Tamil Nadu Generation And Distribution Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date15 Nov 2022
Closing Date21 Nov 2022
Tender AmountRefer Documents
Costs
EMD
₹ 3,900Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_EB_264252_1Bid Award Id
ViewTender No
042/2022-23/DT.15.11.2022Tender Authority
Tamil Nadu Generation And Distribution Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Execution of 5Nos AGL service work under Normal and SFS scheme and 2 Nos IIA1 extension work and 1 No LT DCW work in Various distribution Transformer inrespect of west/odugathur section in odugathur sub division
BOQ Items
... More
In rocky area(common to all size of poles) by blasting/Manual
20
-
-
... More
Excavation of Stay pit of 4.5' to 5' depth using JCB/Manual
35
-
-
... More
Erection of Poles and Accessories
-
-
-
... More
Erection of RCC, REC, PSC poles upto 8.00m length by using JCB/Manual
33
-
-
... More
Erection of RCC, REC, PSC poles above 8.00m length by using JCB/Manual
8
-
-
... More
Erection of stay set complete with fixing up stay wire Eye, Bow,Guy Shackle, Binding etc.
35
-
-
... More
Fixing of line materials
-
-
-
... More
Fixing of HT V Cross arms 3 1/2, 4 1/2 & 5 feet, Tapping cross arm & Guarding cross arm
9
-
-
... More
Fixing of LT 3 Phase cross arm
57
-
-
... More
Fixing of HT / LT TI Fitting
17
-
-
... More
Fixing of HT Pin Insulators (11/22/33KV)
48
-
-
... More
Fixing of LT Pin Insulators
81
-
-
... More
Fixing of HT 11KV stain disc
69
-
-
... More
Fixing of Tapping cross arm upto 33KV line including fixing of Discs, insulators and Jumpering etc
20
-
-
... More
Fixing of LT Shackle
142
-
-
... More
Fixing of Aluminium knob
59
-
-
... More
Paving and Stringing of conductor
-
-
-
... More
Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor
8
-
-
... More
Paving and stringing of conductors of sizes above 7/2.59 mm ACSR or other equivalent conductor upto 7/3.35mm ACSR
4.44
-
-
... More
Erection of Distribution Transformers:
-
-
-
... More
Erection of 11KV Single pole structure including erection of DT complete without centre support
3
-
-
... More
Loading/Unloading Charges
-
-
-
... More
Loading of DT upto 100KVA
3
-
-
... More
Unloading of DT upto 100KVA
3
-
-
... More
Loading of various size of REC, RCC,PSC Poles upto 8.0m length from Road side.
33
-
-
... More
Loading of various size of REC, RCC,PSC Poles above 8.0m length from Roadside.
11
-
-
... More
Unloading of various size of REC, RCC,PSC Poles upto 8.0m length to pole pit
33
-
-
... More
Unloading of various size of REC, RCC,PSC Poles above 8.0m length to pole pit
11
-
-
... More
Loading of conductor
3
-
-
... More
Unloading of conductor
3
-
-
... More
Loading / Unloading of Iron & Steel
5
-
-
... More
Loading / Unloading of line material
5
-
-
... More
Guarding arrangement
2
-
-
... More
Transportation charges
-
-
-
... More
Transportation of all types and sizes of poles and other associated material from road side to pole pit and vice versa upto 0.50KM
44
-
-
... More
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) upto 5Km from Vadakathipatty stores to Odugathur
44
-
-
... More
Transporting of Distribution Transformer from stores to office/ site upto 10KM distance by engaging 1 ton capacity Minidor(lorry)
3
-
-
... More
Transporting of Line materials from stores to office/ site upto 10KM distance by engaging 1 ton capacity Minidor(lorry)
5
-
-
... More
Dismantling of Line Materials
-
-
-
... More
Dismantling of RCC, REC, PSC & Metal poles of all sizes including the closing of pit
1
-
-
... More
For breaking the mass concrete of all supports
1
-
-
... More
Dismantling of stay set complete including stay rod
1
-
-
... More
Dismandling of conductor of Upto 7/3.35 including Transporting the conductor to the nearest road side and stocking in coils
1.05
-
-
... More
Dismantling of Cross arm clamps, TI fittings hardwares, insulators etc.
12
-
-
... More
WORKSHOP CHARGES :-
-
-
-
... More
Manufacturing/ Altering of clamps
50
-
-
... More
Drilling of holes in the structure materials clamps etc.
30
-
-
... More
AB switch or open type side arm stud, cutting and drilling holes.
6
-
-
... More
Manufacturing of earth pipe clamps for structure including of drilling holes and welding and clamp with earth pipe
6
-
-
... More
GENERAL
-
-
-
... More
Clearing of Tree brances of coconut tree
50
-
-
... More
Clearing of Tree brances of Neem, Tamerined, country etc
50
-
-
... More
Cleaaring of Branches/ Trees with JCB
10
-
-
... More
Satutory Compliance Expense @1.5 % should be Entered by the Bidder
1
-
-
... More
E.P.F. @12 % should be Entered by the Bidder
1
-
-
... More
E.S.I. @3.25 % should be Entered by the Bidder
1
-
-
... More
G.S.T. @18% should be Entered by the Bidder
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements