Rural Development And Panchayat Raj Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date15 May 2024
Closing Date22 Jul 2024
Tender Amount₹ 3,15,69,000 
Notes
Download

Costs

Summary

Karur District - Thogamalai Block - Pmgsy Iii (2023-2024) Batch I - Tn 07 178

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5

-

-

-

... More
Km 0/0-1/0

1143.6

-

-

... More
km 1/0-2/0

1138.41

-

-

... More
Km 2/0-3/0

1198.07

-

-

... More
Km 3/0-4/0

1161.81

-

-

... More
Km 4/0-4/260

293.54

-

-

... More
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel Shoulder)

-

-

-

... More
Km 0/0-1/0

554.07

-

-

... More
km 1/0-2/0

538.82

-

-

... More
Km 2/0-3/0

560.87

-

-

... More
Km 3/0-4/0

559.24

-

-

... More
Km 4/0-4/260

146.25

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 (WMM).

-

-

-

... More
Km 0/0-1/0

485.22

-

-

... More
km 1/0-2/0

455.06

-

-

... More
Km 2/0-3/0

469.69

-

-

... More
Km 3/0-4/0

490.63

-

-

... More
Km 4/0-4/260

136

-

-

... More
Providing and laying Bituminous Macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504.

-

-

-

... More
Km 0/0-1/0

194.09

-

-

... More
km 1/0-2/0

182.02

-

-

... More
Km 2/0-3/0

187.88

-

-

... More
Km 3/0-4/0

196.26

-

-

... More
Km 4/0-4/260

54.41

-

-

... More
Providing and applying Prime Coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. (i) Low Porosity

-

-

-

... More
Km 0/0-1/0

3881.71

-

-

... More
km 1/0-2/0

3640.44

-

-

... More
Km 2/0-3/0

3757.48

-

-

... More
Km 3/0-4/0

3925.04

-

-

... More
Km 4/0-4/260

1087.98

-

-

... More
Providing and applying Tack Coat with Bitumen Emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared Granular surface treated with Primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 (ii).

-

-

-

... More
Km 0/0-1/0

3937.97

-

-

... More
km 1/0-2/0

3685.82

-

-

... More
Km 2/0-3/0

3768.36

-

-

... More
Km 3/0-4/0

3946.8

-

-

... More
Km 4/0-4/260

1087.98

-

-

... More
Providing, laying and rolling of Close-Graded Premix Surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 MSS (Using Waste Plastic).

-

-

-

... More
Km 0/0-1/0

3937.97

-

-

... More
km 1/0-2/0

3685.82

-

-

... More
Km 2/0-3/0

3768.36

-

-

... More
Km 3/0-4/0

3946.8

-

-

... More
Km 4/0-4/260

1087.98

-

-

... More
Construction of 1.5 m SPAN RCC Slab culvert at Ch 675, 873, 1270, 1953, 2182, 3360 in the road from MKS Road to Poongodipatty Via Naganottakkaranpatty

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Removal of Pipes in culvert at : 675, 873, 1270, 1953, 2182, 3360

45

-

-

... More
Removal of Body wall in culvert at : 675, 873, 1270, 1953, 2182, 3360

6.96

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
1.5m Culvert @ Ch. 675, 873,

105.96

-

-

... More
1.5mCulvert @ Ch. 1270, 1953,

105.96

-

-

... More
1.5mCulvert @ Ch. 2182,

52.98

-

-

... More
1.5mCulvert @ Ch. 3360,

52.98

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
1.5m Culvert @ Ch. 675, 873,

12.72

-

-

... More
1.5mCulvert @ Ch. 1270, 1953,

12.72

-

-

... More
1.5mCulvert @ Ch. 2182,

6.36

-

-

... More
1.5mCulvert @ Ch. 3360,

6.36

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Culvert @ Ch. 675, 873,

16.96

-

-

... More
1.5mCulvert @ Ch. 1270, 1953,

16.96

-

-

... More
1.5mCulvert @ Ch. 2182,

8.48

-

-

... More
1.5mCulvert @ Ch. 3360,

8.48

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works

-

-

-

... More
1.5m Culvert @ Ch. 675, 873,

58.6

-

-

... More
1.5mCulvert @ Ch. 1270, 1953,

58.6

-

-

... More
1.5mCulvert @ Ch. 2182,

29.3

-

-

... More
1.5mCulvert @ Ch. 3360,

29.3

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For STEM as 10% Rate for Centering Works

-

-

-

... More
1.5m Culvert @ Ch. 675, 873,

52.58

-

-

... More
1.5mCulvert @ Ch. 1270, 1953,

52.58

-

-

... More
1.5mCulvert @ Ch. 2182,

26.29

-

-

... More
1.5mCulvert @ Ch. 3360,

26.29

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Culvert @ Ch. 675, 873,

6.72

-

-

... More
1.5mCulvert @ Ch. 1270, 1953,

6.72

-

-

... More
1.5mCulvert @ Ch. 2182,

3.36

-

-

... More
1.5mCulvert @ Ch. 3360,

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

-

-

-

... More
1.5m Culvert @ Ch. 675, 873,

6.62

-

-

... More
1.5mCulvert @ Ch. 1270, 1953,

6.62

-

-

... More
1.5mCulvert @ Ch. 2182,

3.31

-

-

... More
1.5mCulvert @ Ch. 3360,

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
1.5m Culvert @ Ch. 675, 873,

0.7

-

-

... More
1.5mCulvert @ Ch. 1270, 1953,

0.7

-

-

... More
1.5mCulvert @ Ch. 2182,

0.35

-

-

... More
1.5mCulvert @ Ch. 3360,

0.35

-

-

... More
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

-

-

-

... More
1.5m Culvert @ Ch. 675, 873,

30

-

-

... More
1.5mCulvert @ Ch. 1270, 1953,

30

-

-

... More
1.5mCulvert @ Ch. 2182,

15

-

-

... More
1.5mCulvert @ Ch. 3360,

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
1.5m Culvert @ Ch. 675, 873,

9

-

-

... More
1.5mCulvert @ Ch. 1270, 1953,

9

-

-

... More
1.5mCulvert @ Ch. 2182,

4.5

-

-

... More
1.5mCulvert @ Ch. 3360,

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
1.5m Culvert @ Ch. 675, 873,

24

-

-

... More
1.5mCulvert @ Ch. 1270, 1953,

24

-

-

... More
1.5mCulvert @ Ch. 2182,

12

-

-

... More
1.5mCulvert @ Ch. 3360,

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
1.5m Culvert @ Ch. 675, 873,

18.5

-

-

... More
1.5mCulvert @ Ch. 1270, 1953,

18.5

-

-

... More
1.5mCulvert @ Ch. 2182,

9.25

-

-

... More
1.5mCulvert @ Ch. 3360,

9.25

-

-

... More
Construction of 1.5 m SPAN RCC Slab culvert at Ch 800, 1380 in the road from MKS Road to Poongodipatty Via Naganottakkaranpatty

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Removal of Deck, Abutment & Wings in culvert at : 800 & 1380

19.58

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
1.5m Culvert @ Ch. 800,

54.07

-

-

... More
1.5mCulvert @ Ch. 1380,

54.07

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
1.5m Culvert @ Ch. 800,

6.49

-

-

... More
1.5mCulvert @ Ch. 1380,

6.49

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Culvert @ Ch. 800,

8.65

-

-

... More
1.5mCulvert @ Ch. 1380,

8.65

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works

-

-

-

... More
1.5m Culvert @ Ch. 800,

30.11

-

-

... More
1.5mCulvert @ Ch. 1380,

30.11

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For STEM as 10% Rate for Centering Works

