area with data logger to the satisfaction of the engineer at site including cost of materials, labour lead, lift etc complete

32500

-

-

... More
Supply, installation, operation, testing, commissioning and acceptance including warranty for one year period of Laying, testing and commissioning of new 4 core x 6 sq.mm, 1100 V, PVC insulated, armoured, multi stranded, LTUG copper cable of reputed make with ISI standard , 8 SWG GI earth wire, 40 mm UPVC pipe of finolex or equivalent make with ISI standard and laying the cable in open / concealed wiring as required at dam top to the satisfaction of the Engineer at site including cost of materials, labour , lead, lift etc complete.

1700

-

-

... More
Supply, installation, operation, testing, commissioning and acceptance including warranty for one year period and comprehensive AMC for operation and maintenance services for 5 years concurrently for DATA COLLECTION UNIT with 32 channels or above including Data Logger with Programming module, Real time controller and Programming software: The system shall automatically collect the observations from attached sensors, process the same and store them into its memory as per the pre-programmed procedure at every full hour UTC and data shall be transmitted to the INSAT-DRT in TDMA mode, continuously monitoring the status of the instruments, power supply and communications, the analog/digital/SDI channels in the data logger must be compatible to the sensors, shall have adequate number of I/O channels and SDI port for sensor integration, output interface shall be SDI 12/RS-485/4-20 mA, have provision to change the Unique station identification, Time of observation, Sensor identification, the system shall have an integrated microprocessor based data acquisition and storage system having adequate hardware configuration and software support to serve as an interface between sensors, Providing electrical power to the sensors and conversion of electrical output signals from this sensors into engineering values on calibration equations stored in the memory, full compatibility with all types of sensors, memory capacity to retain at least 180 days data, RAM Backup battery life for one year, stored data shall be retrievable vis serial port to a PC/laptop/ PCMCIA card/USB or any other compact and commercially available solid state memory device, management of data transmission to DCU earth station through satellite which shall include formatting of transmitted data with necessary preambles, station ID codes, parity checks etc, as per transmission methodology for transmission through satellite channel scheduling and operating the DCU transmitter automatically, The system shall support the 1) Easy programming setup, 2) Multi-tasking capability, 3) User friendly software programming, 4) self – diagnostic facility and be capable of displaying Station ID/Sensor ID codes and messages, 5) Setup shall be organised in a tree of menus and sub-menus, 6) the DCP shall support the manual entry of data through keypad and its display, 7) Data including the setup and program files shall be transferable from the system vis a serial port to PC and SD card or other suitable memory device and vice versa.The DCU shall be housed in a weather proof and temper proof housing of NEMA 4 or IP 65 type enclosure of CRCA steel of 16 gauge steel body and 14 gauge door external mounting feet, seams continuously welded, rolled lip around door to exclude liquids, oil resistant gasket, Hasp and staple for padlocking, grey polyester powder coating inside and outside. In material, resist corrosion, seamless foam-in-place gasket, detachable mounting feet, moulded drip seals, type 216 stainless steel quarter turn latch etc, Electronics unit should have EMI protection and enclosed in IP 65 enclosure, the surge suppression device shall be provided for all interfaces to protect the data logger from surges emanating from the sensors, the DCU shall have a Wi-Fi connectivity for remote access for configuration and setup of DCU using smart phone or a laptop etc. with ISI/IEC standard etc with weather proof compartment with all protections, necessary supporting arrangements, civil works required for the installation, provision of full documentation and maintenance manual in English etc to the satisfaction of the Engineer at site as per CWC specifications including the cost of materials, , transportation, insurance charges, supporting arrangements, protection arrangements, charges for the specialists,labour , lead, lift etc complete.

5

-

-

... More
Supply, installation, operation, testing, commissioning and acceptance including warranty for one year period and comprehensive AMC for operation and maintenance services for 5 years concurrently for DATA COLLECTION UNIT with 16 channels or above including Data Logger with Programming module, Real time controller and Programming software: The system shall automatically collect the observations from attached sensors, process the same and store them into its memory as per the pre-programmed procedure at every full hour UTC and data shall be transmitted to the INSAT-DRT in TDMA mode, continuously monitoring the status of the instruments, power supply and communications, the analog/digital/SDI channels in the data logger must be compatible to the sensors, shall have adequate number of I/O channels and SDI port for sensor integration, output interface shall be SDI 12/RS-485/4-20 mA, have provision to change the Unique station identification, Time of observation, Sensor identification, the system shall have an integrated microprocessor based data acquisition and storage system having adequate hardware configuration and software support to serve as an interface between sensors, Providing electrical power to the sensors and conversion of electrical output signals from this sensors into engineering values on calibration equations stored in the memory, full compatibility with all types of sensors, memory capacity to retain at least 180 days data, RAM Backup battery life for one year, stored data shall be retrievable vis serial port to a PC/laptop/ PCMCIA card/USB or any other compact and commercially available solid state memory device, management of data transmission to DCU earth station through satellite which shall include formatting of transmitted data with necessary preambles, station ID codes, parity checks etc, as per transmission methodology for transmission through satellite channel scheduling and operating the DCU transmitter automatically, The system shall support the 1) Easy programming setup, 2) Multi-tasking capability, 3) User friendly software programming, 4) self – diagnostic facility and be capable of displaying Station ID/Sensor ID codes and messages, 5) Setup shall be organised in a tree of menus and sub-menus, 6) the DCP shall support the manual entry of data through keypad and its display, 7) Data including the setup and program files shall be transferable from the system vis a serial port to PC and SD card or other suitable memory device and vice versa.The DCU shall be housed in a weather proof and temper proof housing of NEMA 4 or IP 65 type enclosure of CRCA steel of 16 gauge steel body and 14 gauge door external mounting feet, seams continuously welded, rolled lip around door to exclude liquids, oil resistant gasket, Hasp and staple for padlocking, grey polyester powder coating inside and outside. In material, resist corrosion, seamless foam-in-place gasket, detachable mounting feet, moulded drip seals, type 216 stainless steel quarter turn latch etc, Electronics unit should have EMI protection and enclosed in IP 65 enclosure, the surge suppression device shall be provided for all interfaces to protect the data logger from surges emanating from the sensors, the DCU shall have a Wi-Fi connectivity for remote access for configuration and setup of DCU using smart phone or a laptop etc. with ISI/IEC standard etc with weather proof compartment with all protections, necessary supporting arrangements, civil works required for the installation, provision of full documentation and maintenance manual in English etc to the satisfaction of the Engineer at site as per CWC specifications including the cost of materials, , transportation, insurance charges, supporting arrangements, protection arrangements, charges for the specialists, labour , lead, lift etc complete.

6

-

-

... More
Supply, installation, operation, testing, commissioning and acceptance including warranty for one year period and comprehensive AMC for operation and maintenance services for 5 years concurrently for Data Acquisition System at two sites one at CSIR-NGRI, Hyderabad and another at TANGEDCO control centre with 3 Nos Data Acquisition computer, 3 Nos 2KVA online UPS,2 Nos LASER printer, 1 No Ethernet switch, 1No GSM/GPRS MODEM, Earthing, cables, conduit, wherever necessary as per the satisfaction of site engineer as per CSIR-NGRI, Hyderabad requirement including Data Acquisition software, site preparation, consumables, labour charges, transportation, cost of materials, , Custom duty,freight charges, insurance charges, charges for the specialist, labour, lead, lift etc complete.

2

-

-

... More
Supply, installation, operation, testing, commissioning and acceptance of Realtime Monitoring Software for Dam Instruments Implementation of Realtime Monitoring System software other than seismic instruments with the following features 1) Framework (PHP) upgradation 2) Level of access security (As per requirement including Dam & sensor with user permission. 3) Dashboard for Data display for Dam wise and parameter wise 4) Location wise reports 5) Frequent testing of the Real time Monitoring system 6) Project implementation up to 10 days of onsite implementation / Customization including installation of server and to a master user at a single location 7) Project management with a well trained staff 8) Documentation: User manual and Technical Manual 9) Warranty for one year period and comprehensive AMC for operation and maintenance services for 5 years with unlimited offsite support whenever required 10) Hosting services with 1No Rack server with SSD/SATA and Linux OS of latest version to store datas from various dams and supporting accessories 11) Reduncy server for data backup 12) 2 Nos 52" LED Monitor / TV for display including lead, lift, transportation, labour etc., complete to the satisfaction of Engineer at site

1

-

-

... More
Supply, installation, operation, testing, commissioning and acceptance including warranty for one year period and comprehensive AMC for operation and maintenance services for 5 years concurrently for fixed cellular terminal machine, 308 EPABX machine of reputed make with ISI/IEC standard, connection of the both machine using Coaxial cable, provision of 1 no telephone instrument at the dam control room and connection of the telephone instrument using 2 core telephone cable wiring by inserting in the 20 mm dia UPVC pipe of finolex or equivalent make and clamping along the wall up to the control room etc of any reputed make with ISI standard to improve the communication facility to the dam control room to the satisfaction of the Engineer at site including cost of materials, labour, lead, lift etc complete.

2

-

-

... More
Training program for the staff of Purchaser that covers all aspects related to the installation, configuration, operation and maintenance of components. The training will include field training on proper data acquisition methods and classroom training on data management. Training will be conducted at the field and office locations selected by the Purchaser. Appropriate training courses shall be conducted by the experts. Training shall be provided by the bidder in several phases. The bidder is required to have hydro-meteorological, geodetic, geotechnical & Seismic equipment specialists for training classes. The training shall include: (I) User Training Course for field Engineers for maximum of 20 participants in various sessions (II) User Training Course including Operation & Maintenance course for working staff. Course topics will include; sensor calibration, data logger configuration, data downloading, data retrieval, collection, compilation, processing, maintenance requirements, & procedures for equipment configuration, installation, site testing & commissioning for maximum of 20 participants in various sessions. The training course will take place at employer’s requirement.. The Bidder will facilitate the professional and the training material. On-the-job training will be provided by the Bidder in conjunction with the installation of hydro-meteorological, geodetic, geotechnical & Seismic installations and during the course of maintenance as required. These trainings will be repeated every year during warranty & Comprehensive Operation and Maintenance Contract periods for refreshing the trained staff and training additional staff. The Bidder shall be capable of providing additional training on request of the Client as required. The classroom training, hands on experience and troubleshooting will be prepared as video for easy access and will be posted on the web. All training modules will be also provided as a media file (Windows Media Player Compatible) on a USB Drive. Five copies on five separate media shall be required. The supplier should provide training on operation, maintenance and calibration of the seismograph and accelerograph at factory for concern TANGEDCO Engineers and one CSIR-NGRI, Hyderabad officer. Training should employ database management software that is normally used by TANGEDCO personnel. Costs of travel, transportation, boarding, lodging & per diem for training of Purchaser’s staff should be quoted by the bidder etc,.

1

-

-

... More
Labour charges for Technical services personal BE (EEE/ECE) Passed with adequate knowledge in Computer /dam instruments operations for IT Engineer with minimum 3 years of relevant experience responsible for maintenance of rack server, redundancy server for data backup, location wise reports, preparing monthly, quarterly, half-yearly and annual reports, frequent testing and maintenance of real time monitoring system and software during comprehensive operation and maintenance for a period of 5 years in 24 hours as per the contract condition etc,.

5

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.