Rural Development And Panchayati Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayati Raj Department - RDPR Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date30 Jul 2022
Closing Date23 Aug 2022
Tender Amount₹ 33,15,261
Costs
EMD
₹ 34,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_RDTN_244837_1Bid Award Id
ViewTender No
A12/2101/2021Tender Authority
Rural Development And Panchayati Raj Department ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Clearing the scrub jungle, Julliflora Jungle and disposing of the same as directed by the Engineer incharge of works and as per technical specification [ specification 2.2]
2004
-
-
... More
Earth work in all soils except hard rock requiring blasting and conveying and formation of bund with 0 to 100m deploying earth moving machineries and tippers including benching, formation of bunds breaking clods, sectioning, labour and Hire charges for closing breaches for extra watering and consolidation by power roller including hire charges etc complete
-
-
-
... More
Channel Earthwork Quantity
2850.4
-
-
... More
Channel Earthwork Quantity
99
-
-
... More
Supplying and fixing of RCC Boundrary Stone of Size 0.15 x0.15x1.60m
15
-
-
... More
Construction of Retaining wall for Baby Pond
-
-
-
... More
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
19.85
-
-
... More
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc.
9.92
-
-
... More
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
202.29
-
-
... More
CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc.
53.25
-
-
... More
Plastering with CM 1:4 20 mm Thickness including cost and conveyance and all labour charges etc.,
39.69
-
-
... More
Construction of Bathing Ghat, Steps, Outer Platform
-
-
-
... More
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
65.81
-
-
... More
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc.
9.86
-
-
... More
Supplying and erecting centering shuttering with necessary supports including cost and
conveyance and all labour charges etc.
95.72
-
-
... More
CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc.
12.96
-
-
... More
CC 1:3:6 mix using 20mm metal including cost and conveyance and all labour charges etc.
1.17
-
-
... More
CC 1:2:4 mix using 20mm metal including cost and conveyance and all labour charges etc.
5.12
-
-
... More
Plastering with CM 1:4 20 mm Thickness including cost and conveyance and all labour charges etc.,
16.2
-
-
... More
Construction of step over bund
-
-
-
... More
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
8.06
-
-
... More
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc.
6.5
-
-
... More
Supplying and erecting centering shuttering with necessary supports including cost and
conveyance and all labour charges etc.
58.72
-
-
... More
CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc.
9.07
-
-
... More
CC 1:2:4 mix using 20mm metal including cost and conveyance and all labour charges etc.
7.51
-
-
... More
Plastering with CM 1:4 20 mm Thickness including cost and conveyance and all labour charges etc.,
10.08
-
-
... More
2.Desilting and Construction of Retaining Wall for Baby Pond and Bhading Ghat to Kzhithangal Kullam at Ponnapanthangal Panchayat
-
-
-
... More
Clearing the scrub jungle, Julliflora Jungle and disposing of the same as directed by the Engineer incharge of works and as per technical specification [ specification 2.2]
1134
-
-
... More
Earth work in all soils except hard rock requiring blasting and conveying and formation of bund with 0 to 100m deploying earth moving machineries and tippers including benching, formation of bunds breaking clods, sectioning, labour and Hire charges for closing breaches for extra watering and consolidation by power roller including hire charges etc complete
-
-
-
... More
Channel Earthwork Quantity
1787
-
-
... More
Channel Earthwork Quantity
120
-
-
... More
Supplying and fixing of RCC Boundrary Stone of Size 0.15 x0.15x1.60m
12
-
-
... More
Construction of Retaining wall for Baby Pond
-
-
-
... More
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
14
-
-
... More
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc.
7
-
-
... More
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
143.06
-
-
... More
CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc.
37.55
-
-
... More
Plastering with CM 1:4 20 mm Thickness including cost and conveyance and all labour charges etc.,
27.99
-
-
... More
Construction of Bathing Ghat, Steps, Outer Platform
-
-
-
... More
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
65.81
-
-
... More
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc.
9.86
-
-
... More
Supplying and erecting centering shuttering with necessary supports including cost and
conveyance and all labour charges etc.
95.72
-
-
... More
CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc.
12.96
-
-
... More
CC 1:3:6 mix using 20mm metal including cost and conveyance and all labour charges etc.
1.17
-
-
... More
CC 1:2:4 mix using 20mm metal including cost and conveyance and all labour charges etc.
5.12
-
-
... More
Plastering with CM 1:4 20 mm Thickness including cost and conveyance and all labour charges etc.,
16.2
-
-
... More
Construction of step over bund
-
-
-
... More
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
7.49
-
-
... More
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc.
6.03
-
-
... More
Supplying and erecting centering shuttering with necessary supports including cost and
conveyance and all labour charges etc.
54.24
-
-
... More
CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc.
8.42
-
-
... More
CC 1:2:4 mix using 20mm metal including cost and conveyance and all labour charges etc.
6.87
-
-
... More
Plastering with CM 1:4 20 mm Thickness including cost and conveyance and all labour charges etc.,
9.36
-
-
... More
3.Providing CC Pavement to Pillayar koil street (40mtr) in Ponnapanthangal H/O Ponnapanthangal Panchayat
-
-
-
... More
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B
4.8
-
-
... More
Plain Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
16.2
-
-
... More
Supply and erection of centering for all PCC item including cost and conveyance labour charges etc complete
40
-
-
... More
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials and all labour charges etc. complete
3
-
-
... More
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials and all labour charge etc. complete
10.35
-
-
... More
Supply and fixing of Bitumen pad of Thickness 12mm etc complete
1.81
-
-
... More
4.Providing CC Pavement to Cross street(80Mtr) in Ponnapanthangal H/O Ponnapanthangal Panchayat
-
-
-
... More
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B
9.6
-
-
... More
Plain Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
32.4
-
-
... More
Supply and erection of centering for all PCC item including cost and conveyance labour charges etc complete
80
-
-
... More
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials and all labour charges etc. complete
6
-
-
... More
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials and all labour charge etc. complete
20.7
-
-
... More
Supply and fixing of Bitumen pad of Thickness 12mm etc complete
3.88
-
-
... More
5.Providing CC Pavement to Bajanaikoil street(40Mtr) in Edayanthangal H/O Ponnapanthangal Panchayat
-
-
-
... More
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B
4.8
-
-
... More
Plain Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
16.2
-
-
... More
Supply and erection of centering for all PCC item including cost and conveyance labour charges etc complete
40
-
-
... More
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials and all labour charges etc. complete
3
-
-
... More
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials and all labour charge etc. complete
10.35
-
-
... More
Supply and fixing of Bitumen pad of Thickness 12mm etc complete
1.81
-
-
... More
6.Providing Fencing Arangement and foot Path to Block Nursery in Ponnapanthangal Panchayat
-
-
-
... More
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B
1.22
-
-
... More
Plain Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
0.31
-
-
... More
Supply and erection of centering for all PCC item including cost and conveyance labour charges etc complete
18.36
-
-
... More
Supply and Fabrication of steel including cost and conveyance of steel to site and all labour charges for starighting ,cutting to lenth ,bending to shape
234.56
-
-
... More
Plain Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
1.38
-
-
... More
Barbed wire -10 Gauge -Two Py and four pronged Galvanished 1Kg or 61.50
720.8
-
-
... More
Footh Path
-
-
-
... More
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
5.04
-
-
... More
Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc.,
2.1
-
-
... More
Supply and erection of centering for all PCC item including cost and conveyance labour charges etc complete
42
-
-
... More
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials and all labour charges etc. complete
3.15
-
-
... More
collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per starnadard specification
7.44
-
-
... More
Providing and laying of interlocking concrete block pavement having thicknesss 60mm and compacted over a thin beddingv sand layer of 25 mm thickness and joint shall be fine sand
59.5
-
-
... More
7.Construction of Thrashing Floor at Ponnapanthangal H/o Ponnapanthangal Panchayat
-
-
-
... More
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundasan
56.86
-
-
... More
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
49.16
-
-
... More
Supply and errecton of sheet centring with out scupolding including all charges etc completed.
124.46
-
-
... More
Cement Concrete 1:3:6 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
37.53
-
-
... More
Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc.
3.95
-
-
... More
Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
39.4
-
-
... More
Plastering with cement mortar 1:5, 12mm thick including cost and conveyance and all labour charges etc.
66.6
-
-
... More
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
1
-
-