Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Eprocure
Opening Date25 Jul 2023
Closing Date11 Aug 2023
Tender AmountRefer Documents
Costs
EMD
₹ 87,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_RDTN_346689_67Bid Award Id
ViewTender No
R6/1332/2023/19.06.2023Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Picking Charges 5 cm to 10 cm old metalled and B.T. surface and sectioning including cost and conveyance and all labour charges etc.
-
-
-
KM 0/0 - 0/60
750
-
-
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., complete.
-
-
-
KM 0/0 - 0/60
383.85
-
-
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
-
-
-
KM 0/0 - 0/60
108
-
-
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
-
-
-
KM 0/0 - 0/60
74.25
-
-
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
-
-
-
KM 0/0 - 0/60
461.26
-
-
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
-
-
-
KM 0/0 - 0/60
1237.5
-
-
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
-
-
-
KM 0/0 - 0/60
2745
-
-
Providing and Laying of Bitumen Macadam 50mm Thick Using hot mix plant using Crushed aggergate of Grading as per consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
-
-
-
KM 0/0 - 0/60
75.38
-
-
BITUMINOUS CONCRETE 25MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 25mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
-
-
-
KM 0/0 - 0/60
76.16
-
-
Provision For HM Stone
3
-
-
Road marking with Hot Applied Thermopalstic compound with reflectorising Glass beads on Bituminous surface
120
-
-
60cm Equilqteral Traiangle Sing Board
1
-
-
Provision For Citizition Information Board
1
-
-
Part II -Renewal of BT Road from Athiyuthu To Palanivalasai Road (via) Elementary School Km 0/0-1/780 (R-250)
-
-
-
Clearing the scrub Jungle with out uprooting including all labour charges
-
-
-
KM 0/0 - 2/350
3204
-
-
Earthwork excavation and depositing of bank in all classes of soils such as hard stiff clay hard black cotton soil , hard red earth hard murrum, etc as per SS 20A including all labour charges etc., for widening side berm
-
-
-
KM 0/0 - 2/350
978
-
-
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
-
-
-
KM 0/0 - 1/0
166.5
-
-
KM 1/0 - 1/780
140.4
-
-
Applying TACK COAT over WBM surface at 3Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
-
-
-
KM 0/0 - 1/780
6737.5
-
-
KM 0/0 - 1/0
95.32
-
-
BITUMINOUS CONCRETE 25MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 25mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
-
-
-
KM 1/0 - 1/780
73.13
-
-
Road marking with Hot Applied Thermopalstic compound with reflectorising Glass beads on Bituminous surface
356
-
-
Providing and fixing of KM stone for standard specification
1
-
-
Providing and fixing of HM stone for standard specification
7
-
-
Providing and fixing of sign board for standard specification
1
-
-
Providing and fixing of name board for standard specification
1
-
-
Part I - Strengthening the Road From NH49 to Keelasothoorani Via Agro Servies in Sakkarakottai Panchayat (R- 196) 0/0-0/600 KM
-
-
-
Towards the charges for routline
maintenance of the road work executed
under MGSMT including dressing of berms
by refilling the gully with the earth from
borrow pits, cleaning of wild seasonal
growth on berms, destilting of side drains
and CD works, white washing guard stones,
painting of KM, HM stones, parapets,
cutting of branches of trees, refixing
displaced guard stones, caution boards,
speed limit boards etc., with the periodicity
for the above activities as prescribed in IRCSP-
20:2002 and as directed by the
departmental officers except for the
constructional defects which has to be
rectified by the contractor at his own cost
-
-
-
For the First Year from the date of
completion of work
0.6
-
-
For the Second Year from the date of
completion of work
0.6
-
-
For the Third Year from the date of
completion of work
0.6
-
-
For the Fourth Year from the date of
completion of work
0.6
-
-
For the Fifth Year from the date of
completion of work
0.6
-
-
Part II -Renewal of BT Road from Athiyuthu To Palanivalasai Road (via) Elementary School Km 0/0-1/780 (R-250)
-
-
-
Towards the charges for routline
maintenance of the road work executed
under MGSMT including dressing of berms
by refilling the gully with the earth from
borrow pits, cleaning of wild seasonal
growth on berms, destilting of side drains
and CD works, white washing guard stones,
painting of KM, HM stones, parapets,
cutting of branches of trees, refixing
displaced guard stones, caution boards,
speed limit boards etc., with the periodicity
for the above activities as prescribed in IRCSP-
20:2002 and as directed by the
departmental officers except for the
constructional defects which has to be
rectified by the contractor at his own cost
-
-
-
For the First Year from the date of
completion of work
1.78
-
-
For the Second Year from the date of
completion of work
1.78
-
-
For the Third Year from the date of
completion of work
1.78
-
-
For the Fourth Year from the date of
completion of work
1.78
-
-
For the Fifth Year from the date of
completion of work
1.78
-
-
GST
-
-
-
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements