Rural Development And Panchayat Raj Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - PMGSY Tender

Environmental Service
Eprocure
Opening Date4 Jul 2022
Closing Date18 Jul 2022
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (based on standard schedule of rates vid., S.no 86 Item no.1)

-

-

-

... More
Main pond

1171.8

-

-

... More
Baby pond

400

-

-

... More
Channel area

12.72

-

-

... More
CD Work for Bathing ghatt

-

-

-

... More
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation

55.24

-

-

... More
Supplying and filling with Sand for foundation and basement layers of not more than 15cm thick well rammed and watering Complying with standard specification

26.12

-

-

... More
Cement concrete for foundation 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification

31.22

-

-

... More
Providing Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete

93.37

-

-

... More
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm

115.59

-

-

... More
Provision for Name board charges

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-

... More
Part 2 : Deepaning and Strengthining of Mondimallanaicken kulam MI Tank at Velayuthapalayam in Alambady Panchayat Estimate Amount Rs.4.00 lakhs

-

-

-

... More
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification

600

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying by earth by deploying earth moving machineries and tippers etc complete Fomation of bund in layer of suitable thickness benching of slopes prior to placement od earth fill breaking clods watering to OMC (Optimum moidture content) and compaction of each layer to 95% proctor density through deployment of appropriate compaction eqipement (+-8-10T Power roller /Vibtratory power roller / short width +-0.90m with drum) power roller or vibratory power roller / fuel oparated or elect - oparated plade compactor ensuring compaction of dedigned bund section including side slopes" complete as per specification.

-

-

-

... More
With Compaction

4056.89

-

-

... More
Without Compaction

55.88

-

-

... More
Provision for Name board charges

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-

... More
Part 3 : Deepaning and Strengthining of Vallikulam MI Tank at Pandithakaranur in Alambady Panchayat Estimate Amount Rs.4.40 lakhs

-

-

-

... More
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification

9570

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying by earth by deploying earth moving machineries and tippers etc complete Fomation of bund in layer of suitable thickness benching of slopes prior to placement od earth fill breaking clods watering to OMC (Optimum moidture content) and compaction of each layer to 95% proctor density through deployment of appropriate compaction eqipement (+-8-10T Power roller /Vibtratory power roller / short width +-0.90m with drum) power roller or vibratory power roller / fuel oparated or elect - oparated plade compactor ensuring compaction of dedigned bund section including side slopes" complete as per specification.

-

-

-

... More
With Compaction

3963.61

-

-

... More
Without Compaction

71.25

-

-

... More
Provision for Name board charges

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-

... More
Part 4 : Deepaning and Strengthining and Construction Construction of weir in Mathanaicker MI Tank at Poosaripatti in Alambady panchayat Estimate Amount Rs.14.84 lakhs

-

-

-

... More
Bund Strengthening

-

-

-

... More
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification

8370

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying by earth by deploying earth moving machineries and tippers etc complete Fomation of bund in layer of suitable thickness benching of slopes prior to placement od earth fill breaking clods watering to OMC (Optimum moidture content) and compaction of each layer to 95% proctor density through deployment of appropriate compaction eqipement (+-8-10T Power roller /Vibtratory power roller / short width +-0.90m with drum) power roller or vibratory power roller / fuel oparated or elect - oparated plade compactor ensuring compaction of dedigned bund section including side slopes" complete as per specification.

-

-

-

... More
With Compaction

6630.84

-

-

... More
Without Compaction

60.75

-

-

... More
Construction of Surplus weir

-

-

-

... More
Earthwork excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil inclusive of shoring to full depth strutting and bailing out w

92.04

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

16.18

-

-

... More
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

88.96

-

-

... More
Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm

208.92

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

8.37

-

-

... More
Provision for Name board charges

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-

... More
Part 5 : Deepaning and Strengthining with Revitment ,Toewall and bathing ghat at in Nallagoundanpatty Pond at Nallagoundanpatty in Mallapuram panchayat Estimate Amount Rs.7.00 lakhs

-

-

-

... More
Main pond and Baby pond Earth work

-

-

-

... More
Cleaning light Jungle (based on standard schedule of rates vid., S.no 2 Item no.2)

4446

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (based on standard schedule of rates vid., S.no 86 Item no.1)

-

-

-

... More
Main pond

367.42

-

-

... More
Baby pond

225

-

-

... More
Channel area

7.6

-

-

... More
CD Work for Bathing ghatt

-

-

-

... More
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation

47.41

-

-

... More
Supplying and filling with Sand for foundation and basement layers of not more than 15cm thick well rammed and watering Complying with standard specification

22.64

-

-

... More
Cement concrete for foundation 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification

26.93

-

-

... More
Providing Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete

76.06

-

-

... More
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm

105.09

-

-

... More
Provision for Name board charges

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-

... More
Part 6 : Deepaning and Strengthining with Revitment ,Toewall and bathing ghat at in Chinna kulam Pond at Mallapuram in Mallapuram panchayat Estimate Amount Rs.6.85 lakhs

-

-

-

... More
Main pond and Baby pond Earth work

-

-

-

... More
Cleaning light Jungle (based on standard schedule of rates vid., S.no 2 Item no.2)

4212

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (based on standard schedule of rates vid., S.no 86 Item no.1)

-

-

-

... More
Main pond

534

-

-

... More
Baby pond

225

-

-

... More
Channel area

7.6

-

-

... More
CD Work for Bathing ghatt

-

-

-

... More
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation

45.79

-

-

... More
Supplying and filling with Sand for foundation and basement layers of not more than 15cm thick well rammed and watering Complying with standard specification

22.64

-

-

... More
Cement concrete for foundation 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification

26.39

-

-

... More
Providing Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete

72.68

-

-

... More
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm

103.29

-

-

... More
Provision for Name board charges

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-

... More
Part 7 : Deepeening and Strengthening of Chinnagoundan kulam MI tank with Construction of new Surpuls weir at Chinnagoundanpatty in Mallapuram panchayat Estimate Amount Rs.8.15 lakhs

-

-

-

... More
Bund Strengthening

-

-

-

... More
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification

450

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying by earth by deploying earth moving machineries and tippers etc complete Fomation of bund in layer of suitable thickness benching of slopes prior to placement od earth fill breaking clods watering to OMC (Optimum moidture content) and compaction of each layer to 95% proctor density through deployment of appropriate compaction eqipement (+-8-10T Power roller /Vibtratory power roller / short width +-0.90m with drum) power roller or vibratory power roller / fuel oparated or elect - oparated plade compactor ensuring compaction of dedigned bund section including side slopes" complete as per specification.

-

-

-

... More
With Compaction

2751.05

-

-

... More
Without Compaction

55.5

-

-

... More
Construction of Surplus weir

-

-

-

... More
Earthwork excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil inclusive of shoring to full depth strutting and bailing out w

67.2

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

15.42

-

-

... More
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

49.6

-

-

... More
Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm

174.07

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

8.83

-

-

... More
Provision for Name board charges

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-

... More
Part 8 : Deepeening and Strengthening with Reconstruction of Surpuls weir in Muthupillai kulam MI Tank at Indra colony in R.Kombai panchayat Estimate Amount Rs.11.40 lakhs

-

-

-

... More
Bund Strengthening

-

-

-

... More
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification

2016

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying by earth by deploying earth moving machineries and tippers etc complete Fomation of bund in layer of suitable thickness benching of slopes prior to placement od earth fill breaking clods watering to OMC (Optimum moidture content) and compaction of each layer to 95% proctor density through deployment of appropriate compaction eqipement (+-8-10T Power roller /Vibtratory power roller / short width +-0.90m with drum) power roller or vibratory power roller / fuel oparated or elect - oparated plade compactor ensuring compaction of dedigned bund section including side slopes" complete as per specification.

-

-

-

... More
With Compaction

3681.38

-

-

... More
Without Compaction

60.75

-

-

... More
Construction of Surplus weir

-

-

-

... More
Earthwork excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil inclusive of shoring to full depth strutting and bailing out w

80.43

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

12.64

-

-

... More
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

92.89

-

-

... More
Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm

190.52

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

5.44

-

-

... More
Provision for Name board charges

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-

... More
Part 9 : Deepeening and Strengthening with Reconstruction of Surpuls weir in Thandalkaran kulam MI Tank at Anaigoundanpatty in R.Kombai panchayat Estimate Amount Rs.9.00 lakhs

-

-

-

... More
Bund Strengthening

-

-

-

... More
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification

1200

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying by earth by deploying earth moving machineries and tippers etc complete Fomation of bund in layer of suitable thickness benching of slopes prior to placement od earth fill breaking clods watering to OMC (Optimum moidture content) and compaction of each layer to 95% proctor density through deployment of appropriate compaction eqipement (+-8-10T Power roller /Vibtratory power roller / short width +-0.90m with drum) power roller or vibratory power roller / fuel oparated or elect - oparated plade compactor ensuring compaction of dedigned bund section including side slopes" complete as per specification.

-

-

-

... More
With Compaction

1704

-

-

... More
Without Compaction

60.75

-

-

... More
Construction of Surplus weir

-

-

-

... More
Earthwork excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil inclusive of shoring to full depth strutting and bailing out w

77.15

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

12.38

-

-

... More
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

85.38

-

-

... More
Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm

185.72

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

5.54

-

-

... More
Provision for Name board charges

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-

... More
Part 10 : Deepaning and Strengthining with Revitment ,Toewall and bathing ghat at in Sikkaiyagoundan kulam Pond at Kaalagoundanpatty in R.Puthukottai panchayat Estimate Amount Rs.12.50 lakhs

-

-

-

... More
Main pond and Baby pond Earth work

-

-

-

... More
Cleaning light Jungle (based on standard schedule of rates vid., S.no 2 Item no.2)

3936

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (based on standard schedule of rates vid., S.no 86 Item no.1)

-

-

-

... More
Main pond

1961.1

-

-

... More
Baby pond

900

-

-

... More
Channel area

15.26

-

-

... More
CD Work for Bathing ghatt

-

-

-

... More
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation

70.09

-

-

... More
Supplying and filling with Sand for foundation and basement layers of not more than 15cm thick well rammed and watering Complying with standard specification

34.57

-

-

... More
Cement concrete for foundation 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification

41.02

-

-

... More
Providing Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete

131.26

-

-

... More
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm

148.87

-

-

... More
Provision for Name board charges

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-

... More
Part 11 : Deepaning and Strengthining with Revitment ,Toewall and bathing ghat at in Muthanaicken kulam Pond at Muthanaickenpudhur in R.Puthukottai panchayat Estimate Amount Rs.7.25 lakhs

-

-

-

... More
Main pond and Baby pond Earth work

-

-

-

... More
Cleaning light Jungle (based on standard schedule of rates vid., S.no 2 Item no.2)

2538

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (based on standard schedule of rates vid., S.no 86 Item no.1)

-

-

-

... More
Main pond

493.95

-

-

... More
Baby pond

225

-

-

... More
Channel area

7.6

-

-

... More
CD Work for Bathing ghatt

-

-

-

... More
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation

49.84

-

-

... More
Supplying and filling with Sand for foundation and basement layers of not more than 15cm thick well rammed and watering Complying with standard specification

22.64

-

-

... More
Cement concrete for foundation 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification

27.74

-

-

... More
Providing Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete

80.41

-

-

... More
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm

104.64

-

-

... More
Provision for Name board charges

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-

... More
Part 12 : Deepeening and Strengthening with Reconstruction of Surpuls weir in Chinna kulam MI Tank at Vannanur in R.Puthukottai panchayat Estimate Amount Rs.9.80 lakhs

-

-

-

... More
Bund Strengthening

-

-

-

... More
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification

7722

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying by earth by deploying earth moving machineries and tippers etc complete Fomation of bund in layer of suitable thickness benching of slopes prior to placement od earth fill breaking clods watering to OMC (Optimum moidture content) and compaction of each layer to 95% proctor density through deployment of appropriate compaction eqipement (+-8-10T Power roller /Vibtratory power roller / short width +-0.90m with drum) power roller or vibratory power roller / fuel oparated or elect - oparated plade compactor ensuring compaction of dedigned bund section including side slopes" complete as per specification.

-

-

-

... More
With Compaction

3560.66

-

-

... More
Without Compaction

55.5

-

-

... More
Construction of Surplus weir

-

-

-

... More
Earthwork excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil inclusive of shoring to full depth strutting and bailing out w

76.43

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

17.84

-

-

... More
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

54.18

-

-

... More
Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm

163.87

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

10.54

-

-

... More
Provision for Name board charges

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-

... More
Part 13 : Deepeening and Strengthening with Reconstruction of Surpuls weir in Sangan kulam MI Tank at Vannanur in Vadugambady panchayat Estimate Amount Rs.21.21 lakhs

-

-

-

... More
Bund Strengthening

-

-

-

... More
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification

3360

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying by earth by deploying earth moving machineries and tippers etc complete Fomation of bund in layer of suitable thickness benching of slopes prior to placement od earth fill breaking clods watering to OMC (Optimum moidture content) and compaction of each layer to 95% proctor density through deployment of appropriate compaction eqipement (+-8-10T Power roller /Vibtratory power roller / short width +-0.90m with drum) power roller or vibratory power roller / fuel oparated or elect - oparated plade compactor ensuring compaction of dedigned bund section including side slopes" complete as per specification.

-

-

-

... More
With Compaction

8641.43

-

-

... More
Without Compaction

126.25

-

-

... More
Construction of Surplus weir

-

-

-

... More
Earthwork excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil inclusive of shoring to full depth strutting and bailing out w

148.99

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

26.68

-

-

... More
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

145.25

-

-

... More
Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm

294.24

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

14.11

-

-

... More
Provision for Name board charges

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.