Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Road Construction
Eprocure
Opening Date1 May 2023
Closing Date23 May 2023
Tender AmountRefer Documents
Costs
EMD
₹ 1,58,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_RDTN_308346_31Bid Award Id
ViewTender No
ROC.No.R6/1332/2023Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://https://www.tnrd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Km 0/0-0/600
720
-
-
... More
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte.
-
-
-
... More
Km 0/0-0/600
240
-
-
... More
Picking Charges for 5 cm to 10 cm old metalled and B.T. surface and sectioning including cost and conveyance and all labour charges etc.
-
-
-
... More
Km 0/0-0/600
1500
-
-
... More
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
-
-
-
... More
Km 0/0-0/600
108
-
-
... More
Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm)IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
-
-
-
... More
Km 0/0-0/600
172.89
-
-
... More
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
-
-
-
... More
Km 0/0-0/600
172.89
-
-
... More
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
-
-
-
... More
Km 0/0-0/600
2305.25
-
-
... More
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
-
-
-
... More
Km 0/0-0/600
2305.25
-
-
... More
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 23.232Kg of bitumen and 1.168 Kg of (Plastic waste) for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
-
-
-
... More
Km 0/0-0/600
2305.25
-
-
... More
Toe Wall
-
-
-
... More
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
232.2
-
-
... More
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
58.05
-
-
... More
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
58.05
-
-
... More
Cement Concrete 1:3:6mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
232.2
-
-
... More
Centring and shuttering for sides and soffits including strutting etc complete
774
-
-
... More
Road marking with Hot Applied Thermopalstic compound with reflectorising Glass beads on Bituminous surface
120
-
-
... More
Hecta metre stone
3
-
-
... More
Providing and fixing of Name board for standard specification
1
-
-
... More
Providing and fixing of sign board 60 cm Equilateral triangle
3
-
-
... More
b. 60 cm Circle(MANDATORY SIGN)
1
-
-
... More
Road Marker/ Road stud with lens Reflector
1
-
-
... More
Part II: STRENGTHENING the road from Mudukulathur - Abiramam to Keeranoor road in Keeranoor Panchayat KM 0/0-1/765
-
-
-
... More
Clearing the Scrub jungle including all labour charges for burrying and burning etc.,
-
-
-
... More
Km 0/0-1/765
2118
-
-
... More
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte.
-
-
-
... More
Km 0/0-1/765
1053.78
-
-
... More
Picking Charges for 5 cm to 10 cm old metalled and B.T. surface and sectioning including cost and conveyance and all labour charges etc.
-
-
-
... More
Km 0/0-1/765
2184.19
-
-
... More
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
-
-
-
... More
Km 0/0-1/0
267.65
-
-
... More
Km 1/0-1/765
206.55
-
-
... More
Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm)IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
-
-
-
... More
Km 0/0-1/0
278.7
-
-
... More
Km 1/0-1/765
218.18
-
-
... More
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
-
-
-
... More
Km 0/0-1/0
278.7
-
-
... More
Km 1/0-1/765
218.18
-
-
... More
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
-
-
-
... More
Km 0/0-1/0
3716
-
-
... More
Km 1/0-1/765
2909
-
-
... More
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
-
-
-
... More
Km 0/0-1/765
6690.25
-
-
... More
BC 25mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 25mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as
per clause 507 of MORTH Rev-5 Part-5
-
-
-
... More
Km 0/0-1/0
94.53
-
-
... More
Km 1/0-1/765
72.73
-
-
... More
Construction of 1.5m span culvert @ ch 10 m
-
-
-
... More
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.B
94.57
-
-
... More
Supply and filing foundation and basement with filling sand in layers not more than 15cm. Thick well ramed, watered and compacted complete complying with standard specifications and as directed.
7.88
-
-
... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
7.88
-
-
... More
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.
73.76
-
-
... More
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.
112.89
-
-
... More
Concrete concrete with (1:3:6)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
82.31
-
-
... More
Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete.
3.36
-
-
... More
Supplying and fabricating and placing inposition mild steel or Ribbed Tor steel for all reinforcedCement Concrete works as per the design given including cost of steel and binding wire in all floor etc., complete complying with std specification.
0.35
-
-
... More
Reinforced Cement Concrete 1:1 1/2:3 mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance of all materials to site for Deck Slab
3.31
-
-
... More
Provision for Abutment PVC Seepage Pipes
12
-
-
... More
Provision For Bitumen pad
3.15
-
-
... More
Provision For Kraft Paper
4.5
-
-
... More
Construction of 1.5m span culvert @ ch 570 m
-
-
-
... More
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.B
94.57
-
-
... More
Supply and filing foundation and basement with filling sand in layers not more than 15cm. Thick well ramed, watered and compacted complete complying with standard specifications and as directed.
