Tamil Nadu Generation And Distribution Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender

Machinery and Tools
Eprocure
Opening Date24 Apr 2023
Closing Date8 May 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
MTPS I TM Unit III Overhauling of TLOCBPs H2CBPs Hydrazine Dozing Pumps Phosphate Dozing Pumps during Annual Overhaul of 2023 24
MTPS I TM Unit III Overhauling of TLOCBPs H2CBPs Hydrazine Dozing Pumps Phosphate Dozing Pumps during Annual Overhaul of 2023 24
MTPS I TM Unit III Overhauling of TLOCBPs H2CBPs Hydrazine Dozing Pumps Phosphate Dozing Pumps during Annual Overhaul of 2023 24
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Checking and correcting the pump alignment with motor and rechecking of pump alignment after connecting the suction & discharge flanges with renewed gaskets. Inspection of couplings, coupling pads and replacing if necessary, Coupling the pump with motor, connecting the pump from suction and discharge pipe flanges, and other such works required for efficient operation of the pump and commissioning. Cleaning & painting the complete pump assembly & Base structure, Painting inside the pump casings and suction strainer well inside area, also the connected pipelines and painting of the pump base concrete structure with Oil Distemper.

2

-

-

... More
Overhauling of Hydrogen Cooler Booster Pump Decoupling the pump, disconnection of the pump from suction and discharge pipe flanges, draining the lub oil from the sump, Dismantling of Suction strainer top cover and the strainer.

2

-

-

... More
Dismantling of the Bearing Covers, Bearing Bracket, Bearing Bracket Lantern, splash ring, Dismantling of mechanical Seal, shaft sleeve and dismantling of the casing cover from the volute casing etc.,

2

-

-

... More
Dismantling the impeller Assembly from the Volute Casing, Inspection and reconditioning the eroded portions of the casings if required, Inspection, Checking measurements and tolerances of the impeller, shaft, impeller wearing ring, casing ring and neck ring and replace all the above if necessary including machining of the wearing rings to the required size and assembling with the impeller suitably

2

-

-

... More
Reassembling and positioning of the rotor assembly and closing of casing cover, reassembling the mechanical seals after inspection and replacement of the spares & sleeves, Assembling the splash ring, Bearing Bracket Lantern, Bearing Bracket, Bearings, Bearing Covers and assembling the half coupling in shaft

2

-

-

... More
Checking and correcting the pump alignment with motor and connecting of pump flanges with renewed gaskets. Inspection of couplings, coupling pads and replacing if necessary, coupling the pump with motor, connecting the pump from suction and discharge pipe flanges, and other such works required for efficient operation of the pump and commissioning. Cleaning & painting the complete pump assembly & Base structure, Painting inside the pump casings and suction strainer well inside area, also the connected pipelines and painting of the pump base concrete structure with Oil Distemper .(Paint under Contractor Scope)

2

-

-

... More
Overhauling of Hydrazine Dozing Pump Decoupling the motor and the liquid well assembly, Draining the oil from the pump, dismantling the speed reduction assembly, dismantling the plunger and the pump bodies and connected flanges.

2

-

-

... More
Dismantling the crosshead piston and connecting rod, removing the well crank plate, removal of sleeve for cross head, removal of the bearings properly, dismantling of worm and worm wheel assemblies, cleaning and inspection of all the above parts for wear and replacement if necessary. Reassembling all the above after overhauling as per the procedure

2

-

-

... More
Dismantling of the pump, plunger assembly, valve and valve seats, inspection and replacing the worn-out parts if necessary and reassembling the pump

2

-

-

... More
Inspection of couplings, coupling pads and replacing if necessary, Coupling the motor and the liquid well assembly, Filling of oil in the sump, Assembling the speed reduction assembly, connecting the plunger and the pump bodies and connected flanges, checking of alignment with the motor and successful commissioning of the pump. Cleaning & painting the complete pump assembly & Base structure, painting the connected pipelines and painting of the pump base concrete structure with Oil Distemper(Paint under Contractor Scope)

2

-

-

... More
Decoupling the motor and the liquid well assembly, Draining the oil from the pump, dismantling the speed reduction assembly, dismantling the plunger and the pump bodies and connected flanges.

2

-

-

... More
Dismantling the crosshead piston and connecting rod, removing the well crank plate, removal of sleeve for cross head, removal of the bearings properly, dismantling of worm and worm wheel assemblies, cleaning and inspection of all the above parts for wear and replacement if necessary. Reassembling all the above after overhauling as per the procedure

2

-

-

... More
Dismantling of the pump, plunger assembly, valve and valve seats, inspection and replacing the worn-out parts if necessary and reassembling the pump

2

-

-

... More
Inspection of couplings, coupling pads and replacing if necessary, Coupling the motor and the liquid well assembly, Filling of oil in the sump, Assembling the speed reduction assembly, connecting the plunger and the pump bodies and connected flanges, checking of alignment with the motor and successful commissioning of the pump. Cleaning & painting the complete pump assembly & Base structure, painting the connected pipelines and painting of the pump base concrete structure with Oil Distemper . (Paint under Contractor Scope)

2

-

-

... More
Enamel paint

6

-

-

... More
Charges for Consumables and T&P’s item Sl.No:1 to 17

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.