Tamil Nadu Agricultural University Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamil Nadu Agricultural University - TNAU Tender
Civil And Construction
Road Construction
Eprocure
Opening Date24 Jun 2022
Closing Date22 Jul 2022
Tender Amount₹ 3,83,66,245
Costs
EMD
₹ 2,38,300Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_TNAU_237365_1Bid Award Id
ViewTender No
No.H/DB/DO/E-TENDER/RW/CBE/Dt 22.06.2022Tender Authority
Tamil Nadu Agricultural University ViewPurchaser Address
-Website
http://http://www.tnau.ac.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing gravel soling 300mm thick and laid in layers of not more than 75mm thick including cost and conveyance of gravel to work site including labour for laying spreading of gravel to proper camber and consolidated with power roller to active the 100% procter density under optimum moisture content including watering hire for power roller,water springler and all tools and plants employed and all other incidental charges etc., complete as per standard specification and as directed by the departmental officers.
832
-
-
... More
Providing and laying spreading and compating graded stone aggregates to Wet Mix Macadam 250mm thick spectification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with pavers in sub-base, base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., etc., complete as directed by the departmental officers and as per technical specification clause 406 of Morth REV - 5
4177
-
-
... More
Providing and laying Prime Coat over WBM / WMM surface using 7 Kg of Emulsion Bitumen (SSI) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., Complete complying with the standard specification and as directed by the departmental officers and as per Clause 502 of MORTH Rev - 5
30491
-
-
... More
Providing and laying Tack Coat over WBM / WMM Surface (treated with primer) using 2.50 kg of bitumen emulsion (RS1) per 10 Sqm for preparartory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel adn all other incidential charges etc., complete as per clause 503 of MORTH Rev-5
30491
-
-
... More
Providing and laying 50 mm consolidated thick bituminous macadam using 0.20 cum of 26.50 to 13.20 mm, 0.43 cum of 13.20 to 2.36 mm and 0.08 cum of 2.36 mm & below size IRC metal with 37 Kgs of VG 30 / VG 40 bitumen for pre mixing per10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 2030 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical paver to the specified grades and cross sections and consolidated by 8 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 2030 ton CMP with bitumen boiler, tipper trucks, Paver Finisher / 9 m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5
30491
-
-
... More
Providing and laying Tack Coat over existing BT surface using 2.00 Kg of Bitumen Emulsion (RSI) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., Complete complying with the standard specification and as directed by the departmental officers. as per Clause 503 of MORTH Rev-5
30491
-
-
... More
Providing and laying Premix Carpet with Seal Coat (Type - A) to 20mm thick using 0.18cum to 13.20mm, 0.09 cum of 11.20mm and 0.09 cum of 6.70mm IRC metal with 24.40 kgs of VG 30 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregrate to required temperature and mixing the min required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne vibratory / Pneumatic roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20 - 30 ton CMP with bitumen boiler, tipper trucks, paver finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., Complete as per specification using CMP as per clause 504 of MORTH Rev-5.
30491
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements