Rural Development And Panchayat Raj Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - PMGSY Tender

Civil And Construction
Building Construction
Eprocure
Opening Date2 Jul 2022
Closing Date18 Jul 2022
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Main pond

1248.54

-

-

... More
Baby pond

256

-

-

... More
Channel area

40.5

-

-

... More
CIVIL WORK

-

-

-

... More
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation

47.96

-

-

... More
Supplying and filling with Sand for foundation and basement layers of not more than 15cm thick well rammed and watering Complying with standard specification

17.9

-

-

... More
Cement concrete for foundation 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification

23

-

-

... More
Providing Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete

66.54

-

-

... More
Pointing with cement mortar 1:3 mix to 10 mm thick for RR Masonry including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm

83.7

-

-

... More
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm

87.81

-

-

... More
Provision for Name board charges

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-

... More
Part 2 : Deepening and Strengthining, Construction of Surplus wier at Nambinayakkenkulam in Kovilur panchayat Estimate Amount Rs.15.00 lakhs

-

-

-

... More
Cleaning light Jungle (based on standard schedule of rates vid., S.no 2 Item no.2)

47196

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying by earth by deploying earth moving machineries and tippers etc complete Fomation of bund in layer of suitable thickness benching of slopes prior to placement od earth fill breaking clods watering to OMC (Optimum moidture content) and compaction of each layer to 95% proctor density through deployment of appropriate compaction eqipement (+-8-10T Power roller /Vibtratory power roller / short width +-0.90m with drum) power roller or vibratory power roller / fuel oparated or elect - oparated plade compactor ensuring compaction of dedigned bund section including side slopes" complete as per specification. Earth work in machineries - ( P - 24 54 ) - 50.00Power roller ( P - 24 57 ) - 29.50

-

-

-

... More
With Compaction

1633.59

-

-

... More
Without Compaction

202.5

-

-

... More
CIVIL WORK

-

-

-

... More
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation

124.1

-

-

... More
Cement concrete for foundation 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification

28.9

-

-

... More
Cement Concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance pf all materials to site and all labour charges etc complete

115.19

-

-

... More
Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm

224.66

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

8.87

-

-

... More
Provision for Name board charges

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-

... More
Part 3 : Deepening and Strengthining of Thoppiimadaikulam MI Tank in Kovilur panchayat Estimate Amount Rs.4.00 lakhs

-

-

-

... More
Cleaning light Jungle (based on standard schedule of rates vid., S.no 2 Item no.2)

32578.4

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying by earth by deploying earth moving machineries and tippers etc complete Fomation of bund in layer of suitable thickness benching of slopes prior to placement od earth fill breaking clods watering to OMC (Optimum moidture content) and compaction of each layer to 95% proctor density through deployment of appropriate compaction eqipement (+-8-10T Power roller /Vibtratory power roller / short width +-0.90m with drum) power roller or vibratory power roller / fuel oparated or elect - oparated plade compactor ensuring compaction of dedigned bund section including side slopes" complete as per specification. Earth work in machineries - ( P - 24 54 ) - 50.00Power roller ( P - 24 57 ) - 29.50

-

-

-

... More
With Compaction

2508.49

-

-

... More
Without Compaction

90

-

-

... More
Provision for Name board charges

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-

... More
Part 4 : Deepening and Strengthining, Construction of Surplus wier at Settikulam MI Tank in Nagayakottai panchayat Estimate Amount Rs.12.25 lakhs

-

-

-

... More
Cleaning light Jungle (based on standard schedule of rates vid., S.no 2 Item no.2)

1680

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying by earth by deploying earth moving machineries and tippers etc complete Fomation of bund in layer of suitable thickness benching of slopes prior to placement od earth fill breaking clods watering to OMC (Optimum moidture content) and compaction of each layer to 95% proctor density through deployment of appropriate compaction eqipement (+-8-10T Power roller /Vibtratory power roller / short width +-0.90m with drum) power roller or vibratory power roller / fuel oparated or elect - oparated plade compactor ensuring compaction of dedigned bund section including side slopes" complete as per specification. Earth work in machineries - ( P - 24 54 ) - 50.00Power roller ( P - 24 57 ) - 29.50

-

-

-

... More
With Compaction

3114.56

-

-

... More
Without Compaction

40.5

-

-

... More
CIVIL WORK

-

-

-

... More
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation

103.13

-

-

... More
Cement concrete for foundation 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification

19.46

-

-

... More
Cement Concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance pf all materials to site and all labour charges etc complete

105.81

-

-

... More
Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm

204.09

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

6.39

-

-

... More
Provision for Name board charges

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-

... More
Part 5 : Deepening and Strengthining of Thonniveerankukam MI Tank in Nagayakottai panchayat Estimate Amount Rs.6.25 lakhs

