Tamil Nadu Generation And Distribution Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender

Civil And Construction
Civil Works Others
Eprocure
Opening Date25 Feb 2022
Closing Date10 Mar 2022
Tender Amount₹ 10,00,000 
Notes
Download

Costs

Summary

Works Contract For Town Rasipurame Sub Division

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
WORKS CONTRACT FOR TOWN RASIPURAM SUB DIVISION
WORKS CONTRACT FOR TOWN RASIPURAM SUB DIVISION
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation of Pole pit upto 30" (9.14M) Poles

45

-

-

... More
Excavation of Pole pit above30" (9.14M) Poles

10

-

-

... More
Hard rock without blasting (Where houses are located)

15

-

-

... More
Medium rock and dense medium rock requires blasting

30

-

-

... More
Erection of RCC /PSC Poles/Metal poles upto 8.0M (27')

110

-

-

... More
Erection of RCC /PSC Poles/Metal poles upto 9.14M (30')

40

-

-

... More
Erection of RSJ,Rail,Fabricated poles above 30'-0 (9.14M)'

14

-

-

... More
Erection of RSJ,Rail,Fabricated poles above 36'-0'

6

-

-

... More
Fixing of 4 1/2" HT 'V' X arms/Channel X arms/Guarding X arms

40

-

-

... More
Fixing of LT 3 Ф X arm

125

-

-

... More
Fixing of LT 1 Ф X arms

90

-

-

... More
Fixing of HT/LT TI Fittings

70

-

-

... More
Fixing of 22KV Pin Insulator with Pin

150

-

-

... More
Fixing of HT 11 KV Strain disc with metal parts

100

-

-

... More
Fixing of LT Pin insulators

300

-

-

... More
Fixing of LT Shackle with strapset

120

-

-

... More
Fixing of Aluminium knob

70

-

-

... More
Earthing of pole including looping, binding, coiling and burying

40

-

-

... More
Earthing of Addl. X arms

20

-

-

... More
Paving of Conductor of ACSR 7/3.35 & AAAC 7/3.15 mm

300

-

-

... More
Paving of Conductor of ACSR 7/2.59 mm /AAAC 7/2.50 mm & ACSR 7/2.11mm

300

-

-

... More
Painting of Metal poles including cross arms (Single coating)

20

-

-

... More
Colouring of poles

50

-

-

... More
Mass concreting (Concreting of poles with size 2'x2'x6' including cost of jelly, Sand and Cement (With supply) with a mixture of 1:3:6 along Sleeve concreting and plastering of concrete with ratio 1:2 )

10

-

-

... More
b. Sleeve concreting including materials (Cement 1/2 bag + sand and Blue metals and watering)

5

-

-

... More
Base Concreting (1.5' X 1.5' x 1/4' including cost of jelly, Sand and Cement (With supply) )

10

-

-

... More
Stay Concreting (Concreting of stay with size 1.5'x1.5'x 3' including cost of jelly, Sand and Cement (With supply) with a mixture of 1:3:6 along sleeve concreting and plastering of concrete portion above the ground level with ratio 1:2 )

20

-

-

... More
Flat Guarding (with 2 M interval of lays)

10

-

-

... More
HT Guarding

10

-

-

... More
Transport of poles/Materials/Conductors Below 8 Kms

50

-

-

... More
Transport of poles/Materials/Conductors Above 8 Kms for Addl.Kms

50

-

-

... More
Loading of PSC pole 24' & 27'

50

-

-

... More
Loading of RCC pole up to 8 mtr(27') and metal poles of all sizes

10

-

-

... More
Loading of PSC pole 9.0 mtr pole (300Kg)

20

-

-

... More
Loading of PSC pole 9.0 mtr pole (400Kg)

20

-

-

... More
Loading of RCC 9.14 mtr pole

10

-

-

... More
Un Loading of PSC pole 24' & 27'

60

-

-

... More
Un Loading of RCC pole up to 8 mtr(27') and metal poles of all sizes

30

-

-

... More
Un Loading of PSC pole 9.0 mtr pole (300Kg)

30

-

-

... More
Loading of PSC pole 9.0 mtr pole (400Kg)

