Rural Development And Panchayat Raj Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date15 Apr 2025
Closing Date14 May 2025
Tender Amount₹ 7,08,12,000 
Notes
Download

AI Insights

Class Of Bidder
... View More
Class I and above
Technical Capacity
... View More
The required prior work experience for the bidder includes: - Degree Holder in Civil Engineering: 3 Years - Diploma Holder in Civil Engineering: 3 Years - Lab Assistant for field testing laboratory: 3 Years The bidder should have experience in works of a similar nature and size for each of the last five years. The bidder must have satisfactorily completed, as prime Contractor or Sub contractor, at least one similar work equal in value to one-third of the estimated cost of work (excluding maintenance cost for five years) for which the bid is invited. The value of similar works completed should be at least equal to the estimated contract value, but no specific percentage is mentioned. However, the bidder should have a minimum annual financial turnover of 75% of the amount put to bid, in case the amount put to bid is more than Rs.200 Lakhs, with the turnover indexed at the rate of 8% per year. Additionally, if the bidder has executed road works under Pradhan Mantri Gram SadakYojana in originally stipulated completion period, the financial turnover achieved on account of execution of road works under PMGSY shall be counted as 120% for the purpose of this sub-clause. The value of road work completed by the bidder under Pradhan Mantri Gram SadakYojana in originally stipulated period of completion shall be treated 120% for the purpose of this Sub-Clause. The bidder should also provide proposals for subcontracting the components of the Works for construction/up-gradation, aggregating to not more than 25 percent of the Contract Price.

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Scarifying the Existing Bituminous road surface to a depth of 100 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.

-

-

-

... More
Km : 0/0 - 8/415

10412.54

-

-

... More
Construction of Embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5

-

-

-

... More
Km. 0/0 - 1/0

1109.48

-

-

... More
Km. 1/0 - 2/0

1132.01

-

-

... More
Km. 2/0 - 3/0

1114.06

-

-

... More
Km. 3/0 - 4/0

1132.93

-

-

... More
Km. 4/0 - 4/5

554.34

-

-

... More
Km. 4/5 - 5/0

556.94

-

-

... More
Km. 5/0 - 6/0

1114.94

-

-

... More
Km. 6/0 - 7/0

1134.45

-

-

... More
Km. 7/0 - 8/0

888.51

-

-

... More
Km. 8/0 - 8/415

470.79

-

-

... More
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel Shoulder)

-

-

-

... More
Km. 0/0 - 1/0

558.19

-

-

... More
Km. 1/0 - 2/0

555.98

-

-

... More
Km. 2/0 - 3/0

557.61

-

-

... More
Km. 3/0 - 4/0

559.24

-

-

... More
Km. 4/0 - 4/5

277.99

-

-

... More
Km. 4/5 - 5/0

281.25

-

-

... More
Km. 5/0 - 6/0

555.13

-

-

... More
Km. 6/0 - 7/0

559.24

-

-

... More
Km. 7/0 - 8/0

557.33

-

-

... More
Km. 8/0 - 8/415

230.96

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 (WMM).

-

-

-

... More
Km. 0/0 - 1/0

565.32

-

-

... More
Km. 1/0 - 2/0

558.63

-

-

... More
Km. 2/0 - 3/0

557.61

-

-

... More
Km. 3/0 - 4/0

562.33

-

-

... More
Km. 4/0 - 4/5

287.37

-

-

... More
Km. 4/5 - 5/0

290.44

-

-

... More
Km. 5/0 - 6/0

562.47

-

-

... More
Km. 6/0 - 7/0

560.69

-

-

... More
Km. 7/0 - 8/0

567.94

-

-

... More
Km. 8/0 - 8/415

235.64

-

-

... More
Providing and laying Bituminous Macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504 (Using Waste Plastic).

-

-

-

... More
Km. 0/0 - 1/0

188.44

-

-

... More
Km. 1/0 - 2/0

186.2

-

-

... More
Km. 2/0 - 3/0

185.87

-

-

... More
Km. 3/0 - 4/0

187.44

-

-

... More
Km. 4/0 - 4/5

95.79

-

-

... More
Km. 4/5 - 5/0

96.82

-

-

... More
Km. 5/0 - 6/0

187.48

-

-

... More
Km. 6/0 - 7/0

186.9

-

-

... More
Km. 7/0 - 8/0

189.3

-

-

... More
Km. 8/0 - 8/415

78.55

-

-

... More
Providing and applying Prime Coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. (i) Low Porosity

-

-

-

... More
Km. 0/0 - 1/0

3768.75

-

-

... More
Km. 1/0 - 2/0

3724.19

-

-

... More
Km. 2/0 - 3/0

3717.37

-

-

... More
Km. 3/0 - 4/0

3748.88

-

-

... More
Km. 4/0 - 4/5

1915.75

-

-

... More
Km. 4/5 - 5/0

1936.28

-

-

... More
Km. 5/0 - 6/0

3749.77

-

-

... More
Km. 6/0 - 7/0

3737.92

-

-

... More
Km. 7/0 - 8/0

3786.25

-

-

... More
Km. 8/0 - 8/415

1571

-

-

... More
Providing and applying Tack Coat with Bitumen Emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared Granular surface treated with Primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 (ii).

-

-

-

... More
Km. 0/0 - 1/0

3797.48

-

-

... More
Km. 1/0 - 2/0

3767.69

-

-

... More
Km. 2/0 - 3/0

3750

-

-

... More
Km. 3/0 - 4/0

3770.63

-

-

... More
Km. 4/0 - 4/5

1937.5

-

-

... More
Km. 4/5 - 5/0

1936.28

-

-

... More
Km. 5/0 - 6/0

3798.9

-

-

... More
Km. 6/0 - 7/0

3759.67

-

-

... More
Km. 7/0 - 8/0

3820.75

-

-

... More
Km. 8/0 - 8/415

1587.5

-

-

... More
Providing, laying and rolling of Close-Graded Premix Surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 [MSS Using Waste Plastic].

-

-

-

... More
Km. 0/0 - 1/0

3797.48

-

-

... More
Km. 1/0 - 2/0

3767.69

-

-

... More
Km. 2/0 - 3/0

3750

-

-

... More
Km. 3/0 - 4/0

3770.63

-

-

... More
Km. 4/0 - 4/5

1937.5

-

-

... More
Km. 4/5 - 5/0

1936.28

-

-

... More
Km. 5/0 - 6/0

3798.9

-

-

... More
Km. 6/0 - 7/0

3759.67

-

-

... More
Km. 7/0 - 8/0

3820.75

-

-

... More
Km. 8/0 - 8/415

1587.5

-

-

... More
Provision of Rumble Strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.

-

-

-

... More
Km. 0/0 - 1/0

22.5

-

-

... More
Km. 1/0 - 2/0

5.63

-

-

... More
Km. 3/0 - 4/0

16.88

-

-

... More
Km. 4/5 - 5/0

5.63

-

-

... More
Km. 5/0 - 6/0

22.5

-

-

... More
Km. 6/0 - 7/0

11.25

-

-

... More
Km. 7/0 - 8/0

33.76

-

-

... More
Provision for Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface

1683

-

-

... More
Provision for Road Marker/ Road stud with lens Reflector

210

-

-

... More
Provision for Name Board

2

-

-

... More
Provision for PMGSY Logo Board

6

-

-

... More
Provision for Sign Board (1 curve =2Nos)

42

-

-

... More
Provision for Chevron Sign Octogan Board (90cm)

2

-

-

... More
Provision for 60 cm Circle(Mandatory Sign Board)

4

-

-

... More
Provision for Reflector - Traffic signs (Near culverts & trees) - Star sign Sticker

100

-

-

... More
Provision for Citizen Information Board

2

-

-

... More
Provision for Maintenance Board

2

-

-

... More
Provision for KM Stone

8

-

-

... More
Provision for HM Stone

34

-

-

... More
Construction of Single Row Pipe Culvert at Ch 2870 3125 7350

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Pipe culvert at : 7350

-

-

-

... More
Removal of Pipes

7.5

-

-

... More
Removal of Body wall

1.16

-

-

... More
Cut Stone Slab at : 2870, 3125

-

-

-

... More
Removal of Deck, Abutment & Wings

19.58

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
1 Row Pipe Culvert @ Ch. 2870

65.29

-

-

... More
1 Row Pipe Culvert @ Ch. 3125

65.29

-

-

... More
1 Row Pipe Culvert @ Ch. 7350

65.29

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
1 Row Pipe Culvert @ Ch. 2870

2.53

-

-

... More
1 Row Pipe Culvert @ Ch. 3125

2.53

-

-

... More
1 Row Pipe Culvert @ Ch. 7350

2.53

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1 Row Pipe Culvert @ Ch. 2870

5.89

-

-

... More
1 Row Pipe Culvert @ Ch. 3125

5.89

-

-

... More
1 Row Pipe Culvert @ Ch. 7350

5.89

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works

-

-

-

... More
1 Row Pipe Culvert @ Ch. 2870

13.34

-

-

... More
1 Row Pipe Culvert @ Ch. 3125

13.34

-

-

... More
1 Row Pipe Culvert @ Ch. 7350

13.34

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For STEM as 10% Rate for Centering Works

-

-

-

... More
1 Row Pipe Culvert @ Ch. 2870

14.81

-

-

... More
1 Row Pipe Culvert @ Ch. 3125

14.81

-

-

... More
1 Row Pipe Culvert @ Ch. 7350

14.81

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
1 Row Pipe Culvert @ Ch. 2870

14.04

-

-

... More
1 Row Pipe Culvert @ Ch. 3125

14.04

-

-

... More
1 Row Pipe Culvert @ Ch. 7350

14.04

-

-

... More
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row

-

-

-

... More
1 Row Pipe Culvert @ Ch. 2870

7.5

-

-

... More
1 Row Pipe Culvert @ Ch. 3125

7.5

-

-

... More
1 Row Pipe Culvert @ Ch. 7350

7.5

-

-

... More
Construction of Gravel/Soil-aggregate Base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller to achieve the desired density, complete as per Technical Specifications Clause 401 Grading III (GSB).

-

-

-

... More
1 Row Pipe Culvert @ Ch. 2870

2.27

-

-

... More
1 Row Pipe Culvert @ Ch. 3125

2.27

-

-

... More
1 Row Pipe Culvert @ Ch. 7350

2.27

-

-

... More
Construction of 1.5 m SPAN RCC Slab culvert at Ch 1140 1300 7330 7565

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Pipe culvert at : 7330, 7565

-

-

-

... More
Removal of Pipes

15

-

-

... More
Removal of Body wall

2.32

-

-

... More
Cut Stone Slab at : 1140, 1300

-

-

-

... More
Removal of Deck, Abutment & Wings

19.58

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
1.5mCulvert @ Ch. 1140 1300

179.74

-

-

... More
1.5mCulvert @ Ch. 7330 7565

179.74

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
1.5mCulvert @ Ch. 1140 1300

15.86

-

-

... More
1.5mCulvert @ Ch. 7330 7565

15.86

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5mCulvert @ Ch. 1140 1300

21.14

-

-

... More
1.5mCulvert @ Ch. 7330 7565

21.14

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works

-

-

-

... More
1.5mCulvert @ Ch. 1140 1300

102.24

-

-

... More
1.5mCulvert @ Ch. 7330 7565

102.24

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For STEM as 10% Rate for Centering Works

-

-

-

... More
1.5mCulvert @ Ch. 1140 1300

58.24

-

-

... More
1.5mCulvert @ Ch. 7330 7565

58.24

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5mCulvert @ Ch. 1140 1300

6.72

-

-

... More
1.5mCulvert @ Ch. 7330 7565

6.72

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

-

-

-

... More
1.5mCulvert @ Ch. 1140 1300

6.62

-

-

... More
1.5mCulvert @ Ch. 7330 7565

6.62

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
1.5mCulvert @ Ch. 1140 1300

0.7

-

-

... More
1.5mCulvert @ Ch. 7330 7565

0.7

-

-

... More
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

-

-

-

... More
1.5mCulvert @ Ch. 1140 1300

30

-

-

... More
1.5mCulvert @ Ch. 7330 7565

30

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
1.5mCulvert @ Ch. 1140 1300

9

-

-

... More
1.5mCulvert @ Ch. 7330 7565

9

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
1.5mCulvert @ Ch. 1140 1300

24

-

-

... More
1.5mCulvert @ Ch. 7330 7565

24

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
1.5mCulvert @ Ch. 1140 1300

18.5

-

-

... More
1.5mCulvert @ Ch. 7330 7565

18.5

-

-

... More
Construction of 1.5 m SPAN RCC Slab culvert at Ch 5180 5680 5880 6417 6560

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Pipe culvert at : 5180, 5680, 5880, 6417, 6560

-

-

-

... More
Removal of Pipes

37.5

-

-

... More
Removal of Body wall

5.8

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
1.5mCulvert @ Ch. 5180 5680 5880

267.54

-

-

... More
1.5mCulvert @ Ch. 6417 6560

178.36

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
1.5mCulvert @ Ch. 5180 5680 5880

23.61

-

-

... More
1.5mCulvert @ Ch. 6417 6560

15.74

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5mCulvert @ Ch. 5180 5680 5880

31.5

-

-

... More
1.5mCulvert @ Ch. 6417 6560

21

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works

-

-

-

... More
1.5mCulvert @ Ch. 5180 5680 5880

151.68

-

-

... More
1.5mCulvert @ Ch. 6417 6560

101.12

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For STEM as 10% Rate for Centering Works

-

-

-

... More
1.5mCulvert @ Ch. 5180 5680 5880

82.41

-

-

... More
1.5mCulvert @ Ch. 6417 6560

54.94

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5mCulvert @ Ch. 5180 5680 5880

10.08

-

-

... More
1.5mCulvert @ Ch. 6417 6560

6.72

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

-

-

-

... More
1.5mCulvert @ Ch. 5180 5680 5880

9.93

-

-

... More
1.5mCulvert @ Ch. 6417 6560

6.62

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
1.5mCulvert @ Ch. 5180 5680 5880

1.05

-

-

... More
1.5mCulvert @ Ch. 6417 6560

0.7

-

-

... More
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

-

-

-

... More
1.5mCulvert @ Ch. 5180 5680 5880

45

-

-

... More
1.5mCulvert @ Ch. 6417 6560

30

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
1.5mCulvert @ Ch. 5180 5680 5880

13.5

-

-

... More
1.5mCulvert @ Ch. 6417 6560

9

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
1.5mCulvert @ Ch. 5180 5680 5880

36

-

-

... More
1.5mCulvert @ Ch. 6417 6560

24

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
1.5mCulvert @ Ch. 5180 5680 5880

27.75

-

-

... More
1.5mCulvert @ Ch. 6417 6560

18.5

-

-

... More
Construction of 3.0 m SPAN RCC Slab culvert at Ch 8235

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Pipe culvert at : 500

-

-

-

... More
Removal of Pipes

7.5

-

-

... More
Removal of Body wall

1.16

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
3.0mCulvert @ Ch. 8235

91.61

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
3.0mCulvert @ Ch. 8235

8.09

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed including centering and shuttering.

-

-

-

... More
3.0mCulvert @ Ch. 8235

10.78

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.For Footings as 4% Rate for Centering Works

-

-

-

... More
3.0mCulvert @ Ch. 8235

52.52

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Stem as10% Rate for Centering Works

-

-

-

... More
3.0mCulvert @ Ch. 8235

34.66

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
3.0mCulvert @ Ch. 8235

3.9

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

-

-

-

... More
3.0mCulvert @ Ch. 8235

8.1

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
3.0mCulvert @ Ch. 8235

0.88

-

-

... More
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

-

-

-

... More
3.0mCulvert @ Ch. 8235

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
3.0mCulvert @ Ch. 8235

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
3.0mCulvert @ Ch. 8235

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
3.0mCulvert @ Ch. 8235

9.25

-

-

... More
Construction of 2 x 3.0 m SPAN RCC Slab culvert at Ch 75

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Pipe culvert at : 75

-

-

-

... More
Removal of Pipes

67.5

-

-

... More
Causeway at : 75

-

-

-

... More
Removal of Wearing Coat & CC

75

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
2 x 4.0m Culvert @ Ch. 75

179.65

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
2 x 4.0m Culvert @ Ch. 75

15.85

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed including centering and shuttering.

-

-

-

... More
2 x 4.0m Culvert @ Ch. 75

21.13

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Footings as 4% Rate for Centering Works

-

-

-

... More
2 x 4.0m Culvert @ Ch. 75

107.07

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Stem as10% Rate for Centering Works

-

-

-

... More
2 x 4.0m Culvert @ Ch. 75

56.2

-

-

... More
Cement concrete 1 : 1.5 : 3 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed including centering and shuttering.

-

-

-

... More
2 x 4.0m Culvert @ Ch. 75

27.11

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
2 x 4.0m Culvert @ Ch. 75

2.36

-

-

... More
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

-

-

-

... More
2 x 4.0m Culvert @ Ch. 75

22.5

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
2 x 4.0m Culvert @ Ch. 75

9.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
2 x 4.0m Culvert @ Ch. 75

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
2 x 4.0m Culvert @ Ch. 75

10.69

-

-

... More
Construction of , 50, 50 m Retaining wall at Ch 7838, 8008.

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
Protective works@ Ch.7838 - 7888

102

-

-

... More
Protective works@ Ch.8008 - 8058

102

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
Protective works@ Ch.7838 - 7888

12.75

-

-

... More
Protective works@ Ch.8008 - 8058

12.75

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Protective works@ Ch.7838 - 7888

12.75

-

-

... More
Protective works@ Ch.8008 - 8058

12.75

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Footings as 4% Rate for Centering Works

-

-

-

... More
Protective works@ Ch.7838 - 7888

42

-

-

... More
Protective works@ Ch.8008 - 8058

42

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For Sub - Structure as 10% Rate for Centering Works

-

-

-

... More
Protective works@ Ch.7838 - 7888

63.44

-

-

... More
Protective works@ Ch.8008 - 8058

63.44

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, RETURN WALL, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing

-

-

-

... More
Protective works@ Ch.7838 - 7888

33

-

-

... More
Protective works@ Ch.8008 - 8058

33

-

-

... More
Part-B:- Maintenance work

-

-

-

... More
Maintenance Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost

-

-

-

... More
For the First Year from the date of completion of work

8.42

-

-

... More
For the Second Year from the date of cpmpletion of work

8.42

-

-

... More
For the Third Year from the date of completion of work

8.42

-

-

... More
For the Fourth Year from the date of completion of work

8.42

-

-

... More
For the Fifth Year from the date of completion of work

8.42

-

-

... More
GST Amount for providing Service to the above Government Contract Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.