Tamil Nadu Generation And Distribution Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender

Works
Eprocure
Opening Date3 Dec 2024
Closing Date17 Dec 2024
Tender Amount₹ 10,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
works for effecting services in various schemes in Kunjandiyur Section in Mettur division
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation of Stay pit 4.5' to 5' depth by using JCB or manual

55

-

-

... More
Hard rock requires blasting

10

-

-

... More
Hard rock without blasting (where houses are located)

10

-

-

... More
Erection of stay set complete

55

-

-

... More
Erection of PSC/ RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual

60

-

-

... More
Erection of PSC/ RCC poles/Metal poles above 8.00m by using JCB or maual

40

-

-

... More
Fixing of HT/LT TI Fittings

25

-

-

... More
Fixing of HT "V" cross arms (all types) / Channel cross arms/ Guarding

65

-

-

... More
Fixing of HT Pin Insulators - 22 KV

25

-

-

... More
Fixing of HT 11 KV Strain disc

25

-

-

... More
Fixing of LT Single phase cross arms

100

-

-

... More
Fixing of LT 3 phase cross arms

250

-

-

... More
Fixing of LT Pin insulators

300

-

-

... More
Fixing of LT Shackle

125

-

-

... More
Fixing of Knob

25

-

-

... More
Concreting of poles: Mass concreting including materials (Cement + River sand/ M sand and Blue metals and watering)

6

-

-

... More
Sleeve concreting including materials (Cement + River Sand/ M sand and Blue metals and watering)

5

-

-

... More
Stay Concreting including cost of materials and labour 375mmx375mmx50mm

4

-

-

... More
Paving , Stringing, Binding & Jumpering of ACSR 7/3.35 & AAAC 7/3.15 mm

30

-

-

... More
Paving , Stringing, Binding & Jumpering of ACSR 7/2.59 mm & ACSR 7/2.11 mm AAC 7/2.50

41

-

-

... More
Transport of poles/Materials/ Conductors (Excluding loading & Unloading charges) Below 8 Kms

50

-

-

... More
Loading of line materials

50

-

-

... More
Unloading of line materials

50

-

-

... More
Loading of poles upto 8.0 M/ 27'

60

-

-

... More
Unloading of PSC pole 24' & 27'

60

-

-

... More
Loading of PSC pole 9.0 mtr pole (300Kg)

40

-

-

... More
Unloading of PSC pole 9.0 mtr pole (300Kg)

40

-

-

... More
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual up to 100 m

60

-

-

... More
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual beyond 100 m

40

-

-

... More
Above 8 Kms. For additional Km (Irrespective of weight in

10

-

-

... More
Labour charges for alteration of Back clamp

25

-

-

... More
Labour charges for alteration of Stay clamp

30

-

-

... More
Tree cutting works Cutting of coconut leaves (per tree)

40

-

-

... More
Clearing of branches of trees

40

-

-

... More
Loading or unloading of Transformer above 100 and upto 200 KVA

10

-

-

... More
Drilling of hole in channel only 3/4" & 1"

25

-

-

... More
Cutting of channel and flat

10

-

-

... More
Erection of New Transformer all capacities (with jumpering)

10

-

-

... More
Erection of Single Pole Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pit with collar including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure including concreting (Except erection of Transformer)

10

-

-

... More
Earthing of pole with coil earthing including burying looping and binding.

15

-

-

... More
Dismantling of Pole 8.0 Mtr

12

-

-

... More
Releasing of grill

10

-

-

... More
Releasing of 3 phase service and (upto 50 HP) re-fixing.

25

-

-

... More
Releasing of single phase service and re-fixing.

14

-

-

... More
Dismantling of HT V Cross arms(all type)

20

-

-

... More
Dismantling of HT 22 KV Pin Insularors

30

-

-

... More
Dismantling of HT/LT TI Fittings

21

-

-

... More
Dismantling of HT 22KV Strain Disc

15

-

-

... More
Dismantling of LT 1 PH X arm

25

-

-

... More
Dismantling of LT 3 PH X arm

31

-

-

... More
Dismantling of LT Shackle

44

-

-

... More
Dismantling of LT Pin insulators

43

-

-

... More
Dismantling of Alu Knob

21

-

-

... More
Dismantling of Stay set complete

12

-

-

... More
Dismandling of ACSR 7/3.35mm conductor

3

-

-

... More
Dismantling of ACSR 7/2.59mm/ 7/2.11mm conductor

3

-

-

... More
G.S.T. @18% should be Entered by the Bidder

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.