7.88
-
-
... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
7.88
-
-
... More
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.
73.76
-
-
... More
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.
112.89
-
-
... More
Concrete concrete with (1:3:6)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
82.31
-
-
... More
Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete.
3.36
-
-
... More
Supplying and fabricating and placing inposition mild steel or Ribbed Tor steel for all reinforcedCement Concrete works as per the design given including cost of steel and binding wire in all floor etc., complete complying with std specification.
0.35
-
-
... More
Reinforced Cement Concrete 1:1 1/2:3 mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance of all materials to site for Deck Slab
3.31
-
-
... More
Provision for Abutment PVC Seepage Pipes
12
-
-
... More
Provision For Bitumen pad
3.15
-
-
... More
Provision For Kraft Paper
4.5
-
-
... More
Construction of 1.5m span culvert @ ch 760 m
-
-
-
... More
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.B
94.57
-
-
... More
Supply and filing foundation and basement with filling sand in layers not more than 15cm. Thick well ramed, watered and compacted complete complying with standard specifications and as directed.
7.88
-
-
... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
7.88
-
-
... More
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.
73.76
-
-
... More
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.
112.89
-
-
... More
Concrete concrete with (1:3:6)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
82.31
-
-
... More
Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete.
3.36
-
-
... More
Supplying and fabricating and placing inposition mild steel or Ribbed Tor steel for all reinforcedCement Concrete works as per the design given including cost of steel and binding wire in all floor etc., complete complying with std specification.
0.35
-
-
... More
Reinforced Cement Concrete 1:1 1/2:3 mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance of all materials to site for Deck Slab
3.31
-
-
... More
Provision for Abutment PVC Seepage Pipes
12
-
-
... More
Provision For Bitumen pad
3.15
-
-
... More
Provision For Kraft Paper
4.5
-
-
... More
Road marking with Hot Applied Thermopalstic compound with reflectorising Glass beads on Bituminous surface
353
-
-
... More
Kilometre stone
1
-
-
... More
Hecta metre stone
7
-
-
... More
Providing and fixing of Name board for standard specification
1
-
-
... More
Providing and fixing of sign board 60 cm Equilateral triangle
3
-
-
... More
b. 60 cm Circle(MANDATORY SIGN)
1
-
-
... More
Road Marker/ Road stud with lens Reflector
2
-
-
... More
Part I: STRENGTHENING the road from Thattankudiyiruppu to Puliankulam road in Sathanoor Panchayat KM 0/0-0/600
-
-
-
... More
Towards the charges for routline
maintenance of the road work executed
under MGSMT including dressing of berms
by refilling the gully with the earth from
borrow pits, cleaning of wild seasonal
growth on berms, destilting of side drains
and CD works, white washing guard stones,
painting of KM, HM stones, parapets,
cutting of branches of trees, refixing
displaced guard stones, caution boards,
speed limit boards etc., with the periodicity
for the above activities as prescribed in IRCSP-
20:2002 and as directed by the
departmental officers except for the
constructional defects which has to be
rectified by the contractor at his own cost
-
-
-
... More
For the First Year from the date of
completion of work
0.6
-
-
... More
For the Second Year from the date of
completion of work
0.6
-
-
... More
For the Third Year from the date of
completion of work
0.6
-
-
... More
For the Fourth Year from the date of
completion of work
0.6
-
-
... More
For the Fifth Year from the date of
completion of work
0.6
-
-
... More
Part II: STRENGTHENING the road from Mudukulathur - Abiramam to Keeranoor road in Keeranoor Panchayat KM 0/0-1/765
-
-
-
... More
Towards the charges for routline
maintenance of the road work executed
under MGSMT including dressing of berms
by refilling the gully with the earth from
borrow pits, cleaning of wild seasonal
growth on berms, destilting of side drains
and CD works, white washing guard stones,
painting of KM, HM stones, parapets,
cutting of branches of trees, refixing
displaced guard stones, caution boards,
speed limit boards etc., with the periodicity
for the above activities as prescribed in IRCSP-
20:2002 and as directed by the
departmental officers except for the
constructional defects which has to be
rectified by the contractor at his own cost
-
-
-
... More
For the First Year from the date of
completion of work
1.77
-
-
... More
For the Second Year from the date of
completion of work
1.77
-
-
... More
For the Third Year from the date of
completion of work
1.77
-
-
... More
For the Fourth Year from the date of
completion of work
1.77
-
-
... More
For the Fifth Year from the date of
completion of work
1.77
-
-
... More
GST
-
-
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements