Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department Tender
Water Storage And Supply
Eprocure
Opening Date10 Jan 2019
Closing Date23 Jan 2019
Tender Amount₹ 13,05,000
Costs
EMD
₹ 13,050Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Tirunelveli District Capital Grant Fund 2017-18 1. Construction Of 60000 Litre Oht At Vadikottai Village And Panchayat. 12m Staging Height. In Sankarankovil Union
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_RDTN_116716_1Bid Award Id
ViewTender No
A3/4203/2018/CGFTender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://https://www.tnrd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
2 nd Depth
8.75
-
-
Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete as directed by Department officers.
2.92
-
-
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Department officers.
4.37
-
-
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum.
-
-
-
For footing below G.L. ( 1,50 to 4,50 below GL )
9.28
-
-
For Column and Brace upto G.L ( 0 to1,50 below GL )
2.32
-
-
For column and brace I 0 to 4.5m from GL
3.79
-
-
For column and brace II 4.5m to 7.32m from GL
1.59
-
-
For column and brace III 7.32 to 10.98m from GL
1.59
-
-
For column beam floor slab side wall from 10.98m to 14.64 m from GL
15.45
-
-
For side wall, hance and Roof slab from 14.64 m to 18.30 m from GL
7.58
-
-
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding
-
-
-
PLANE SURFACES
-
-
-
Below GL
-
-
-
For column footing and GL Brace
24.56
-
-
GL 0 to 3.30 M
-
-
-
For Brace I
14.56
-
-
5.3. to 6.30 m
-
-
-
For Brace II
11.25
-
-
6.3. to 7.30 m
-
-
-
For Brace II
3.31
-
-
8.3. to 9.30 m
-
-
-
For Brace III
9.93
-
-
9.3. to 10.30 m
-
-
-
For Brace III
4.63
-
-
3.30 TO 4.30 m
-
-
-
Roof slab
21.47
-
-
11.30 to 12.30m
-
-
-
For Floor Beam and Bottm of Floor slab
49.13
-
-
SQUARE COLUMN
-
-
-
For column Below GL
7.44
-
-
For column GL 0 to 3.30M
17.52
-
-
For column ( 3.31m to 4.30m ).
5.6
-
-
For column ( 4.31m to 5.30m).
5.6
-
-
For Column (5.31m to 6.30m )
4.94
-
-
For Column (6.31m to 7.30m )
5.3
-
-
For Column (7.31m to 8.30m )
5.6
-
-
For Column (8.31m to 9.30m )
5.06
-
-
For Column (9.31m to 10.30m )
5.18
-
-
For Column (10.31m to 11.30m )
5.6
-
-
For Column (11.31m to 11.40m )
0.56
-
-
CURVED SURFACE
-
-
-
0 to 3.30 M
-
-
-
For Side Wall, & Floor slab sides and Haunch
113.8
-
-
3.3 to 4.30 M
-
-
-
For Side Wall, Roof Slab sides
10.63
-
-
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by Deparment officers.
60.24
-
-
Painting two coats with approved cement paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete and as directed by Deparment officers
225.24
-
-
Providing MS Ladder & Hand rails arrangements in 60,000 Lits. Capacity OHT With 12.00m Staging Height.
1
-
-
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete cur
1
-
-
Providing manhole cover of size 1x1 0.75 X 0.75 M in RCC 1: 1.5:3 with suitable reinforcement and 5O x 5O x 6mm MS angle fixed along edges and as directed by Department officers.
1
-
-
Providing GI ventilating arrangements mosquito proof nylon net with 50 mm GI pipes and cowl and as directed by Deparment officers
3
-
-
Painting Department emblem 1 x 1 on the SR with enamel paint as per Board's specification and as directed by Deparment officers
1.8
-
-
Supply & Delivery of following Pipes and specials for OHT connection
-
-
-
Supply of GI Pipes for OHT Connections 65 mm dia
98
-
-
Supply and Delivery of G.M.Gate valve 65mm size
2
-
-
Supply & Delivery of 65 mm G.I Tee
3
-
-
Supply & Delivery of 65 mm G.I Coupling
9
-
-
Supply & Delivery of 65 mm G.I bend
6
-
-
Supply & Delivery of 90mm T.Coupler PVC
4
-
-
Supply & Delivery of 80mm x 65mm G.I.Reducer
4
-
-
Supply & Delivery of 65mm G.I.flange set
2
-
-
Labour charges for fixing of G.I. Pipes & Specials for OHT pipe connections as directed by the Deparment Officers,
1
-
-
Refilling of the foundation with execavated soil in layers of thick including ramming watering etc., complete as directed by the Department officers
49.56
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements