Tamil Nadu Generation And Distribution Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date25 Feb 2022
Closing Date10 Mar 2022
Tender Amount₹ 10,00,000
Costs
EMD
₹ 10,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Works Contract For Town Rasipurame Sub Division
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_EB_223112_1Bid Award Id
ViewTender No
SPECNO 044/2021-22DT24.02.2022Tender Authority
Tamil Nadu Generation And Distribution Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Excavation of Pole pit upto 30" (9.14M) Poles
45
-
-
Excavation of Pole pit above30" (9.14M) Poles
10
-
-
Hard rock without blasting (Where houses are located)
15
-
-
Medium rock and dense medium rock requires blasting
30
-
-
Erection of RCC /PSC Poles/Metal poles upto 8.0M (27')
110
-
-
Erection of RCC /PSC Poles/Metal poles upto 9.14M (30')
40
-
-
Erection of RSJ,Rail,Fabricated poles above 30'-0 (9.14M)'
14
-
-
Erection of RSJ,Rail,Fabricated poles above 36'-0'
6
-
-
Fixing of 4 1/2" HT 'V' X arms/Channel X arms/Guarding X arms
40
-
-
Fixing of LT 3 Ф X arm
125
-
-
Fixing of LT 1 Ф X arms
90
-
-
Fixing of HT/LT TI Fittings
70
-
-
Fixing of 22KV Pin Insulator with Pin
150
-
-
Fixing of HT 11 KV Strain disc with metal parts
100
-
-
Fixing of LT Pin insulators
300
-
-
Fixing of LT Shackle with strapset
120
-
-
Fixing of Aluminium knob
70
-
-
Earthing of pole including looping, binding, coiling and burying
40
-
-
Earthing of Addl. X arms
20
-
-
Paving of Conductor of ACSR 7/3.35 & AAAC 7/3.15 mm
300
-
-
Paving of Conductor of ACSR 7/2.59 mm /AAAC 7/2.50 mm & ACSR 7/2.11mm
300
-
-
Painting of Metal poles including cross arms (Single coating)
20
-
-
Colouring of poles
50
-
-
Mass concreting (Concreting of poles with size 2'x2'x6' including cost of jelly, Sand and Cement (With supply) with a mixture of 1:3:6 along Sleeve concreting and plastering of concrete with ratio 1:2 )
10
-
-
b. Sleeve concreting including materials (Cement 1/2 bag + sand and Blue metals and watering)
5
-
-
Base Concreting (1.5' X 1.5' x 1/4' including cost of jelly, Sand and Cement (With supply) )
10
-
-
Stay Concreting (Concreting of stay with size 1.5'x1.5'x 3' including cost of jelly, Sand and Cement (With supply) with a mixture of 1:3:6 along sleeve concreting and plastering of concrete portion above the ground level with ratio 1:2 )
20
-
-
Flat Guarding (with 2 M interval of lays)
10
-
-
HT Guarding
10
-
-
Transport of poles/Materials/Conductors Below 8 Kms
50
-
-
Transport of poles/Materials/Conductors Above 8 Kms for Addl.Kms
50
-
-
Loading of PSC pole 24' & 27'
50
-
-
Loading of RCC pole up to 8 mtr(27') and metal poles of all sizes
10
-
-
Loading of PSC pole 9.0 mtr pole (300Kg)
20
-
-
Loading of PSC pole 9.0 mtr pole (400Kg)
20
-
-
Loading of RCC 9.14 mtr pole
10
-
-
Un Loading of PSC pole 24' & 27'
60
-
-
Un Loading of RCC pole up to 8 mtr(27') and metal poles of all sizes
30
-
-
Un Loading of PSC pole 9.0 mtr pole (300Kg)
30
-
-
Loading of PSC pole 9.0 mtr pole (400Kg)
20
-
-
Un Loading of RCC above 9 mtr pole
10
-
-
Loading of Cement bag of 50 Kg
5
-
-
Unloading of Cement bag of 50 Kg
5
-
-
Loading of Transformer oil drum with Oil 200 Lit. capacity
10
-
-
Unloading of Transformer oil drum with Oil 200 Lit. capacity
10
-
-
Transporting of poles from road side to pole pit including loading and unloading of poles upto 27'-0'
50
-
-
Transporting of poles from road side to pole pit including loading and unloading of poles 30' and above including R.S.Joists poles
50
-
-
Erection of Transformer Loading and Unloading of Transformer upto 200 KVA for each
10
-
-
Erection of New Transformer upto 200 KVA
10
-
-
Replacement of failed Transformers upto 200 KVA Dismantling & erection
5
-
-
Loading & Erection of HT Metering set
4
-
-
Resagging of conductor (LT)
250
-
-
Resagging (HT) conductor ACSR 7/2.59mm
50
-
-
Resagging (HT) conductor of ACSR 7/3.35 mm
50
-
-
Erection of Street light including fixture fitting
20
-
-
Erection of Street light service
5
-
-
Fixing of new LED lamp fittings
20
-
-
Releasing of grills from RCC poles
10
-
-
Releasing of Single phase service wire and refixing
296
-
-
Releasing of three phase service wire (up to 50 KW) and refixing
50
-
-
Releasing of three phase service (above 50 KW) and refixing
5
-
-
Labour charges fixing of special Type clamps for rail poles, RS Joists,Tubulator pole special clamps for Distribution Transformer Structure
50
-
-
Colour washing/Painting RCC pole
20
-
-
Alteration of Back clamp
100
-
-
Alteration of Stay clamp
20
-
-
Erection of new earth pipe by replacing the corroded earth pipe
10
-
-
Bruning of Coconut tree branches
110
-
-
Drilling of hole in channel only 3/4" & 1" per hole
207
-
-
Cutting of plate
102
-
-
Cutting of chennel
100
-
-
Cutting of Angle
96
-
-
Cutting of pipe
6
-
-
Excavation of structure pole Pits 3'X3'x6' Nos
10
-
-
Transporting of pole to pit location 2 nos.
10
-
-
Erection of poles 2 Nos
10
-
-
Excavation and Erection of stay pit 2 Nos
10
-
-
Mass concreting 2 Nos.
10
-
-
Base concreting 2 Nos
10
-
-
Stay concreting 2 Nos
10
-
-
Top channel 1 set
10
-
-
Bed channel 1 set
10
-
-
Cross with stud for bed channel
10
-
-
Belting angle and H.G.Fuse Angle
10
-
-
Erection of A.B.Switch
10
-
-
Erection of H.G.Fuse set complete
10
-
-
Structure earthing complete the pits and earth- tubes and 3 pipes completed
10
-
-
Bus bar arrangements per structure
15
-
-
Feeding arrangements with open type fuse unit for two feeders
15
-
-
HT/LT LAS fixing and jumpering complete
10
-
-
Fixing of support insulator angle and erection of 3 Nos. Pin insulators
10
-
-
H.T Jumpering complete
10
-
-
Excavation of Structure pole pits - 2 Nos
4
-
-
Erection of poles
4
-
-
Transporting of poles from road side to pit
4
-
-
Erection and erection of stay pits 2 Nos
4
-
-
Erection of Structure materials
4
-
-
Erection of AB switch
4
-
-
Structure earthing in complete
4
-
-
Erection of HT Jumpers
4
-
-
Structure concreting and plastering earth pits
4
-
-
Dismantling of Bus bar arrangements
-
-
-