Rural Development And Panchayat Raj Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - PMGSY Tender

Environmental Service
Eprocure
Opening Date4 Jul 2022
Closing Date18 Jul 2022
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Drilling of 150mm dia vertical borewell in hard rock area as per the recommendation of hydrogeolegist including the rig transportation inserting of casing pipe and flushing etc.,complete

183

-

-

... More
Supply and fixing of 180 mm dia PVC casing pipe (PVC) with ISI mark including all charges etc.,complete

12

-

-

... More
Three Phase Submersible Pumpset Suitable for 150mm dia borewell with ISI Mark with Panel board having Duty of 50Lpmx 175m -5.00 Hp

1

-

-

... More
Pvc insulated and sheathed 3 Core Flat type 4.00 Sq .mm Submersible copper cable with ISI Mark

184

-

-

... More
40mm dia GI pipe

162

-

-

... More
40mm GI Coupling

27

-

-

... More
40 mm dia G.I Union

1

-

-

... More
40mm G.I Elbow

3

-

-

... More
50 mm dia Non-return valve

1

-

-

... More
40mm G.I Hex Nipple

2

-

-

... More
40mm MS Clampset

2

-

-

... More
Borewell cover PVC

1

-

-

... More
25mm dia PVC pipe (Super thick) for Cable encansing

12

-

-

... More
63mm PVC 4 kg/sqcm Pipe

68

-

-

... More
2000 Lit HDPE tank

1

-

-

... More
Labour charges for erection of 7.50 HP Submersible pumpset into the Borewell with GI Raiser pipes, cables with proper clamping,valves fixing,cable jointing and wiring from EB pole to Kiosk fixing of main switch Panel board etc Complete and testing the pumpset and trail run for 10 days

1

-

-

... More
Providing of EB service main arrangement from EB post to pump room and fitting service pipe EB board wiring complete including 7/20 PVC overhead wiring main,fuse unit, GI wire and all materials fixing complete.

1

-

-

... More
Construction of pump room masonry work including all labour and all material charges

1

-

-

... More
Construction of sintex tank pedestal arrangements including cost and conveyance of all materials and all labour charges

1

-

-

... More
Providing bore well pit protection arrangements in Brick work and using CC 1:2:4 including all materials and all labour charges

1

-

-

... More
Earth work excavation hard stiff clay and hard rock earth and pipe laying, Jointing and refilling the trench with excavation soils including all labour charges etc.,complete

-

-

-

... More
63mm PVC 4 kg/sqcm Pipe

68

-

-

... More
cable line

12

-

-

... More
Provision for fencing arrangements

-

-

-

... More
Providing and erection of 50mm GI pipe with cement concrete foundation at 65 cm c/c for fencing including painting charges, etc, complete.

400

-

-

... More
Provision for Green net allround miyawaki including all charges materials to site and all labour charges etc

400

-

-

... More
Provision for name board

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-

... More
2. Providing Water supply and fencing for Miyawaki plantation at Indiracolony at H/O Kudagipatti Estimate Amount Rs. 5.01 lakhs

-

-

-

... More
Towards the cost of Providing Geophysical investigation survey including all charges etc.,complete

1

-

-

... More
Drilling of 180 mm Dia Vertical Borewell in Overburden soil including labour charges for insertion of casing pipe including all charges etc.,complete

12

-

-

... More
Drilling of 150mm dia vertical borewell in hard rock area as per the recommendation of hydrogeolegist including the rig transportation inserting of casing pipe and flushing etc.,complete

183

-

-

... More
Supply and fixing of 180 mm dia PVC casing pipe (PVC) with ISI mark including all charges etc.,complete

12

-

-

... More
Three Phase Submersible Pumpset Suitable for 150mm dia borewell with ISI Mark with Panel board having Duty of 50Lpmx 175m -5.00 Hp

1

-

-

... More
Pvc insulated and sheathed 3 Core Flat type 4.00 Sq .mm Submersible copper cable with ISI Mark

184

-

-

... More
40mm dia GI pipe

162

-

-

... More
40mm GI Coupling

27

-

-

... More
40 mm dia G.I Union

1

-

-

... More
40mm G.I Elbow

3

-

-

... More
50 mm dia Non-return valve

1

-

-

... More
40mm G.I Hex Nipple

2

-

-

... More
40mm MS Clampset

2

-

-

... More
Borewell cover PVC

1

-

-

... More
25mm dia PVC pipe (Super thick) for Cable encansing

12

-

-

... More
63mm PVC 4 kg/sqcm Pipe

68

-

-

... More
2000 Lit HDPE tank

1

-

-

... More
Labour charges for erection of 7.50 HP Submersible pumpset into the Borewell with GI Raiser pipes, cables with proper clamping,valves fixing,cable jointing and wiring from EB pole to Kiosk fixing of main switch Panel board etc Complete and testing the pumpset and trail run for 10 days

1

-

-

... More
Providing of EB service main arrangement from EB post to pump room and fitting service pipe EB board wiring complete including 7/20 PVC overhead wiring main,fuse unit, GI wire and all materials fixing complete.

1

-

-

... More
Construction of pump room masonry work including all labour and all material charges

1

-

-

... More
Construction of sintex tank pedestal arrangements including cost and conveyance of all materials and all labour charges

1

-

-

... More
Providing bore well pit protection arrangements in Brick work and using CC 1:2:4 including all materials and all labour charges

1

-

-

... More
Earth work excavation hard stiff clay and hard rock earth and pipe laying, Jointing and refilling the trench with excavation soils including all labour charges etc.,complete

-

-

-

... More
63mm PVC 4 kg/sqcm Pipe

68

-

-

... More
cable line

12

-

-

... More
Provision for fencing arrangements

-

-

-

... More
Providing and erection of 50mm GI pipe with cement concrete foundation at 65 cm c/c for fencing including painting charges, etc, complete.

320

-

-

... More
Provision for Green net allround miyawaki including all charges materials to site and all labour charges etc

320

-

-

... More
Provision for Name board

11

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-

... More
3.Water supply and fencing for new miyawaki plantation at valaikinaru at Kottaipatti H/O Pillaiyarnatham Estimate Amount Rs. 5.24lakhs

-

-

-

... More
Towards the cost of Providing Geophysical investigation survey including all charges etc.,complete

1

-

-

... More
Drilling of 180 mm Dia Vertical Borewell in Overburden soil including labour charges for insertion of casing pipe including all charges etc.,complete

12

-

-

... More
Drilling of 150mm dia vertical borewell in hard rock area as per the recommendation of hydrogeolegist including the rig transportation inserting of casing pipe and flushing etc.,complete

183

-

-

... More
Supply and fixing of 180 mm dia PVC casing pipe (PVC) with ISI mark including all charges etc.,complete

12

-

-

... More
Three Phase Submersible Pumpset Suitable for 150mm dia borewell with ISI Mark with Panel board having Duty of 50Lpmx 175m -5.00 Hp

1

-

-

... More
Pvc insulated and sheathed 3 Core Flat type 4.00 Sq .mm Submersible copper cable with ISI Mark

184

-

-

... More
40mm dia GI pipe

162

-

-

... More
40mm GI Coupling

27

-

-

... More
40 mm dia G.I Union

1

-

-

... More
40mm G.I Elbow

3

-

-

... More
50 mm dia Non-return valve

1

-

-

... More
40mm G.I Hex Nipple

2

-

-

... More
40mm MS Clampset

2

-

-

... More
Borewell cover PVC

1

-

-

... More
25mm dia PVC pipe (Super thick) for Cable encansing

12

-

-

... More
63mm PVC 4 kg/sqcm Pipe

90

-

-

... More
2000 Lit HDPE tank

1

-

-

... More
Labour charges for erection of 7.50 HP Submersible pumpset into the Borewell with GI Raiser pipes, cables with proper clamping,valves fixing,cable jointing and wiring from EB pole to Kiosk fixing of main switch Panel board etc Complete and testing the pumpset and trail run for 10 days

1

-

-

... More
Providing of EB service main arrangement from EB post to pump room and fitting service pipe EB board wiring complete including 7/20 PVC overhead wiring main,fuse unit, GI wire and all materials fixing complete.

1

-

-

... More
Construction of pump room masonry work including all labour and all material charges

1

-

-

... More
Construction of sintex tank pedestal arrangements including cost and conveyance of all materials and all labour charges

1

-

-

... More
Providing bore well pit protection arrangements in Brick work and using CC 1:2:4 including all materials and all labour charges

1

-

-

... More
Earth work excavation hard stiff clay and hard rock earth and pipe laying, Jointing and refilling the trench with excavation soils including all labour charges etc.,complete

-

-

-

... More
63mm PVC 4 kg/sqcm Pipe

90

-

-

... More
cable line

12

-

-

... More
Provision for fencing arrangements

-

-

-

... More
Providing and erection of 50mm GI pipe with cement concrete foundation at 65 cm c/c for fencing including painting charges, etc, complete.

360

-

-

... More
Provision for Green net allround miyawaki including all charges materials to site and all labour charges etc

360

-

-

... More
Provision for name board

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-

... More
4.Construction of drainage (80m) with Vertical Soak Pit from Veerasamy house to Bridge at Kottaipatti Estimate Amount Rs.4.15 lakhs

-

-

-

... More
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B

44

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.

8

-

-

... More
Supply and errecting centering charges for Plain surface including cost & conveyance of all materials to site and all labour charges etc., complete.

144

-

-

... More
CC 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.

21.6

-

-

... More
Plastering with cement mortar 1:4 mix to 20mm thick including cost and conveyance of all materials & all labour charges etc., complete.

24

-

-

... More
Construction of Vertical community soak pit

-

-

-

... More
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B For Foundation

46.57

-

-

... More
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B For Drain Foundation

3.63

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.

1.32

-

-

... More
Supply and errecting centering charges for Plain surface including cost & conveyance of all materials to site and all labour charges etc., complete.

32.36

-

-

... More
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

2.57

-

-

... More
Brick work in c.m 1:5 mix using country bricks including cost & conveyance of all materials to site and all labour charges etc., complete.

0.98

-

-

... More
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials & all labour charges etc., complete.

6.02

-

-

... More
Cost and supply of 1m dia precast ring complete complying with standard specification.

5

-

-

... More
Cost and supply of 1m dia precast cover slab complete complying with standard specification.

1

-

-

... More
Cost and supply of 180m dia PVC Pipe

4.3

-

-

... More
Cost and supply of RCC precast slab fo Chamber complete complying with standard specification.

3

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

1.49

-

-

... More
Plastering with cement mortar 1:4 mix to 20mm thick including cost and conveyance of all materials & all labour charges etc., complete.

11

-

-

... More
 Filling the soak pit with 225mm metal as per specification

8.91

-

-

... More
 Filling the soak pit with 40mm metal as per specification

19.45

-

-

... More
 Filling the soak pit with 20mm metal as per specification

14.21

-

-

... More
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete

28.57

-

-

... More
Provision for Name board charges

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-

... More
5.Water supply and fencing arrangement for new miyawaki plantation at Malaivinayagampatti H/O Seithur Estimate Amount Rs.5.05 lakhs

-

-

-

... More
Towards the cost of Providing Geophysical investigation survey including all charges etc.,complete

1

-

-

... More
Drilling of 180 mm Dia Vertical Borewell in Overburden soil including labour charges for insertion of casing pipe including all charges etc.,complete

12

-

-

... More
Drilling of 150mm dia vertical borewell in hard rock area as per the recommendation of hydrogeolegist including the rig transportation inserting of casing pipe and flushing etc.,complete

183

-

-

... More
Supply and fixing of 180 mm dia PVC casing pipe (PVC) with ISI mark including all charges etc.,complete

12

-

-

... More
Three Phase Submersible Pumpset Suitable for 150mm dia borewell with ISI Mark with Panel board having Duty of 50Lpmx 175m -5.00 Hp

1

-

-

... More
Pvc insulated and sheathed 3 Core Flat type 4.00 Sq .mm Submersible copper cable with ISI Mark

184

-

-

... More
40mm dia GI pipe

162

-

-

... More
40mm GI Coupling

27

-

-

... More
40 mm dia G.I Union

1

-

-

... More
40mm G.I Elbow

3

-

-

... More
50 mm dia Non-return valve

1

-

-

... More
40mm G.I Hex Nipple

2

-

-

... More
40mm MS Clampset

2

-

-

... More
Borewell cover PVC

1

-

-

... More
25mm dia PVC pipe (Super thick) for Cable encansing

12

-

-

... More
63mm PVC 4 kg/sqcm Pipe

82

-

-

... More
2000 Lit HDPE tank

1

-

-

... More
Labour charges for erection of 7.50 HP Submersible pumpset into the Borewell with GI Raiser pipes, cables with proper clamping,valves fixing,cable jointing and wiring from EB pole to Kiosk fixing of main switch Panel board etc Complete and testing the pumpset and trail run for 10 days

1

-

-

... More
Providing of EB service main arrangement from EB post to pump room and fitting service pipe EB board wiring complete including 7/20 PVC overhead wiring main,fuse unit, GI wire and all materials fixing complete.

1

-

-

... More
Construction of pump room masonry work including all labour and all material charges

1

-

-

... More
Construction of sintex tank pedestal arrangements including cost and conveyance of all materials and all labour charges

1

-

-

... More
Providing bore well pit protection arrangements in Brick work and using CC 1:2:4 including all materials and all labour charges

1

-

-

... More
Earth work excavation hard stiff clay and hard rock earth and pipe laying, Jointing and refilling the trench with excavation soils including all labour charges etc.,complete

-

-

-

... More
63mm PVC 4 kg/sqcm Pipe

82

-

-

... More
cable line

12

-

-

... More
Provision for fencing arrangements

-

-

-

... More
Providing and erection of 50mm GI pipe with cement concrete foundation at 65 cm c/c for fencing including painting charges, etc, complete.

320

-

-

... More
Provision for Green net allround miyawaki including all charges materials to site and all labour charges etc

320

-

-

... More
Provision for name board

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-

... More
6. Construction of Drainage (35m) with Vertical soak pit near Transformer at P.Aravangurichi Estimate Amount Rs.2.34 lakhs

-

-

-

... More
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B

15.75

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.

3.5

-

-

... More
Supply and errecting centering charges for Plain surface including cost & conveyance of all materials to site and all labour charges etc., complete.

63

-

-

... More
CC 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.

7.25

-

-

... More
Plastering with cement mortar 1:4 mix to 20mm thick including cost and conveyance of all materials & all labour charges etc., complete.

14

-

-

... More
Construction of Vertical community soak pit

-

-

-

... More
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B For Foundation

46.57

-

-

... More
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B For Drain Foundation

0.64

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.

0.87

-

-

... More
Supply and errecting centering charges for Plain surface including cost & conveyance of all materials to site and all labour charges etc., complete.

24.06

-

-

... More
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

2.57

-

-

... More
Brick work in c.m 1:5 mix using country bricks including cost & conveyance of all materials to site and all labour charges etc., complete.

0.98

-

-

... More
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials & all labour charges etc., complete.

6.02

-

-

... More
Cost and supply of 1m dia precast ring complete complying with standard specification.

5

-

-

... More
Cost and supply of 1m dia precast cover slab complete complying with standard specification.

1

-

-

... More
Cost and supply of 180m dia PVC Pipe

4.3

-

-

... More
Cost and supply of RCC precast slab fo Chamber complete complying with standard specification.

3

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

0.41

-

-

... More
Plastering with cement mortar 1:4 mix to 20mm thick including cost and conveyance of all materials & all labour charges etc., complete.

9.42

-

-

... More
 Filling the soak pit with 225mm metal as per specification

8.91

-

-

... More
 Filling the soak pit with 40mm metal as per specification

19.45

-

-

... More
 Filling the soak pit with 20mm metal as per specification

14.21

-

-

... More
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete

23.04

-

-

... More
Provision for Name board charges

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-

... More
7.Providing Water supply and fencing to the New Miyawaki at Sendurai, H/O Sendurai Estimate Amount Rs.5.55 lakhs

-

-

-

... More
Towards the cost of Providing Geophysical investigation survey including all charges etc.,complete

1

-

-

... More
Drilling of 180 mm Dia Vertical Borewell in Overburden soil including labour charges for insertion of casing pipe including all charges etc.,complete

12

-

-

... More
Drilling of 150mm dia vertical borewell in hard rock area as per the recommendation of hydrogeolegist including the rig transportation inserting of casing pipe and flushing etc.,complete

183

-

-

... More
Supply and fixing of 180 mm dia PVC casing pipe (PVC) with ISI mark including all charges etc.,complete

12

-

-

... More
Three Phase Submersible Pumpset Suitable for 150mm dia borewell with ISI Mark with Panel board having Duty of 50Lpmx 175m -5.00 Hp

1

-

-

... More
Pvc insulated and sheathed 3 Core Flat type 4.00 Sq .mm Submersible copper cable with ISI Mark

184

-

-

... More
40mm dia GI pipe

162

-

-

... More
40mm GI Coupling

27

-

-

... More
40 mm dia G.I Union

1

-

-

... More
40mm G.I Elbow

3

-

-

... More
50 mm dia Non-return valve

1

-

-

... More
40mm G.I Hex Nipple

2

-

-

... More
40mm MS Clampset

2

-

-

... More
Borewell cover PVC

1

-

-

... More
25mm dia PVC pipe (Super thick) for Cable encansing

12

-

-

... More
63mm PVC 4 kg/sqcm Pipe

82

-

-

... More
2000 Lit HDPE tank

1

-

-

... More
Labour charges for erection of 7.50 HP Submersible pumpset into the Borewell with GI Raiser pipes, cables with proper clamping,valves fixing,cable jointing and wiring from EB pole to Kiosk fixing of main switch Panel board etc Complete and testing the pumpset and trail run for 10 days

1

-

-

... More
Providing of EB service main arrangement from EB post to pump room and fitting service pipe EB board wiring complete including 7/20 PVC overhead wiring main,fuse unit, GI wire and all materials fixing complete.

1

-

-

... More
Construction of pump room masonry work including all labour and all material charges

1

-

-

... More
Construction of sintex tank pedestal arrangements including cost and conveyance of all materials and all labour charges

1

-

-

... More
Providing bore well pit protection arrangements in Brick work and using CC 1:2:4 including all materials and all labour charges

1

-

-

... More
Earth work excavation hard stiff clay and hard rock earth and pipe laying, Jointing and refilling the trench with excavation soils including all labour charges etc.,complete

-

-

-

... More
63mm PVC 4 kg/sqcm Pipe

82

-

-

... More
cable line

12

-

-

... More
Provision for fencing arrangements

-

-

-

... More
Providing and erection of 50mm GI pipe with cement concrete foundation at 65 cm c/c for fencing including painting charges, etc, complete.

440

-

-

... More
Provision for Green net allround miyawaki including all charges materials to site and all labour charges etc

440

-

-

... More
Provision for name board

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-

... More
8. Construction of Drainage (116m) with Vertical Soak Pit at Periyurpatti Colony Estimate Amount Rs.5.80 lakhs

-

-

-

... More
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B

63.8

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.

12.76

-

-

... More
Supply and errecting centering charges for Plain surface including cost & conveyance of all materials to site and all labour charges etc., complete.

278.4

-

-

... More
CC 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.

32.02

-

-

... More
Plastering with cement mortar 1:4 mix to 20mm thick including cost and conveyance of all materials & all labour charges etc., complete.

46.4

-

-

... More
Construction of Vertical community soak pit

-

-

-

... More
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B For Foundation

46.57

-

-

... More
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B For Drain Foundation

6.27

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.

1.8

-

-

... More
Supply and errecting centering charges for Plain surface including cost & conveyance of all materials to site and all labour charges etc., complete.

39.56

-

-

... More
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

2.57

-

-

... More
Brick work in c.m 1:5 mix using country bricks including cost & conveyance of all materials to site and all labour charges etc., complete.

0.98

-

-

... More
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials & all labour charges etc., complete.

6.02

-

-

... More
Cost and supply of 1m dia precast ring complete complying with standard specification.

5

-

-

... More
Cost and supply of 1m dia precast cover slab complete complying with standard specification.

1

-

-

... More
Cost and supply of 180m dia PVC Pipe

4.3

-

-

... More
Cost and supply of RCC precast slab fo Chamber complete complying with standard specification.

3

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

2.57

-

-

... More
Plastering with cement mortar 1:4 mix to 20mm thick including cost and conveyance of all materials & all labour charges etc., complete.

12.8

-

-

... More
 Filling the soak pit with 225mm metal as per specification

8.91

-

-

... More
 Filling the soak pit with 40mm metal as per specification

19.45

-

-

... More
 Filling the soak pit with 20mm metal as per specification

14.21

-

-

... More
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete

34.57

-

-

... More
Provision for Name board charges

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.