20

-

-

... More
Un Loading of RCC above 9 mtr pole

10

-

-

... More
Loading of Cement bag of 50 Kg

5

-

-

... More
Unloading of Cement bag of 50 Kg

5

-

-

... More
Loading of Transformer oil drum with Oil 200 Lit. capacity

10

-

-

... More
Unloading of Transformer oil drum with Oil 200 Lit. capacity

10

-

-

... More
Transporting of poles from road side to pole pit including loading and unloading of poles upto 27'-0'

50

-

-

... More
Transporting of poles from road side to pole pit including loading and unloading of poles 30' and above including R.S.Joists poles

50

-

-

... More
Erection of Transformer Loading and Unloading of Transformer upto 200 KVA for each

10

-

-

... More
Erection of New Transformer upto 200 KVA

10

-

-

... More
Replacement of failed Transformers upto 200 KVA Dismantling & erection

5

-

-

... More
Loading & Erection of HT Metering set

4

-

-

... More
Resagging of conductor (LT)

250

-

-

... More
Resagging (HT) conductor ACSR 7/2.59mm

50

-

-

... More
Resagging (HT) conductor of ACSR 7/3.35 mm

50

-

-

... More
Erection of Street light including fixture fitting

20

-

-

... More
Erection of Street light service

5

-

-

... More
Fixing of new LED lamp fittings

20

-

-

... More
Releasing of grills from RCC poles

10

-

-

... More
Releasing of Single phase service wire and refixing

296

-

-

... More
Releasing of three phase service wire (up to 50 KW) and refixing

50

-

-

... More
Releasing of three phase service (above 50 KW) and refixing

5

-

-

... More
Labour charges fixing of special Type clamps for rail poles, RS Joists,Tubulator pole special clamps for Distribution Transformer Structure

50

-

-

... More
Colour washing/Painting RCC pole

20

-

-

... More
Alteration of Back clamp

100

-

-

... More
Alteration of Stay clamp

20

-

-

... More
Erection of new earth pipe by replacing the corroded earth pipe

10

-

-

... More
Bruning of Coconut tree branches

110

-

-

... More
Drilling of hole in channel only 3/4" & 1" per hole

207

-

-

... More
Cutting of plate

102

-

-

... More
Cutting of chennel

100

-

-

... More
Cutting of Angle

96

-

-

... More
Cutting of pipe

6

-

-

... More
Excavation of structure pole Pits 3'X3'x6' Nos

10

-

-

... More
Transporting of pole to pit location 2 nos.

10

-

-

... More
Erection of poles 2 Nos

10

-

-

... More
Excavation and Erection of stay pit 2 Nos

10

-

-

... More
Mass concreting 2 Nos.

10

-

-

... More
Base concreting 2 Nos

10

-

-

... More
Stay concreting 2 Nos

10

-

-

... More
Top channel 1 set

10

-

-

... More
Bed channel 1 set

10

-

-

... More
Cross with stud for bed channel

10

-

-

... More
Belting angle and H.G.Fuse Angle

10

-

-

... More
Erection of A.B.Switch

10

-

-

... More
Erection of H.G.Fuse set complete

10

-

-

... More
Structure earthing complete the pits and earth- tubes and 3 pipes completed

10

-

-

... More
Bus bar arrangements per structure

15

-

-

... More
Feeding arrangements with open type fuse unit for two feeders

15

-

-

... More
HT/LT LAS fixing and jumpering complete

10

-

-

... More
Fixing of support insulator angle and erection of 3 Nos. Pin insulators

10

-

-

... More
H.T Jumpering complete

10

-

-

... More
Excavation of Structure pole pits - 2 Nos

4

-

-

... More
Erection of poles

4

-

-

... More
Transporting of poles from road side to pit

4

-

-

... More
Erection and erection of stay pits 2 Nos

4

-

-

... More
Erection of Structure materials

4

-

-

... More
Erection of AB switch

4

-

-

... More
Structure earthing in complete

4

-

-

... More
Erection of HT Jumpers

4

-

-

... More
Structure concreting and plastering earth pits

4

-

-

... More
Dismantling of Bus bar arrangements

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.