Tamil Nadu Generation And Distribution Corporation Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date31 Jul 2024
Closing Date16 Aug 2024
Tender Amount₹ 85,668 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 3,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_EB_468318_1Bid Award Id
ViewTender No
KIC ETW - 013/24-25Tender Authority
Tamil Nadu Generation And Distribution Corporation Limited ViewPurchaser Address
-Website
http://https://www.tangedco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Rocky ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles
1
-
-
Normal ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles
1
-
-
Normal ground- Erection of 9M & 9.14M poles
1
-
-
Rocky ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles
1
-
-
Rocky ground- Erection of 9M & 9.14M poles
1
-
-
Transporting of poles from road side to pole pit - 7.32m, 7.5m, 8m, 8.23m RCC pole
1
-
-
Transporting of poles from road side to pole pit - 9m, 9.14m RCC/PSC pole
1
-
-
Loading and Unloading of poles - 7.32m, 7.5m, 8m, 8.23m RCC pole
1
-
-
Loading and Unloading of poles - 9m, 9.14m RCC/PSC pole
1
-
-
Loading & unloading of RSJ pole 36"
1
-
-
Transporting of RSJ pole 36"
1
-
-
Excavation & erection of RSJ pole 36"
1
-
-
Loading and Unloading of Line Materials
1
-
-
Concreting of poles as per Board Standards (2'*2'*5'). The material
such as cement, sand, jelly, etc., have to be supplied by the contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc,.)
1
-
-
Coping of pole (0.6m*0.6m*0.35m)
1
-
-
Concreting of stay (o.3m * 0.3m * 1.5m) including materials except cement
1
-
-
Coil earthing per pole & pole earthing
1
-
-
Normal ground- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set)
1
-
-
Normal ground- Erection of stay set
1
-
-
Rocky ground- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set)
1
-
-
Rocky ground- Erection of stay set
1
-
-
Fixing of V & Channel cross arm 3.5' including transporting of materials from road side to site
1
-
-
Fixing of LT 3Phase cross arm including transporting of materials from road side to site
1
-
-
Fixing of LT 1Phase cross arm including transporting of materials from road side to site
1
-
-
Fixing of HT LT TI fitting including transporting of materials from road side to site
1
-
-
Erection of HT Side arm with stud including transporting of materials from road side to site
1
-
-
Erection of LT Side arm with stud including transporting of materials from road side to site
1
-
-
Fixing of insulator (per location) including transporting of materials from road side to site
1
-
-
Fixing of Tapping channel X arm
1
-
-
Fixing of 11 KV Strain Disc
1
-
-
HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/2.59 ACSR (1Span/Wire)
1
-
-
HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/3.35 ACSR (1Span/Wire)
1
-
-
For HT line clear works for For 7/2.59 ACSR (1Span/Wire)
1
-
-
For HT line clear works for For 7/3.35 ACSR (1Span/Wire)
1
-
-
LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/2.59 ACSR
1
-
-
LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/3.35 ACSR
1
-
-
For LT line clear works for For 7/2.59 ACSR (1Span/Wire)
1
-
-
For LT line clear works for For 7/3.35 ACSR (1Span/Wire)
1
-
-
Erection of transformer/dismantling upto 200KVA
1
-
-
Erection of transformer/dismantling 250KVA
1
-
-
Erection of DT tmeter
1
-
-
Erection of feeder cable with open type fuse unit per feeder and for each addl feeder
1
-
-
Erection of feeder cable with open type fuse unit - for each addl feeder
1
-
-
Erection of feeder cable -Bus bar arrangement with open type
1
-
-
Loading & unloading of Distribution transformer below 250KVA
1
-
-
Loading & unloading of Distribution transformer 250KVA
1
-
-
Alteration of clamps
1
-
-
Drilling less than 23mm holes per hole/slatted hole
1
-
-
Cutting of channel
1
-
-
Cutting of Flat
1
-
-
Cutting of Angle
1
-
-
LT-Changing of pin point to cut point
1
-
-
HT-Changing of pin point to cut point
1
-
-
Dismantling of deteriorated poles with concrete in damaged condition including grill separation etc.,
1
-
-
Dismantling of poles without concrete in damaged condition including grill separation etc.,
1
-
-
Providing jumpering at cut point
1
-
-
Tree clearence in HT or LT location- For ordy. Tree clearence and Throng bushes & trees 400/head/day
1
-
-
Tree clearence in HT or LT location- For coconut trees and Palmrah trees 500/head/day
1
-
-
Erection of Distribution Transformer structure complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit HT / LT LAS and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer.
1
-
-
Erection of 11 KV single pole Structure including erection of DT complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit HT / LT LAS and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer.
1
-
-
Erection of tapping structure
1
-
-
Dismantling of stay set complete including stay rod
1
-
-
Dismantling of stay set complete Without stay rod
1
-
-
Dismantling of conductor of 7/2.59 including transporting the conductors to the nearest road side and stocking in coils
1
-
-
Dismantling of conductor 7/3.35 including transporting the conductors to the nearest road side and stocking in coils
1
-
-
Dismantling of Transformer structure materials complete set and transporting the same from the location to the road side
1
-
-
Resagging of 7/2.59 ACSR conductor
1
-
-
Resagging of 7/3.15 ACSR conductor
1
-
-
Dismantling of V Cross arm
1
-
-
Dismantling of 3 phase X Arm
1
-
-
Dismantling of Single phase X arm
1
-
-
Dismantling of HT/LT TI Fitting
1
-
-
Dismantling of HT pin Insulators
1
-
-
Dismantling of LT pin Insulators
1
-
-
Dismantling of Strain Disc
1
-
-
Hiring of JCB
1
-
-
Hiring of Crane
1
-
-
Exceeding 1 Hour for every hour
1
-
-
Transporting of Charges of DT / Line materials using private vehicle upto 20 KM ( Up and Down)
1
-
-
Beyond 20 KM for every KM
1
-
-
Maintenance of Distribution Transformer-Providing of 'U' jumpering
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements