Rural Development And Panchayat Raj Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Civil And Construction
Road Construction
Eprocure
Opening Date17 May 2023
Closing Date31 May 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and Laying Gravel Soling to compacted thickness including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. KM 0/0-1/8

92.1

-

-

... More
Picking the Existing metalled surface 5cm to 10cm thick and carefully stacking materials useful for refuse including hire charge for tools etc.

1705

-

-

... More
Providing 75mm consolidated thickness WBM for top layer using 1 cum of grade III metal of 2.5% of 63mm, 20%of 53 mm, 72.5% of 45mm and 2.5% of 22.4mm ,2.5% of 11.2mm IRC size HBG metal 0.24 cum of gravel whose PI values is less than '6' for blindage and filler for 10 sqm. area (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) including cost and conveyeance of all materials from approved quarries to road side and stacking of materials to departmental standard metic gauge for pre - measurements including labour for laying,spreading new metal,hand packing to camber gravel blinding, watering with all leads fro good water even if the season is worst drought forming edge bunds and consolidation by 8 to 10 tone power roller and finishing to the total thickness with lines grades and cross sections as specified in the departmental specifications including hire charges for all T&P fuel cost and other running charges for power roller and other tools and plants employed and all other incidental charges etc., complete. SSRB 203-05,203-03,502 MOST 401,402.

-

-

-

... More
0/0-1/0

147.37

-

-

... More
1/0-1/915

198

-

-

... More
Applying tack coat over WBM surface using 4Kg of bituminous emulsion per 10sqm including cost of bituminous emulsion which will be supplied departmentallly at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handing charges including labour charges for brushing cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire fuel and running charges for all tools and plants employed for the work including all other charges such as barricading and providing danger lights flags etc., complete.

-

-

-

... More
0/0-1/0

1965

-

-

... More
1/0-1/915

2640

-

-

... More
Providing and laying open graded premix carpet of 20mm compacted thickness using IRC size machine broken HBG metal 0.18 cum, 13.2mm and 0.09 cum of 11.20 m with 14.60 kg of bitumen for premixing for 10sqm of premix carpet and 0.09 cum of 6.7 mm IRC size HBG metal with 9.80kg of bitumen for 10sqm for seal coat including cost and conveyance of all materials from approved quarry to work site and stacking them to departmental gauge for pre measurement including cost of bulk bitumen the rates specified in the special conditions appended herewith and including conveyance of bitumen to work spot handling charges for the same at both ends including labour charges for heating the bitumen to required temperature and mixing the required quantity of metal and bitumen using Mini Hot Mix Plant conveying the mix by wheel borrows including labour charges for spreading the mix to grades, lines and profiles and compacting with power roller rolling etc., including all labour charges application of bitumen for seal coat and power roller rolling separately as per MoRT & H specification 509 and 513 including all incidental charges such as barricading providing danger lights etc., complete

-

-

-

... More
0/0-1/0

1965

-

-

... More
1/0-1/915

2640

-

-

... More
Provision of 15 nos . Rumble strips coverd with premix bituminous carpet, 15-20 mm high at centre 250mm wide placed at 1 m centre to centre at approved location to control speed marked with white strips of road marking paint.

9

-

-

... More
Road Marking with Hot applied Thermplastic Compound with Reflectorising Glass bends on Bituminous Surface

307

-

-

... More
Hard Bed

-

-

-

... More
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B

-

-

-

... More
0/0-1/0

12.15

-

-

... More
1/0-1/915

3.15

-

-

... More
Cement Concrete 1:4:8 one cement, four Crusser Stone sand and eight hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980

-

-

-

... More
0/0-1/0

4.05

-

-

... More
1/0-1/915

1.05

-

-

... More
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
0/0-1/0

67.5

-

-

... More
1/0-1/915

17.5

-

-

... More
Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 20mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980

-

-

-

... More
0/0-1/0

6.21

-

-

... More
1/0-1/915

1.61

-

-

... More
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20A

-

-

-

... More
0/0-1/0

3.64

-

-

... More
1/0-1/915

0.94

-

-

... More
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .

-

-

-

... More
0/0-1/0

3.64

-

-

... More
1/0-1/915

0.94

-

-

... More
Construction of Un reinforced dowel jointed at expansion and construction joint only plain cement concrete pavement thickness as per design over a prepared sub base with 43 grade cement or any other type as per clasuse 1501.2.2 M30 (grade) coarse and fine aggregate conforming to IS : 383 maximum size of course aggregate not exceeding 25mm mixed in a concrete mixure of not less than 0.20 cum capacity and appropriate weight bacher using approved mix design laid in approved fixed side form work n(steel channel), Laying, and fixing of 125 micron thick polythine film, wedges, steel plates, including levelling the form work as per drawing), spreding the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joint, applying debonding strips, primer, sealant, ndowl bars, near approches, to bridge/culvert and construction joint, admixtures as approved, curing of concrete slab for 14 days, using curing compound (where specified)nand water finishing to lines and grade as per drawing and Technical Specification Clause 1501.

-

-

-

... More
0/0-1/0

97.13

-

-

... More
1/0-1/915

18.38

-

-

... More
Supply and fixing of KILOMETRE STONE (three faces two lines dressed) of size 1.65 x 0.45 x 0.15m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.

1

-

-

... More
Supply and fixing of HECTOMETRE STONE (three faces two lines dressed) of size 0.75 x 0.23 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.

8

-

-

... More
60 cm Equilateral Triangle Cautionary Sign Board

10

-

-

... More
Providing and Fixing of MGSMT Project Board and Maintanance Board

2

-

-

... More
Road Marking / Road Stud with Lens Reflector

16

-

-

... More
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m

-

-

-

... More
For the First Year from the date of completion of work

1.92

-

-

... More
For the Second Year from the date of cpmpletion of work

1.92

-

-

... More
For the Third Year from the date of completion of work

1.92

-

-

... More
For the Fourth Year from the date of completion of work

1.92

-

-

... More
For the Fifth Year from the date of completion of work

1.92

-

-

... More
Strengthening of Puthukulam Erayancode Road in Maruthencode Vpt.

-

-

-

... More
Clearing the scrub jungle with uprooting and including all cuttings and deposting of the products,removing from the site, disposal by burrying or burning etc., complete including all incidental charges as directed by the departmental officers. As per SSRB 301,302 Most 201

783.36

-

-

... More
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20A

63.72

-

-

... More
Providing and Laying Gravel Soling to compacted thickness including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. KM 0/0-1/8

42.48

-

-

... More
Picking the Existing metalled surface 5cm to 10cm thick and carefully stacking materials useful for refuse including hire charge for tools etc.

1088

-

-

... More
Providing 75mm consolidated thickness WBM for top layer using 1 cum of grade III metal of 2.5% of 63mm, 20%of 53 mm, 72.5% of 45mm and 2.5% of 22.4mm ,2.5% of 11.2mm IRC size HBG metal 0.24 cum of gravel whose PI values is less than '6' for blindage and filler for 10 sqm. area (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) including cost and conveyeance of all materials from approved quarries to road side and stacking of materials to departmental standard metic gauge for pre - measurements including labour for laying,spreading new metal,hand packing to camber gravel blinding, watering with all leads fro good water even if the season is worst drought forming edge bunds and consolidation by 8 to 10 tone power roller and finishing to the total thickness with lines grades and cross sections as specified in the departmental specifications including hire charges for all T&P fuel cost and other running charges for power roller and other tools and plants employed and all other incidental charges etc., complete. SSRB 203-05,203-03,502 MOST 401,402.

-

-

-

... More
0/0-1/0

34.65

-

-

... More
1/0-1/2

45

-

-

... More
Applying tack coat over WBM surface using 4Kg of bituminous emulsion per 10sqm including cost of bituminous emulsion which will be supplied departmentallly at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handing charges including labour charges for brushing cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire fuel and running charges for all tools and plants employed for the work including all other charges such as barricading and providing danger lights flags etc., complete.

-

-

-

... More
0/0-1/0

462

-

-

... More
1/0-1/2

600

-

-

... More
Providing and laying open graded premix carpet of 20mm compacted thickness using IRC size machine broken HBG metal 0.18 cum, 13.2mm and 0.09 cum of 11.20 m with 14.60 kg of bitumen for premixing for 10sqm of premix carpet and 0.09 cum of 6.7 mm IRC size HBG metal with 9.80kg of bitumen for 10sqm for seal coat including cost and conveyance of all materials from approved quarry to work site and stacking them to departmental gauge for pre measurement including cost of bulk bitumen the rates specified in the special conditions appended herewith and including conveyance of bitumen to work spot handling charges for the same at both ends including labour charges for heating the bitumen to required temperature and mixing the required quantity of metal and bitumen using Mini Hot Mix Plant conveying the mix by wheel borrows including labour charges for spreading the mix to grades, lines and profiles and compacting with power roller rolling etc., including all labour charges application of bitumen for seal coat and power roller rolling separately as per MoRT & H specification 509 and 513 including all incidental charges such as barricading providing danger lights etc., complete

-

-

-

... More
0/0-1/0

462

-

-

... More
1/0-1/2

600

-

-

... More
Provision of 15 nos . Rumble strips coverd with premix bituminous carpet, 15-20 mm high at centre 250mm wide placed at 1 m centre to centre at approved location to control speed marked with white strips of road marking paint.

9

-

-

... More
Road Marking with Hot applied Thermplastic Compound with Reflectorising Glass bends on Bituminous Surface

70.8

-

-

... More
Hard Bed

-

-

-

... More
Construction of Un reinforced dowel jointed at expansion and construction joint only plain cement concrete pavement thickness as per design over a prepared sub base with 43 grade cement or any other type as per clasuse 1501.2.2 M30 (grade) coarse and fine aggregate conforming to IS : 383 maximum size of course aggregate not exceeding 25mm mixed in a concrete mixure of not less than 0.20 cum capacity and appropriate weight bacher using approved mix design laid in approved fixed side form work n(steel channel), Laying, and fixing of 125 micron thick polythine film, wedges, steel plates, including levelling the form work as per drawing), spreding the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joint, applying debonding strips, primer, sealant, ndowl bars, near approches, to bridge/culvert and construction joint, admixtures as approved, curing of concrete slab for 14 days, using curing compound (where specified)nand water finishing to lines and grade as per drawing and Technical Specification Clause 1501.

466.9

-

-

... More
Retaining Wall

-

-

-

... More
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B

28.5

-

-

... More
Cement Concrete 1:4:8 one cement, four Crusser Stone sand and eight hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980

11.4

-

-

... More
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.

80.2

-

-

... More
Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980

56.48

-

-

... More
Supply and fixing of KILOMETRE STONE (three faces two lines dressed) of size 1.65 x 0.45 x 0.15m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.

1

-

-

... More
Supply and fixing of HECTOMETRE STONE (three faces two lines dressed) of size 0.75 x 0.23 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.

5

-

-

... More
60 cm Equilateral Triangle Cautionary Sign Board

3

-

-

... More
Providing and Fixing of MGSMT Project Board and Maintanance Board

2

-

-

... More
Road Marking / Road Stud with Lens Reflector

18

-

-

... More
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m

-

-

-

... More
For the First Year from the date of completion of work

1.2

-

-

... More
For the Second Year from the date of cpmpletion of work

1.2

-

-

... More
For the Third Year from the date of completion of work

1.2

-

-

... More
For the Fourth Year from the date of completion of work

1.2

-

-

... More
For the Fifth Year from the date of completion of work

1.2

-

-

... More
Strengthening of Kancode Chani Road in Malayadi Vpt.

-

-

-

... More
Clearing the scrub jungle with uprooting and including all cuttings and deposting of the products,removing from the site, disposal by burrying or burning etc., complete including all incidental charges as directed by the departmental officers. As per SSRB 301,302 Most 201

665.28

-

-

... More
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20A

65.52

-

-

... More
Providing and Laying Gravel Soling to compacted thickness including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. KM 0/0-1/8

43.68

-

-

... More
Picking the Existing metalled surface 5cm to 10cm thick and carefully stacking materials useful for refuse including hire charge for tools etc.

924

-

-

... More
Providing 75mm consolidated thickness WBM for top layer using 1 cum of grade III metal of 2.5% of 63mm, 20%of 53 mm, 72.5% of 45mm and 2.5% of 22.4mm ,2.5% of 11.2mm IRC size HBG metal 0.24 cum of gravel whose PI values is less than '6' for blindage and filler for 10 sqm. area (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) including cost and conveyeance of all materials from approved quarries to road side and stacking of materials to departmental standard metic gauge for pre - measurements including labour for laying,spreading new metal,hand packing to camber gravel blinding, watering with all leads fro good water even if the season is worst drought forming edge bunds and consolidation by 8 to 10 tone power roller and finishing to the total thickness with lines grades and cross sections as specified in the departmental specifications including hire charges for all T&P fuel cost and other running charges for power roller and other tools and plants employed and all other incidental charges etc., complete. SSRB 203-05,203-03,502 MOST 401,402.

81.9

-

-

... More
Applying tack coat over WBM surface using 4Kg of bituminous emulsion per 10sqm including cost of bituminous emulsion which will be supplied departmentallly at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handing charges including labour charges for brushing cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire fuel and running charges for all tools and plants employed for the work including all other charges such as barricading and providing danger lights flags etc., complete.

1092

-

-

... More
Providing and laying open graded premix carpet of 20mm compacted thickness using IRC size machine broken HBG metal 0.18 cum, 13.2mm and 0.09 cum of 11.20 m with 14.60 kg of bitumen for premixing for 10sqm of premix carpet and 0.09 cum of 6.7 mm IRC size HBG metal with 9.80kg of bitumen for 10sqm for seal coat including cost and conveyance of all materials from approved quarry to work site and stacking them to departmental gauge for pre measurement including cost of bulk bitumen the rates specified in the special conditions appended herewith and including conveyance of bitumen to work spot handling charges for the same at both ends including labour charges for heating the bitumen to required temperature and mixing the required quantity of metal and bitumen using Mini Hot Mix Plant conveying the mix by wheel borrows including labour charges for spreading the mix to grades, lines and profiles and compacting with power roller rolling etc., including all labour charges application of bitumen for seal coat and power roller rolling separately as per MoRT & H specification 509 and 513 including all incidental charges such as barricading providing danger lights etc., complete

1092

-

-

... More
Provision of 15 nos . Rumble strips coverd with premix bituminous carpet, 15-20 mm high at centre 250mm wide placed at 1 m centre to centre at approved location to control speed marked with white strips of road marking paint.

9

-

-

... More
Road Marking with Hot applied Thermplastic Compound with Reflectorising Glass bends on Bituminous Surface

72.8

-

-

... More
Hard Bed

-

-

-

... More
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B

-

-

-

... More
0/0-1/0

32.4

-

-

... More
1/0-1/2

18

-

-

... More
Cement Concrete 1:4:8 one cement, four Crusser Stone sand and eight hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980

-

-

-

... More
0/0-1/0

10.8

-

-

... More
1/0-1/2

6

-

-

... More
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.

-

-

-

... More
0/0-1/0

180

-

-

... More
1/0-1/2

100

-

-

... More
Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 20mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980

-

-

-

... More
0/0-1/0

16.56

-

-

... More
1/0-1/2

9.2

-

-

... More
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20A

-

-

-

... More
0/0-1/0

27.72

-

-

... More
1/0-1/2

15.4

-

-

... More
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .

-

-

-

... More
0/0-1/0

27.72

-

-

... More
1/0-1/2

15.4

-

-

... More
Construction of Un reinforced dowel jointed at expansion and construction joint only plain cement concrete pavement thickness as per design over a prepared sub base with 43 grade cement or any other type as per clasuse 1501.2.2 M30 (grade) coarse and fine aggregate conforming to IS : 383 maximum size of course aggregate not exceeding 25mm mixed in a concrete mixure of not less than 0.20 cum capacity and appropriate weight bacher using approved mix design laid in approved fixed side form work n(steel channel), Laying, and fixing of 125 micron thick polythine film, wedges, steel plates, including levelling the form work as per drawing), spreding the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joint, applying debonding strips, primer, sealant, ndowl bars, near approches, to bridge/culvert and construction joint, admixtures as approved, curing of concrete slab for 14 days, using curing compound (where specified)nand water finishing to lines and grade as per drawing and Technical Specification Clause 1501.

-

-

-

... More
0/0-1/0

204.75

-

-

... More
1/0-1/2

120

-

-

... More
Retaining Wall

-

-

-

... More
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B

55.65

-

-

... More
Cement Concrete 1:4:8 one cement, four Crusser Stone sand and eight hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980

22.26

-

-

... More
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.

236.6

-

-

... More
Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980

93.29

-

-

... More
Supply and fixing of KILOMETRE STONE (three faces two lines dressed) of size 1.65 x 0.45 x 0.15m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.

1

-

-

... More
Supply and fixing of HECTOMETRE STONE (three faces two lines dressed) of size 0.75 x 0.23 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.

5

-

-

... More
60 cm Equilateral Triangle Cautionary Sign Board

9

-

-

... More
Providing and Fixing of MGSMT Project Board and Maintanance Board

2

-

-

... More
Road Marking / Road Stud with Lens Reflector

22

-

-

... More
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m

-

-

-

... More
For the First Year from the date of completion of work

1.2

-

-

... More
For the Second Year from the date of cpmpletion of work

1.2

-

-

... More
For the Third Year from the date of completion of work

1.2

-

-

... More
For the Fourth Year from the date of completion of work

1.2

-

-

... More
For the Fifth Year from the date of completion of work

1.2

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.