Rural Development And Panchayat Raj Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date27 Dec 2024
Closing Date10 Jan 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Strengthening To The Road From Thittaikiraipatti To Omaiyur Road Km 0/000 - 1/740 At Kollihills Block In Namakkal District With Five Year Maintenance Pkg.no . 03/nkl/nabard Ridf Xxx 2024-25

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3

-

-

-

... More
Km 0/00 - 1/000

81.76

-

-

... More
Km 1/00 - 1/740

42.35

-

-

... More
Construction of embankment using tractor with grader with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with Cut Earth)

-

-

-

... More
Km 0/00 - 1/000

336.41

-

-

... More
Km 1/00 - 1/740

227.84

-

-

... More
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS

-

-

-

... More
Km 0/00 - 1/000

167.28

-

-

... More
Km 1/00 - 1/740

123.96

-

-

... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.

-

-

-

... More
Km 0/00 - 1/000

584.52

-

-

... More
Km 1/00 - 1/740

439.78

-

-

... More
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.

-

-

-

... More
Km 0/00 - 1/000

3896.78

-

-

... More
Km 1/00 - 1/740

2931.87

-

-

... More
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.

-

-

-

... More
Km 0/00 - 1/000

3929.4

-

-

... More
Km 1/00 - 1/740

2952.12

-

-

... More
Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher, vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
Km 0/00 - 1/000

98.24

-

-

... More
Km 1/00 - 1/740

73.8

-

-

... More
Metal Beam Crash Barrier Type - A, "W" Double Guard Providing and erecting Single sided Double Guard Metal Beam Crash Barrier System 1.70m high, comprising of 3mm thick wall "W' beams posts and spacer channels shall be mase by cold roll forming using HR conform to IS 5986 Fe 410/360 and dip galvanizes having Zinc Mass of 550gms/sqm, minimum 950mml above road / ground level fixed on ISMC series channel vertical post 150 X 75 X 5mm spaced 2m center to center 312mm X 83mm fiange width X 3mm thick, 4318mm long post directty embedded in the concrete (M15) pit size 350 X 350 X 800mm for a depth of 750mm below ground, All fixing bolts and nuts hot dip galvanized conforming to IS: 1367 clause 4.60 all complete as per Technical Specification and as directed by the Engineer-in-charge

-

-

-

... More
Km 0/00 - 1/740

250

-

-

... More
Providing and Fixing Name board

1

-

-

... More
Providing and fixing of Retro Reflectorised Cautionary, Mandatory Signs with Definition Plate made out of High Intensity Grade Prismatic Sheeting conforming to IRC-67:2010 & ASTM D 4956-09,Type IV Specification and Fixed over 1.5 mm thick Aluminium Sheet Fixed on back support Frame of 25mm x 25mm x 3mm Mild steel angle and supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45cm x 45cm x 60cm below Ground Level etc Complete including 7 years warranty for the Retro Reflective Sheeting as per clause 6.9 of IRC 67-2010 Specification (as per MORT & Spec. No. 801)

-

-

-

... More
90 Cm Equilateral triangle (Cautionary) sign Board

24

-

-

... More
60 Cm Circular (Mandatory) sign Board

7

-

-

... More
Road Studs

174

-

-

... More
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface

348

-

-

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703

-

-

-

... More
Ordinary Kilometer Stone (precast)

1

-

-

... More
200 m stone (precast)

7

-

-

... More
Guard Stone(precast)

60

-

-

... More
Construction of 1.50m RCC Slab Culvert CH 435m (Sub ESTIMAT)

-

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B etc

41.89

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Levelling course

4.19

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Foundation

28.67

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Foundation

25

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Foundation

3.36

-

-

... More
Reinforced Cement concrete 1:11/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Foundation

3.31

-

-

... More
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and superstructure for Abutment /pier using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers etc.

-

-

-

... More
Below Sill

42

-

-

... More
Above Sill

96.34

-

-

... More
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works

0.35

-

-

... More
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing

12

-

-

... More
Collection and supply of Gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

6.14

-

-

... More
Construction of Hardbed at ch 570 (Sub ESTIMAT)

-

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B etc

51.98

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Foundation

10.4

-

-

... More
Cement concrete 1:2:4 mix using HBG metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Foundation

23.49

-

-

... More
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)

26.43

-

-

... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.

23.18

-

-

... More
Construction of un-reinforced dowel jointed at expansion and construction joint only plain cement concrete pavement thickness as per design over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M30 grade coarse and fine aggregates conforming to IS 383 maximum size of coarse aggregate not exceeding 25mm mixed in a concrete mixer of not less than etc

30.6

-

-

... More
Centering for the sides and soffits CC items including all cost and conveyance and all labour charges etc., complete.

-

-

-

... More
Below Sill

132.12

-

-

... More
Above Sill

12.24

-

-

... More
Construction of Retaining Wall

-

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B

-

-

-

... More
Ch 0-11 Right side

18.08

-

-

... More
Ch 28-83 Right side

93.06

-

-

... More
Ch 935-953 Left side

33.91

-

-

... More
Ch 1090-1165 Left side

130.5

-

-

... More
Ch 1610-1633 Right side

41.12

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.

-

-

-

... More
Ch 0-11 Right side

1.51

-

-

... More
Ch 28-83 Right side

7.76

-

-

... More
Ch 935-953 Left side

2.83

-

-

... More
Ch 1090-1165 Left side

10.88

-

-

... More
Ch 1610-1633 Right side

3.43

-

-

... More
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. (Below Sill)

-

-

-

... More
Ch 0-11 Right side

4.52

-

-

... More
Ch 28-83 Right side

23.27

-

-

... More
Ch 935-953 Left side

8.48

-

-

... More
Ch 1090-1165 Left side

32.63

-

-

... More
Ch 1610-1633 Right side

10.28

-

-

... More
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. (Above Sill)

-

-

-

... More
Ch 0-11 Right side

12.95

-

-

... More
Ch 28-83 Right side

71.09

-

-

... More
Ch 935-953 Left side

30.76

-

-

... More
Ch 1090-1165 Left side

104.44

-

-

... More
Ch 1610-1633 Right side

34.09

-

-

... More
Centering for the sides and soffits CC items including all cost and conveyance and all labour charges etc., complete. (Below Sill)

-

-

-

... More
Ch 0-11 Right side

26.25

-

-

... More
Ch 28-83 Right side

123.07

-

-

... More
Ch 935-953 Left side

42.14

-

-

... More
Ch 1090-1165 Left side

167.25

-

-

... More
Ch 1610-1633 Right side

52.95

-

-

... More
Centering for the sides and soffits CC items including all cost and conveyance and all labour charges etc., complete. (Above Sill)

-

-

-

... More
Ch 0-11 Right side

29.52

-

-

... More
Ch 28-83 Right side

150.6

-

-

... More
Ch 935-953 Left side

68.78

-

-

... More
Ch 1090-1165 Left side

236.26

-

-

... More
Ch 1610-1633 Right side

76.5

-

-

... More
Construction of Drain

-

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B

-

-

-

... More
Ch 0-1000 LHS

76.12

-

-

... More
Ch 1000-1740 LHS

92.33

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. (Below Sill)

-

-

-

... More
Footing

-

-

-

... More
Ch 0-1000 LHS

76.11

-

-

... More
Ch 1000-1740 LHS

92.33

-

-

... More
Super Structure

-

-

-

... More
Ch 0-1000 LHS

69.2

-

-

... More
Ch 1000-1740 LHS

83.94

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.

-

-

-

... More
Ch 0-1000 LHS

34.6

-

-

... More
Ch 1000-1740 LHS

41.97

-

-

... More
Cement concrete 1:2:4 mix using HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. (Above Sill)

-

-

-

... More
Ch 0-1000 LHS

23.07

-

-

... More
Ch 1000-1740 LHS

27.98

-

-

... More
Centering for the sides and soffits CC items including all cost and conveyance and all labour charges etc., complete. (Below Sill)

-

-

-

... More
Ch 0-1000 LHS

288.72

-

-

... More
Ch 1000-1740 LHS

337.71

-

-

... More
Centering for the sides and soffits CC items including all cost and conveyance and all labour charges etc., complete. (Above Sill)

-

-

-

... More
Ch 0-1000 LHS

577.08

-

-

... More
Ch 1000-1740 LHS

675.06

-

-

... More
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m

-

-

-

... More
For the First Year from the date of completion of work

1.74

-

-

... More
For the Second Year from the date of cpmpletion of work

1.74

-

-

... More
For the Third Year from the date of completion of work

1.74

-

-

... More
For the Fourth Year from the date of completion of work

1.74

-

-

... More
For the Fifth Year from the date of completion of work

1.74

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.