Rural Development And Panchayat Raj Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Civil And Construction
Road Construction
Eprocure
Opening Date1 May 2023
Closing Date23 May 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Picking Charges for 5 cm to 10 cm old metalled and B.T. surface and sectioning including cost and conveyance and all labour charges etc.

-

-

-

... More
Km 0/0-0/710

710

-

-

... More
Earth work excavation and deposition of bank in all classes of soils such as hard stiff clay, hard black cotton soil, hard red earth, hard murrum, etc., as per SS 20A including all labour charges etc., for widening side Berms

-

-

-

... More
Km 0/0-0/710

255.6

-

-

... More
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction

-

-

-

... More
Km 0/0-0/710

85.2

-

-

... More
Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm)IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)

-

-

-

... More
Km 0/0-0/710

160.43

-

-

... More
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm

-

-

-

... More
Km 0/0-0/710

160.43

-

-

... More
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.

-

-

-

... More
Km 0/0-0/710

2139

-

-

... More
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.

-

-

-

... More
Km 0/0-0/710

2139

-

-

... More
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 13.432Kg of bitumen and 1.168 Kg of Plastic waste for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended using waste plastic

-

-

-

... More
Km 0/0-0/710

2139

-

-

... More
Construction of Toe wall @ 0/050-0/110m

-

-

-

... More
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.B

-

-

-

... More
Toe wall @ 0/050-0/110m

24.3

-

-

... More
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.

-

-

-

... More
Toe wall @ 0/050-0/110m

5.4

-

-

... More
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation

-

-

-

... More
Toe wall @ 0/050-0/110m

5.4

-

-

... More
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete

110.84

-

-

... More
CC1:3:6 mix using 40 mm ISS HBG metal including cost and conveyance and all lanour charges etc complete

31.05

-

-

... More
Construction of Retaining wall @ 0/480-0/500m

-

-

-

... More
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.B

-

-

-

... More
Retaining wall @ 0/480-0/500m

19.2

-

-

... More
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.

-

-

-

... More
Retaining wall @ 0/480-0/500m

2.4

-

-

... More
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation

-

-

-

... More
Retaining wall @ 0/480-0/500m

3.6

-

-

... More
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete

71.73

-

-

... More
CC1:3:6 mix using 40 mm ISS HBG metal including cost and conveyance and all lanour charges etc complete

18.45

-

-

... More
Road Marking with Hot Applied Thermo plastic Compound with Reflectorising Glass beads on Bituminous Surface

142

-

-

... More
Providing and fixing of HM stones for standard specification

4

-

-

... More
Providing and fixing of Sign board for standard specification

2

-

-

... More
Providing and fixing of Information board for standard specification

1

-

-

... More
Part II :Strengthening the road from Gangaikondan to Kollanur Road Km 0/0-1-202

-

-

-

... More
Clearing the Scrub jungle including all labour charges for burrying and burning etc.,

-

-

-

... More
Km 0/0-1-202

1099.2

-

-

... More
Picking Charges for 5 cm to 10 cm old metalled and B.T. surface and sectioning including cost and conveyance and all labour charges etc.

-

-

-

... More
Km 0/0-1-202

787.57

-

-

... More
Earth work excavation and deposition of bank in all classes of soils such as hard stiff clay, hard black cotton soil, hard red earth, hard murrum, etc., as per SS 20A including all labour charges etc., for widening side Berms

-

-

-

... More
Km 0/0-1-202

226.8

-

-

... More
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction

-

-

-

... More
Km 0/0-1/0

51.36

-

-

... More
Km 1/0-1/202

24.24

-

-

... More
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .

-

-

-

... More
Km 0/0-1/0

75

-

-

... More
Km 1/0-1/202

75.75

-

-

... More
Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm)IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)

-

-

-

... More
Km 0/0-1/0

130.73

-

-

... More
Km 1/0-1/202

56.81

-

-

... More
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm

-

-

-

... More
Km 0/0-1/0

130.73

-

-

... More
Km 1/0-0/202

56.81

-

-

... More
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.

-

-

-

... More
Km 0/0-1/202

2389.5

-

-

... More
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.

-

-

-

... More
Km 0/0-1/202

2389.5

-

-

... More
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 13.432Kg of bitumen and 1.168 Kg of Plastic waste for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department using waste plastic

-

-

-

... More
Km 0/0-1/0

1632

-

-

... More
Km 1/0-1/202

757.5

-

-

... More
Road Marking with Hot Applied Thermo plastic Compound with Reflectorising Glass beads on Bituminous Surface

-

-

-

... More
Km 0/0-1/202

183.2

-

-

... More
Providing and fixing of KM stones for standard specification

1

-

-

... More
Providing and fixing of HM stones for standard specification

5

-

-

... More
Providing and fixing of Sign board for standard specification

3

-

-

... More
Providing and fixing of Name board for standard specification

1

-

-

... More
Part III :Strengthening the road from Ariyankottai - Kavanur Road to Kulathur Road km 0/0-1/190

-

-

-

... More
Clearing the Scrub jungle including all labour charges for burrying and burning etc.,

-

-

-

... More
km 0/0-1/190

1428

-

-

... More
Picking Charges for 5 cm to 10 cm old metalled and B.T. surface and sectioning including cost and conveyance and all labour charges etc.

-

-

-

... More
km 0/0-1/190

1483.87

-

-

... More
Earth work excavation and deposition of bank in all classes of soils such as hard stiff clay, hard black cotton soil, hard red earth, hard murrum, etc., as per SS 20A including all labour charges etc., for widening side Berms

-

-

-

... More
km 0/0-1/190

534.2

-

-

... More
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction

-

-

-

... More
Km 0/0-1/0

120

-

-

... More
Km 1/0-1/190

22.45

-

-

... More
Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm)IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)

-

-

-

... More
Km 0/0-1/0

281.25

-

-

... More
Km 1/0-1/190

53.3

-

-

... More
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm

-

-

-

... More
Km 0/0-1/0

281.25

-

-

... More
Km 1/0-0/190

53.3

-

-

... More
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.

-

-

-

... More
Km 0/0-1/0

3750

-

-

... More
Km 1/0-0/190

710.63

-

-

... More
Providing and Laying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.

-

-

-

... More
Km 0/0-1/0

3750

-

-

... More
Km 1/0-0/190

721.5

-

-

... More
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
Km 0/0-1/0

93.75

-

-

... More
Km 1/0-1/190

18.04

-

-

... More
Road Marking with Hot Applied Thermo plastic Compound with Reflectorising Glass beads on Bituminous Surface

-

-

-

... More
Km 0/0-1/190

238

-

-

... More
Providing and fixing of KM stones for standard specification

1

-

-

... More
Providing and fixing of HM stones for standard specification

5

-

-

... More
Providing and fixing of Sign board for standard specification

2

-

-

... More
Providing and fixing of Name board for standard specification

1

-

-

... More
Maitanance Part I :Strengthening the road from Devipattinam - Nainarkovil road to Keerampatti Road km 0/0-0-710

-

-

-

... More
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost

-

-

-

... More
For the First Year from the date of completion of work

0.71

-

-

... More
For the Second Year from the date of completion of work

0.71

-

-

... More
For the Third Year from the date of completion of work

0.71

-

-

... More
For the Fourth Year from the date of completion of work

0.71

-

-

... More
For the Fifth Year from the date of completion of work

0.71

-

-

... More
Maintanance Part II:Strengthening the road from Gangaikondan to Kollanur Road Km 0/0-1-202

-

-

-

... More
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost

-

-

-

... More
For the First Year from the date of completion of work

0.63

-

-

... More
For the Second Year from the date of completion of work

0.63

-

-

... More
For the Third Year from the date of completion of work

0.63

-

-

... More
For the Fourth Year from the date of completion of work

0.63

-

-

... More
For the Fifth Year from the date of completion of work

0.63

-

-

... More
Maintanance Part III:Strengthening the road from Ariyankottai - Kavanur Road to Kulathur Road km 0/0-1/190

-

-

-

... More
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost

-

-

-

... More
For the First Year from the date of completion of work

1.19

-

-

... More
For the Second Year from the date of completion of work

1.19

-

-

... More
For the Third Year from the date of completion of work

1.19

-

-

... More
For the Fourth Year from the date of completion of work

1.19

-

-

... More
For the Fifth Year from the date of completion of work

1.19

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.