Rural Development And Panchayat Raj Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date26 Jul 2024
Closing Date1 Aug 2024
Tender Amount₹ 18,42,000 
Notes
Download

Costs

Summary

Construction Of New Oht 30000 Lit. Erangkattukottai H/o Hale Dharmapuri Pt.po16

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Second depth of 1m, For foundation

8.06

-

-

... More
Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete as directed by TWAD Board officers.

-

-

-

... More
For foundation

2.3

-

-

... More
For GL Landing Platform for ladder

0.15

-

-

... More
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers.

-

-

-

... More
For foundation

3.46

-

-

... More
For GL Brace

0.18

-

-

... More
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 20mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers.

-

-

-

... More
For GL Landing Platform for ladder

0.22

-

-

... More
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by TWAD Boa

-

-

-

... More
For items 1.5m to 4.5m below GL FOOTING Rectangular Portion Trapezoidal portion

7.58

-

-

... More
For items 0 to 1.50m below GL For column upto G.L. For GL brace For GL brace extended portion for landing slab

1.75

-

-

... More
For items 0m to 4.5m above GL Columns Brace No 1 at 2.715m For brace extended portion for landing slab For Landing Platform for ladder

2.57

-

-

... More
For items 4.51m to 7.32m above GL Columns Brace no 2 @5.58m For brace extended portion for landing slab For Landing Platform for ladder

1.97

-

-

... More
For items 7.32m to 10.98m above GL Columns For beam at 11.45m above GL For brace extended portion for landing slab For Landing Platform for ladder

2.27

-

-

... More
For items 10.98m to 14.64m above GL Columns For beam at 11.45m above GL For beam extended portion for landing slab For Landing Platform for ladder For floor slab at 11.61m above GL For haunches Sidewall

11.34

-

-

... More
For items above 14.64m & up to 18.30m from GL Sidewall For Roof Slab @14.75 to 14.93 m from GL Deduction for manhole cover For PVC cowl

3.11

-

-

... More
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding

-

-

-

... More
PLANE SURFACES Below G.L. For Footing Side For GL Brace bottom For GL Brace sides GL brace extn portion-bottom GL brace extn portion-outside GL brace extn portion-inside LANDING PLATFORM GL Landing Platform-side GL Landing Platform-outside GL Landing Platform-Bottom

19.62

-

-

... More
ABOVE G.L. to 3.30m For Ist Brace bottom @2.715m For Ist Brace Brace sides Brace extn portion-bottom Brace extn portion-outside Brace extn portion-inside Brace extn portion-face Landing Platform-side Landing Platform-outside FROM FLOOR TO 3.30 M Roof slab bottom For sidewall junction with Roof bottom ADD Sides of manhole

25.98

-

-

... More
5.30m . to 6.30m For IInd Brace bottom @5.58m For IInd Brace Brace sides Brace extn portion-bottom Brace extn portion-outside Brace extn portion-inside Brace extn portion-face Landing Platform-side Landing Platform-outside Landing Platform-Bottom

12.01

-

-

... More
8.30m . to 9.30m For IIIrd Brace bottom @8.445m For IIInd Brace Brace sides Brace extn portion-bottom Brace extn portion-outside Brace extn portion-inside Brace extn portion-face Landing Platform-side Landing Platform-outside Landing Platform-Bottom

12.01

-

-

... More
11.31m to 12.30m Floor beam bottom @11.45 m Floor beam inside outside Beam Extn Portion bottom outside inside face Landing platform side outside bottom Deuduct Beam bottom Coloumn Juction

44.51

-

-

... More
Curved Surface 0 to 3.30m from floor level Sides of floor slab Side wall outer Side wall inner Haunch (slanting) Sides of roof slab

82.76

-

-

... More
Square column Below G.L. Column below G.L. Deduct brace junction

6.48

-

-

... More
Ground level to 3.30 m Ground level to 3.30 m Deduct brace @2.715

15.12

-

-

... More
Square column

-

-

-

... More
3.31 to 4.30m

4.8

-

-

... More
4.31 to 5.30m

4.8

-

-

... More
5.31 to 6.30m

4.08

-

-

... More
6.31 to 7.30m

4.8

-

-

... More
7.31 to 8.30m

4.8

-

-

... More
8.31 to 9.30m

4.08

-

-

... More
9.31 to 10.30m

4.8

-

-

... More
10.31 to 11.30m

4.8

-

-

... More
11.31 to 12.30m

0.72

-

-

... More
Painting two coats with approved cement paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete and as directed by TWAD Board officers

176.29

-

-

... More
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by TWAD Board officers.

51.09

-

-

... More
Fabrication, supply, delivery and fixing of outside MS Ladder of 45cm clear wide made out of 50 mm x 50mm x 6mm MS angle for both sides and for steps at 30cm C/C welded jointed etc ., for I staging from GL to 1st level brace (weight 4.5kg/m) IInd and IIIrd staging upto floor slab and IVth staging from floor slab to roof top. Supply, delivery and fixing of 32 mm GI pipes medium for hand rails from I stage to IVth stage. RCC M30 Grade mix for Landing slab 5 nos. at Ground Level- 1No. and above Ground Level - 4Nos. Supply and fixing of 32mm GI pipe medium for hand rails for the Landing slab. Supplying and fixing of MS Base plate of 100mm X 100mm X 6mm thick for fixing Anchore fastener bolt for fixing of hand rails at Landing slab and MS Ladder providing locking arrangements with two coats of approved enamel paint over one coat of red oxide paint as per approved Type Design and as directed by TWAD board officers.

1

-

-

... More
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete cu

1

-

-

... More
Providing PVC ventilating arrangements mosquito proof nylon net with 110 mm PVC pipes and cowl and as directed by TWAD Board officers

1

-

-

... More
Providing cut stone slab in CM 1:3 and as directed by TWAD Board officers

1

-

-

... More
Providing manhole cover of size 1x1 0.60 X 0.60M in RCC 1: 1.5:3 with suitable reinforcement and 5O x 5O x 6mm MS angle fixed along edges and as directed by TWAD Board officers.

1

-

-

... More
Pipe connection to SR 65mm Ø GI pipes for over flow & 1xl

15

-

-

... More
65mm Ø GI pipes for over flow & 1xl

17

-

-

... More
50mm Ø GI pipes for scour pipe 1xl

11

-

-

... More
65mm Ø GI pipe for delivery 1x1 pipe

9

-

-

... More
90mm Ø PVC Threaded coupler

2

-

-

... More
65 mm Ø PVC threaded coupler

2

-

-

... More
65mm Ø GI Tee

5

-

-

... More
65mm Ø GI 900 Bend

9

-

-

... More
65mm Ø GI coupler

1

-

-

... More
65mm Ø GI union

1

-

-

... More
65mm Ø GI Elbow

1

-

-

... More
65mm Ø GM Gate valve

2

-

-

... More
50mm Ø GM gate valve

1

-

-

... More
Refilling the foundation with excavated earth including consolidation as directed by the TWAD Board officers. As per item l(a) + l(b) Less item 2,3 & 4A & 4B Total

29.75

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B

315.9

-

-

... More
Supply of 63mm PVC Pipes including cost and conveyance of all materials to site and all labour charges etc., completed.

780

-

-

... More
Labour charges for laying and joining 40mm HDPE Pipes including all labour charges for laying pipes in proper alingment and gradient including cost of solvent cement etc., complete.

780

-

-

... More
Refilling with excavated earth after laying of pipes including all labour charges Solvent cement etc., complete.

313.47

-

-

... More
Name board

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.