Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Building Construction
Eprocure
Opening Date8 Nov 2024
Closing Soon12 Nov 2024
Tender Amount₹ 8,44,000
Costs
EMD
₹ 8,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_499819_1Bid Award Id
ViewTender No
GKT/A6/3415/2023Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Filling with M.Sand including cost and conveyance of all materials to site and all labour charges etc., complete.
4.37
-
-
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
5.05
-
-
R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
13.05
-
-
Supplying and errecting Centering for sides and soffixs of all RCC works including cost and conveyance of all materials to site and all labour charges etc., complete.
-
-
-
Below Sill Level
74.73
-
-
Above Sill Level
30.94
-
-
Brick work with Cement Mortar 1:5 Mix using Country Bricks including cost and conveyance of all materials to site and all labour charges etc., complete.
23.72
-
-
Cost and supply of steel with fabrication charges including cost of steel and binding wire complete with standard specification etc., complete
1.28
-
-
Ceiling plastering with cement mortor 1:3 mix to 10mm thickness including cost and conveyance of all materials to site and all labour charges etc. complete.
39.03
-
-
Plastering with cement mortor 1:5 mix to 12mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete
223.49
-
-
Weathering course with brick jelly lime concrete using 20mm brick jelly with of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete.
2.36
-
-
Pressed Tiles over the RCC roof slab in the proposition and consolidate to required finished thickness beating the mixture with wooden beaters keeping the surface constantly wetted by sprinking lime jaggery water including all other labour charges etc., complete and one layer of pressed tiles set in c.m. 1:3 etc., complete.
24.31
-
-
Providing Granolithic Pattern Floor finish with plain cement concrete 1:2:4 using 10-12 mm ISS HBG metal and top rubbed smooth etc., complete
27
-
-
White washing TWO coats with shell limeincluding cost and conveyance of all materials to work site and all labour charges etc., complete.
44.23
-
-
Distembering two coats including cost of lime blue powder, fevicol type gums, brushes, scaffolding charges etc., complete with standard specification.
109.05
-
-
Emulsion Painting including cost of lime blue powder, fevicol type gums, brushes, scaffolding charges etc., complete with standard specification.
108.91
-
-
Supply and fixing of STEEL DOOR including cost and conveyance of all materials and all labour charges etc., complete. (0.90m x 2.00m)
3
-
-
Supply and fixing of STEEL WINDOW including cost and conveyance of all materials and all labour charges etc., complete. (0.90m x 1.20m)
4
-
-
Labour charges for Steel door and Windows including all labour charges etc., complete
-
-
-
Steel Door
5.67
-
-
Steel Window
4.32
-
-
Painting in two coats using ready mixed enamel paint including all cost and labour charges etc., complete
19.98
-
-
Supply and fixing of Cudappa slab 20/30mm thick cubboard arrangements including all charges etc., complete
5.13
-
-
Supply and fixing of 110mm dia PVC Pipe for Rain water Harvesting etc., complete
3.9
-
-
Wiring with 2x1.5 sqm (22/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100 V Grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories and with TW switch box with with 5A. F.T. sqitch inflush with wall, covered with hylem sheet of sheet of 3mm thick with painting of suitable colour of open PVC Light POINT / FAN POINT including all charges etc., complete.
5
-
-
Wiring with 2x1.5 sqm (22/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100 V Grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories and with TW switch box with with 5A.inflush with wall, covered with hylem sheet of sheet of 3mm thick with painting of suitable colour of open PVC Plug POINT.
2
-
-
Supply and fitting of single box type 4'40W flu fitting complete with copper choke and condensor with conduit pipe sispension from the ceiling with PVC unsheathed Copper leads from terminals to the fitting with tube
3
-
-
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%