Rural Development And Panchayat Raj Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Civil And Construction
Solid Waste Management
Water Storage And Supply
Eprocure
Opening Date25 May 2023
Closing Date25 May 2023
Tender Amount₹ 31,20,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Centering Charges incuding cost and conveyance of all materials to site etc

343.39

-

-

... More
Centering Charges incuding cost and conveyance of all materials to site etc

80.94

-

-

... More
Fabrication and Placing in position of RTS bars etc complete

3.15

-

-

... More
Reinforced cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation

55.67

-

-

... More
Providing granolethic floor finish ISS metal to 25mm thick including cost and conveyance of all materials to siteand all labour charges for mixing, laying, curing etc complete .

31.94

-

-

... More
Supplying and fixing in position C.I.Manhole covers (heavy duty) mof various sizes of best approved quality and as per standard specificationsetc., complete.0.6X0.6M Size etc., complete.

6

-

-

... More
collection and Supply of Gritty gravel filling etc.

8.1

-

-

... More
Subestimate Sewerline

-

-

-

... More
Supply and delivery of 160 mm dia U PVC Non pressure pipe SN8-SDR 34 (S 16.5) Pipe

380

-

-

... More
Earth work excavation of Trenches as per standard specificationsin all soilin Medium rock, and Dense Medium Rock not requiring Blasting.

262.2

-

-

... More
Laying and Jointing of PVC pipes as per standard specifications

380

-

-

... More
Refilling the trenches with excavated earth as per standard specifications

259.22

-

-

... More
Subestimate Machine Hole(0.75m)

-

-

-

... More
Earth work excavation and depositing on bank with an initial lead of 10m and initial lift of 2m inhard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

25.64

-

-

... More
Levelling coarse with P.C.C 1:4:8 (one cement, four sand and eight coarse aggregate) using S.R. cement and 40 mm H.B.G stone including mixing concrete, laying, curing and compacting of concrete etc., complete and as directed by the Departmental Officers.

2.33

-

-

... More
P.C.C 1:2:4 (one cement, two sand and four coarse aggregate) for base slab using S.R. cement and 20 mm H.B.G stone including mixing concrete, laying, curing and compacting of concrete etc., complete and as directed by the Departmental Officers.

5.83

-

-

... More
Brick work in CM 1:3 (one cement and three sand) using S.R. cement and Bricks- II class Table Moulded (chamber burnt) of size 9" X 4 3/8" X 2 3/4" including cost of all materials, labour charges, curing etc., complete and as directed by Departmental Officers.

4.57

-

-

... More
Inner plastering with CM 1:3 (one cement and three sand) 20mm thick using S.R. cement including cost of materials, labour charges for finishing, curing etc., complete and as directed by Departmental Officers.

18.72

-

-

... More
Outer plastering with CM 1:5 (one cement and five sand) 12mm thick using S.R. cement including cost of materials, labour charges for finishing, curing etc., complete and as directed by Departmental Officers.

29.74

-

-

... More
Benching - P.C.C 1:2:4 (one cement, two sand and four coarse aggregate) using S.R. cement and 20 mm H.B.G stone including mixing concrete, laying, curing and compacting of concrete etc., complete and as directed by the Departmental Officers.

1.04

-

-

... More
M30 using S.R. cement and 20mm size hard blue granite stone (machine crushed) excluding cost of reinforcement, fabrication and placing the grills in position and excluding cost of shoring and strutting but including curing, finishing and mixing concrete, using mechanical mixer machine and compaction by machanical vibrator etc., complete and as directed by Departmental Officers.

1.69

-

-

... More
Supply and fixing of PVC encapsulated steps ( 1 No at 30 cm interval ) in the manhole.

18

-

-

... More
Refilling with excavated earth (other than sand) complying with standard specifications for filling the foundations including stacking, watering & consolidation etc. complete as directed by Departmental Officers.

8.5

-

-

... More
Supplying fabricating and placing in position of RTS grills at all heights for reinforcement including cost of steel for all works and labour charges including cost of binding wire etc., complete for all RCC works and as directed by Departmental Officers. upto 16mm dia.

0.99

-

-

... More
F.R.C Manhole frame with cover (60cm dia heavy duty )

9

-

-

... More
Subestimate Machine Hole(01.25m)

-

-

-

... More
Earth work excavation and depositing on bank with an initial lead of 10m and initial lift of 2m inhard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B

37.74

-

-

... More
Levelling coarse with P.C.C 1:4:8 (one cement, four sand and eight coarse aggregate) using S.R. cement and 40 mm H.B.G stone including mixing concrete, laying, curing and compacting of concrete etc., complete and as directed by the Departmental Officers.

2.6

-

-

... More
P.C.C 1:2:4 (one cement, two sand and four coarse aggregate) for base slab using S.R. cement and 20 mm H.B.G stone including mixing concrete, laying, curing and compacting of concrete etc., complete and as directed by the Departmental Officers.

6.51

-

-

... More
Brick work in CM 1:3 (one cement and three sand) using S.R. cement and Bricks- II class Table Moulded (chamber burnt) of size 9" X 4 3/8" X 2 3/4" including cost of all materials, labour charges, curing etc., complete and as directed by Departmental Officers.

9.32

-

-

... More
Inner plastering with CM 1:3 (one cement and three sand) 20mm thick using S.R. cement including cost of materials, labour charges for finishing, curing etc., complete and as directed by Departmental Officers.

37.16

-

-

... More
Outer plastering with CM 1:5 (one cement and five sand) 12mm thick using S.R. cement including cost of materials, labour charges for finishing, curing etc., complete and as directed by Departmental Officers.

54.43

-

-

... More
Benching - P.C.C 1:2:4 (one cement, two sand and four coarse aggregate) using S.R. cement and 20 mm H.B.G stone including mixing concrete, laying, curing and compacting of concrete etc., complete and as directed by the Departmental Officers.

1.46

-

-

... More
M30 using S.R. cement and 20mm size hard blue granite stone (machine crushed) excluding cost of reinforcement, fabrication and placing the grills in position and excluding cost of shoring and strutting but including curing, finishing and mixing concrete, using mechanical mixer machine and compaction by machanical vibrator etc., complete and as directed by Departmental Officers.

1.87

-

-

... More
Supply and fixing of PVC encapsulated steps ( 1 No at 30 cm interval ) in the manhole.

24

-

-

... More
Refilling with excavated earth (other than sand) complying with standard specifications for filling the foundations including stacking, watering & consolidation etc. complete as directed by Departmental Officers.

7.85

-

-

... More
Supplying fabricating and placing in position of RTS grills at all heights for reinforcement including cost of steel for all works and labour charges including cost of binding wire etc., complete for all RCC works and as directed by Departmental Officers. upto 16mm dia.

1.11

-

-

... More
F.R.C Manhole frame with cover (60cm dia heavy duty )

8

-

-

... More
Subestimate Ventilating Shaft

-

-

-

... More
Earth work excavation of Trenches as per standard specificationsin all soil for pipe laying works in Medium and Dense Medium Not Requiring Blasting

22.68

-

-

... More
Earth work excavation for Pedastal Concrete to support Ventilating shaft.

2.92

-

-

... More
PCC 1:2:4 using 20mm metal for Pedastal for Ventilating shaft.

3.05

-

-

... More
(a)Centering for Pedastal above GL

4.32

-

-

... More
(b)Below GL

19.44

-

-

... More
Laying and Jointing of 160MM U PVC pipes as per standard specifications

36

-

-

... More
Sand Bedding for the pipeline as per standard specifications

1.73

-

-

... More
Refilling the trenches with excavated earth as per standard specifications

30.77

-

-

... More
Supply and delivery of 160 mm dia U PVC Non pressure pipe SN8-SDR 34 (S 16.5) Pipe

36

-

-

... More
Supply and delivery of 160 mm dia PVC male threaded adaptor

6

-

-

... More
Supply and delivery of 150 mm dia male threaded adaptor

6

-

-

... More
150mm DI Duck Foot Bend

186

-

-

... More
150mm DI Flanged Pipe-5M

6

-

-

... More
150mm flanged copper wire gauge cowl

6

-

-

... More
Jointing 150mm flanges

18

-

-

... More
Sub Estimate House Service Connection

-

-

-

... More
Supply, conveying to site, laying and jointing of 110mm dia UPVC pipes including fixing of DWC pipes in MH and inspection chamber , earthwork excavation including cutting open BT road, refilling of trenches with excavated earth, etc., complete for house service connections from property limits to manholes on sewers. (For 112 HSC of average length 6 m each)

552

-

-

... More
Disposal of surplus excavated earth in pipe laying works, manholes etc.,transporting to the sites specified by Engineer within 3 Km lead, including loading, spreading etc., complete and as directed by the Engineer.

169.93

-

-

... More
Subestimate Inspection Chamber

-

-

-

... More
Earth work excavation for foundation with initial lead of 10 m and initial lift of 2 m in hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size of boulders including refilling the sides of foundation

46.53

-

-

... More
Plain Cement Concrete 1:5:10 using 40 mm HBG for foundation

6.65

-

-

... More
Brick work in C.M 1:5 using Class II Table moulded chamber burnt of size 9" x 4 3/8" x 2.75"

10.72

-

-

... More
M30 Concrete for Precast slab

3.89

-

-

... More
Supplying, fabricating and placing in position of steel rods for all RCC works including cost of steel and binding wire etc. complete complying with standard specification for Precast Cover slab including Handles

299.92

-

-

... More
Plastering in cement mortar 1:5-12mm thick for side wall & bottom

258.02

-

-

... More
Moulding charges for precast slab for cover slab bottom & side (from 40 uses calculate for 1 use)

1.56

-

-

... More
Cutting, Welding, Bending including cost of crews etc., (from 40 uses calculate for 1)bitumen sprayer etc. complete km 0/0-1/080

1.56

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.