-

-

-

... More
1.5m Culvert @ Ch. 800,

29.83

-

-

... More
1.5mCulvert @ Ch. 1380,

29.83

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
1.5m Culvert @ Ch. 800,

3.36

-

-

... More
1.5mCulvert @ Ch. 1380,

3.36

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

-

-

-

... More
1.5m Culvert @ Ch. 800,

3.31

-

-

... More
1.5mCulvert @ Ch. 1380,

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
1.5m Culvert @ Ch. 800,

0.35

-

-

... More
1.5mCulvert @ Ch. 1380,

0.35

-

-

... More
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

-

-

-

... More
1.5m Culvert @ Ch. 800,

15

-

-

... More
1.5mCulvert @ Ch. 1380,

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
1.5m Culvert @ Ch. 800,

4.5

-

-

... More
1.5mCulvert @ Ch. 1380,

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
1.5m Culvert @ Ch. 800,

12

-

-

... More
1.5mCulvert @ Ch. 1380,

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
1.5m Culvert @ Ch. 800,

9.25

-

-

... More
1.5mCulvert @ Ch. 1380,

9.25

-

-

... More
Construction of 2.0 m SPAN RCC Slab culvert at Ch 20, 1031 in the road from MKS Road to Poongodipatty Via Naganottakkaranpatty

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Removal of Pipes in culvert at : 20 & 1031

15

-

-

... More
Removal of Body wall at : 20 & 1031

2.32

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

-

-

-

... More
2.0 m Culvert @ Ch. 20

54.27

-

-

... More
2.0 mCulvert @ Ch. 1031

54.27

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
2.0 m Culvert @ Ch. 20

6.51

-

-

... More
2.0 mCulvert @ Ch. 1031

6.51

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
2.0 m Culvert @ Ch. 20

8.69

-

-

... More
2.0 mCulvert @ Ch. 1031

8.69

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works

-

-

-

... More
2.0 m Culvert @ Ch. 20

30.25

-

-

... More
2.0 mCulvert @ Ch. 1031

30.25

-

-

... More
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For STEM as 10% Rate for Centering Works

-

-

-

... More
2.0 m Culvert @ Ch. 20

31.3

-

-

... More
2.0 mCulvert @ Ch. 1031

31.3

-

-

... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
2.0 m Culvert @ Ch. 20

3.54

-

-

... More
2.0 mCulvert @ Ch. 1031

3.54

-

-

... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

-

-

-

... More
2.0 m Culvert @ Ch. 20

4.68

-

-

... More
2.0 mCulvert @ Ch. 1031

4.68

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
2.0 m Culvert @ Ch. 20

0.48

-

-

... More
2.0 mCulvert @ Ch. 1031

0.48

-

-

... More
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

-

-

-

... More
2.0 m Culvert @ Ch. 20

15

-

-

... More
2.0 mCulvert @ Ch. 1031

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
2.0 m Culvert @ Ch. 20

4.5

-

-

... More
2.0 mCulvert @ Ch. 1031

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
2.0 m Culvert @ Ch. 20

12

-

-

... More
2.0 mCulvert @ Ch. 1031

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
2.0 m Culvert @ Ch. 20

9.25

-

-

... More
2.0 mCulvert @ Ch. 1031

9.25

-

-

... More
Provision of Rumble Strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.

-

-

-

... More
Km 0/0-1/0

1.13

-

-

... More
km 1/0-2/0

2.25

-

-

... More
Km 2/0-3/0

0.56

-

-

... More
Km 3/0-4/0

5.06

-

-

... More
Km 4/0-4/260

2.81

-

-

... More
Provision for Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface

852

-

-

... More
Provision for Road Marker/ Road stud with lens Reflector

210

-

-

... More
Painting Name Board

1

-

-

... More
Painting PMGSY Logo Board board

4

-

-

... More
Painting Sign Board

42

-

-

... More
Chevron Sign Octogan Board (90cm)

2

-

-

... More
60 cm Circle(Mandatory Sign Board)

4

-

-

... More
Reflector - Traffic signs (Near culverts & trees) - Star sign Sticker

48

-

-

... More
Citizen Information Board

1

-

-

... More
Maintenance Board

1

-

-

... More
Km Stone

4

-

-

... More
HM Stone

18

-

-

... More
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2

-

-

-

... More
For 1st Year

4.26

-

-

... More
For 2nd Year

4.26

-

-

... More
For 3rd Year

4.26

-

-

... More
For 4th Year

4.26

-

-

... More
For 5th Year

4.26

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.