-

-

-

... More
Cleaning light Jungle (based on standard schedule of rates vid., S.no 2 Item no.2)

16167.56

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying by earth by deploying earth moving machineries and tippers etc complete Fomation of bund in layer of suitable thickness benching of slopes prior to placement od earth fill breaking clods watering to OMC (Optimum moidture content) and compaction of each layer to 95% proctor density through deployment of appropriate compaction eqipement (+-8-10T Power roller /Vibtratory power roller / short width +-0.90m with drum) power roller or vibratory power roller / fuel oparated or elect - oparated plade compactor ensuring compaction of dedigned bund section including side slopes" complete as per specification. Earth work in machineries - ( P - 24 54 ) - 50.00Power roller ( P - 24 57 ) - 29.50

-

-

-

... More
With Compaction

6194.96

-

-

... More
Without Compaction

90

-

-

... More
Provision for Name board charges

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-

... More
Part 6 : Deepening and Strengthining, Construction of Surplus wier at Thirumalaigoundan kulam MI Tank in Nagampatty panchayat Estimate Amount Rs.13.50 lakhs

-

-

-

... More
Cleaning light Jungle (based on standard schedule of rates vid., S.no 2 Item no.2)

18000

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying by earth by deploying earth moving machineries and tippers etc complete Fomation of bund in layer of suitable thickness benching of slopes prior to placement od earth fill breaking clods watering to OMC (Optimum moidture content) and compaction of each layer to 95% proctor density through deployment of appropriate compaction eqipement (+-8-10T Power roller /Vibtratory power roller / short width +-0.90m with drum) power roller or vibratory power roller / fuel oparated or elect - oparated plade compactor ensuring compaction of dedigned bund section including side slopes" complete as per specification. Earth work in machineries - ( P - 24 54 ) - 50.00Power roller ( P - 24 57 ) - 29.50

-

-

-

... More
With Compaction

3735

-

-

... More
Without Compaction

60.75

-

-

... More
CIVIL WORK

-

-

-

... More
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation

102.58

-

-

... More
Cement concrete for foundation 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification

23.33

-

-

... More
Cement Concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance pf all materials to site and all labour charges etc complete

99.07

-

-

... More
Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm

200.95

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

6.49

-

-

... More
Provision for Name board charges

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-

... More
Part 7 : Deepening and Strengthining, Construction of Baby pond, Main Pond, Bhathing ghat for Seelnayakkenpatty Pond in Palapatty panchayat Estimate Amount Rs.11.50 lakhs

-

-

-

... More
Cleaning light Jungle (based on standard schedule of rates vid., S.no 2 Item no.2)

11988

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (based on standard schedule of rates vid., S.no 86 Item no.1)

-

-

-

... More
Main pond

1066.46

-

-

... More
Baby pond

625

-

-

... More
Channel area

12.72

-

-

... More
CIVIL WORK

-

-

-

... More
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation

64.69

-

-

... More
Supplying and filling with Sand for foundation and basement layers of not more than 15cm thick well rammed and watering Complying with standard specification

30.6

-

-

... More
Cement concrete for foundation 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification

37.05

-

-

... More
Providing Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete

117.38

-

-

... More
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm

136.7

-

-

... More
Provision for Name board charges

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-

... More
Part 8 : Deepening and Strengthining, Construction of Surplus wier at Vellanampatty AD colony Piravigoundankulam MI Tank in Thattarapatty panchayat Estimate Amount Rs.12.80 lakhs

-

-

-

... More
Cleaning light Jungle (based on standard schedule of rates vid., S.no 2 Item no.2)

4950

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying by earth by deploying earth moving machineries and tippers etc complete Fomation of bund in layer of suitable thickness benching of slopes prior to placement od earth fill breaking clods watering to OMC (Optimum moidture content) and compaction of each layer to 95% proctor density through deployment of appropriate compaction eqipement (+-8-10T Power roller /Vibtratory power roller / short width +-0.90m with drum) power roller or vibratory power roller / fuel oparated or elect - oparated plade compactor ensuring compaction of dedigned bund section including side slopes" complete as per specification. Earth work in machineries - ( P - 24 54 ) - 50.00Power roller ( P - 24 57 ) - 29.50

-

-

-

... More
With Compaction

4189.03

-

-

... More
Without Compaction

35.63

-

-

... More
CIVIL WORK

-

-

-

... More
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation

87.17

-

-

... More
Cement concrete for foundation 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification

16.99

-

-

... More
Cement Concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance pf all materials to site and all labour charges etc complete

98.24

-

-

... More
Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm

204.18

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

6.39

-

-

... More
Provision for Name board charges

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.