Rural Development And Panchayat Raj Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date24 Mar 2025
Closing Date2 Apr 2025
Tender Amount₹ 11,72,000 
Notes
Download

Costs

Summary

Construction Of Multipurpose Centre Building At Bothakadu Village H/o Bothakadu. (dpi24rur011)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Main Column, Toilet Column, Grade Beam, Main wall alround, Toilet wall alround, D/F Column Area, D/F Column Area, Flooring, Hall, Toilet, D/F WC, Step

7.76

-

-

... More
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications. Basement, Main wall alround, toilet wall alround, super structure - Wall alround upto lintel, toilet wall alround, parapet alround, Step I, Step II, Step III, Step IV, Door D Door D1, Windows W, Ventilator, Coloumn Portion.

22.02

-

-

... More
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle Column, Column upto grade beam, column upto grade beam, Grade beam inner, Alround, Alround Toilet

21.39

-

-

... More
Basement to Top of Parapet For Columns For Columns Toilet

21.99

-

-

... More
Lintel - Alround, Alround Roof Beam - Alround, Beam Sides Roof Slab - Ceiling - Hall, Toilet, Outsides alround, Bottom - Door D, Door D1, Windows

60.76

-

-

... More
Sunshade - window, frount sunshade, sides, loft in store, rear side windows

9.66

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs Column Matt, Coping, Column, Coping, Grade beam, alround, for columns, for columns toilet, roof level beam, alround, beam alround, sunshade front, rear side windows, roof slab, Toilet Roof Slab

17.48

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.

1.7

-

-

... More
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. Ceiling, Hall, Beam sides, sunshade, sunshade bottom & Top, Alround front, front sunshade, sides

50.66

-

-

... More
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Inside Allround, Toilet allround, outer alround, toilet sides, soffits, Door D, Door D1, Windows W, Jolly, Parapet Top Step Sides 1, Step sides 2, Door D, Door D1, Windows W, Jolly, Wall Tiles

214.5

-

-

... More
Weathering course concrete using best quality broken brick jelly of size 20mm in pure slacked lime over the RCC roof slab in th proportion of brick jelly to lime being32:12.5 by the volume and laid over a single layer and consolidated to the required dses Main Building, Toilet Portion

2.73

-

-

... More
Finishing the top of roof with one course of machine pressed tiles of size 20 x 20 x 2cm of approved quality laid in CM 1:3, 12mm thick. With water proofing compound confirming to IS by 2% by weight of cement used & the joint pointed neatly to full depth Main Building, Splash Protion, Toilet Portion, Splash Portion

40.49

-

-

... More
Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) Using anti-skid tiles (Observed Data) Flooring, Hall , Side Alround

35.66

-

-

... More
Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick including finishing the joints neatly completed. Toilet, D/F WC

3.04

-

-

... More
Dadooing walls with Colour Glazed tiles of any colour and any size laid in CM 1:2, 10mm thick. and pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complying with the standard. Toilet sides Alround, D/F Door D

6.35

-

-

... More
Distembering two coats using best approved Interiar oil destember with one coat primer over New plastered Surface including cost and conveyance of materials and labour charges etc complete. Ceiling, Hall, Beam sides, toilet, bottom, Door D, Door D1, Windows W, Jolly, sunshade bottom, front sunshade bottom, inside alround, toilet alround, soffits, Door D, Door D1, Windows W, Jolly, Door D, Door D1, Windows W, Jolly, Wall Tiles

139.27

-

-

... More
Painting Two Coats Approved Plastic Emultion Paint with one coat primer over New Cement Plastered surface including cost and conveyance of materials and labour charges etc complete.Schedule ItemNo.359 – B) Outer alround, toilet sides, parapet top, sunshade side, front sunshade side, Door D, Windows W, Ventilator

106.86

-

-

... More
Painting two Coats over New iron Works using best quality of enamel paint including cost and conveyance of materials and labour charges etc complete. Door D, Door D1, Windows W, Ventilator

16.18

-

-

... More
Supply and cost of steel door, window, Ventilator Door D (1.00x 2.00m)

1

-

-

... More
Door D1 (0.85 x 2.00m)

1

-

-

... More
Windows (0.90 x 1.20m)

4

-

-

... More
Jolly (0.60x0.45m)

1

-

-

... More
Fixing charges for doors, windows and ventilators Door D (1.00x 2.00m) Door D1 (0.85 x 2.00m)

3.7

-

-

... More
Windows (0.90 x 1.20m) Jolly (0.60x0.45m)

4.59

-

-

... More
Provision for Electrification arrangements Light & Fan Point SD.no.23

6

-

-

... More
Supply&Fixing of Tube Light SD.no.88

2

-

-

... More
CFL SD.no.80

1

-

-

... More
Supply&Fixing of Street light SD No.94

1

-

-

... More
Supply & Fixing of Fan SD.no.110

2

-

-

... More
Plug Point SD.no.36

3

-

-

... More
Power Plug Point SD.no.39

1

-

-

... More
S & Fixing DP Main switch SD.no.142

1

-

-

... More
S & FixingTNEB Meter board SD.no.125

1

-

-

... More
Service pipe SD.no.73

2.1

-

-

... More
Service Connection SD.no.68

20

-

-

... More
Service Charge to EB

1

-

-

... More
Supplying and fixing P.V.C rainwater down fall pipe of 100mm dia with necessary shoes, bends,& clamps etc.,

8

-

-

... More
Provision for RWHS including pipes & specials etc., all complete

1

-

-

... More
Provision of wash basin

1

-

-

... More
Provision of EWC,

1

-

-

... More
Provision of Leach Pit arrangements

1

-

-

... More
Provision for Name board charges

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.