Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Eprocure
Opening Date3 Oct 2024
Closing Date16 Oct 2024
Tender Amount₹ 34,23,000
Costs
EMD
₹ 34,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_490386_1Bid Award Id
ViewTender No
Roc.No.3879/2023/A2Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
21.95
-
-
... More
Supply and filling of foundation and basement and trenches with Excavated Earth in layers of not more than 15cm thick, well watered,rammed and consolidated complying with standard specification etc.,complete.
67.4
-
-
... More
Supply and filling of good gritty gravel from approved quarry to work site including cost and conveyance of all charges etc complete.
50.08
-
-
... More
Supplying, fabricating and placing in position mild steel/Ribbed tor steel rods for all RCC works including cost of steel and binding wire also in all floors, complete complying with standard specfication.
7.56
-
-
... More
Supplying and erecting CENTERING for sides and soffits including supports and strutting upto 3.29 m high for plane surfaces such as RCC SLABS, RECTANGULAR BEAMS, TEE or ELL BEAMS, LINTELS, canopy etc., in all floors with all cross bracings using mild steel sheets of size 90cm x 60cm and BG 10 stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over countrywood joists of size 10cm x 6.50cm spaced at about 90cm centre to centre and supported by casuarian props of 10cm to 13cm dia spaced at 75cm centre to centre etc., complete
99.15
-
-
... More
Square and Rectanglar column
266.66
-
-
... More
REINFORCED CEMENT CONCRETE 1:1.5:3 mix using 20mm gauge hand broken hard granite stone jelly for FOUNDATION FOOTINGS including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
39.55
-
-
... More
Roof Beam
31.24
-
-
... More
BRICK WORK in cement mortar 1:5 (One cement and five sand) using second class country bricks of size 23cm x 11cm x 7cm for the following including curing etc., complete complying with standard specifications. (Masonry projections wherever necessary for obtaining required elevation shall be done without extra cost).
7.33
-
-
... More
Ramp wall
23.37
-
-
... More
Providing and constructing 110mm brick masonry in C.M 1:3 for partition wall using wall burnt best quality bricks incuding cost for materials & labour charges etc complete
49.83
-
-
... More
PLASTERING with cement mortar 1:5 (one cement and five sand)12mm thick in all floors complying with standard specifications.
439.34
-
-
... More
Providing wall putty finishung including all cost etc
123.61
-
-
... More
Fabrication and supply of M.S door, Window including cost and conveyance of all charges etc complete Steel Door
5.04
-
-
... More
Steel Window
11.52
-
-
... More
WEATHERING COURSE CONCRETE using best quality broken brick jelly of size 20mm uniform gauge in pure slaked lime (no sand to be added) over the RCC roof slabs in the proportion of brick jelly to lime being 32:12.5 by volume and laid in a single layer and consolidated to the required designed and finished thickness by beating the concrete with wooden beaters if approved pattern keeping the surface constantly wet by sprinkling lime jaggery water as per standard specification etc., complete as directed by the departmental officers.
7.94
-
-
... More
Finishing the top of roof with one course of PRESSED TILES of size 23cm x 23cm x 2cm of approved quality laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight of cement used and the top pointed with same mortar mixed with redoxide
102.76
-
-
... More
Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
64.4
-
-
... More
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site
42.58
-
-
... More
Oil bound distemper painting over priming coat including cost and conveyance of all materials and labour charges etc complete.
243.56
-
-
... More
Exterior Emulsion Two coats over priming coat including cost and conveyance of all materials and labour charges etc complete.
231.39
-
-
... More
Painting two coats using Ist quality readymix enamel paint of approved colour over new iron work including cost and conveyance and all labour charges etc.
38.01
-
-
... More
Provision for rainwater downfall pipe etc complete.
18
-
-
... More
Towards the cost for BALA Painting including painting, lettering and art for learning activities approved by the department including of all charges etc complete.
1
-
-
... More
Towards the cost for supply and fixing of magnetic green fibre board including of all charges etc complete.
2
-
-
... More
Provisions for Cubboard& lock arrangements for Teacher ( As per sub estimate)
-
-
-
... More
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
0.22
-
-
... More
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
4.26
-
-
... More
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
4.05
-
-
... More
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
4.26
-
-
... More
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work (P. No.52 sl. No.124)
3.15
-
-
... More
Provisions for Cubboard arrangements for Students ( As per sub estimate)
-
-
-
... More
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
0.22
-
-
... More
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
4.26
-
-
... More
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
4.05
-
-
... More
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
4.26
-
-
... More
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work (P. No.52 sl. No.124)
3.15
-
-
... More
Provisions for Cubboard& lock arrangements for Teacher ( As per sub estimate)
-
-
-
... More
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
0.22
-
-
... More
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
4.26
-
-
... More
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
4.05
-
-
... More
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
4.26
-
-
... More
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work (P. No.52 sl. No.124)
3.15
-
-
... More
Provisions for Cubboard arrangements for Students ( As per sub estimate)
-
-
-
... More
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
0.22
-
-
... More
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
4.26
-
-
... More
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
4.05
-
-
... More
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
4.26
-
-
... More
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work (P. No.52 sl. No.124)
3.15
-
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements