Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Road Construction
Eprocure
Opening Date1 Jul 2024
Closing Date19 Jul 2024
Tender Amount₹ 1,28,00,000
Costs
EMD
₹ 1,29,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_458572_1Bid Award Id
ViewTender No
DIPR/2074/Tender/2024 Dt 26.06.2024Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Picking old metalled / BT surface upto 10cm thick as directed by the departmental officers
-
-
-
Km.0/0 - 1/150
1437.5
-
-
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
-
-
-
Km.0/0 - 1/150
517.5
-
-
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms
-
-
-
Km-0/0-1/0
150
-
-
Km-1/0-2/0
22.5
-
-
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
-
-
-
Km-0/0-1/0
281.25
-
-
Km-1/0-2/0
42.19
-
-
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
-
-
-
Km-0/0-1/0
281.25
-
-
Km-1/0-2/0
42.19
-
-
Applying tack coat over Un Primed WMB/ WMM surface at 7Kg of SS-1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
-
-
-
Km.0/0 - 1/150
4312.5
-
-
Applying tack coat over Un Primed WMB/ WMM surface at 2.5Kg / 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
-
-
-
Km.0/0 - 1/150
4312.5
-
-
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste based on Job Mix Formula mixed in hot mix plant of drum type in one layer for overlay as shown in drawing using paving Bitumen 60/70 penetration grade (IS : 73) and aggregates conforming to grading 2 of Table 500 - 15 of MORT& H specifications and BC shall be laid using sensor paver finisher to the required level, grade and compacting to atleast 98% of laboratory Marshall density as per clause 508 of MORT&H Specifications with all leads & lifts etc., complete and as directed by the Engineer.
-
-
-
Km.0/0 - 1/150
107.81
-
-
60cm Equilateral Triangle cautionary Sign board
2
-
-
Providing HM stones (0.75*0.23*0.10)
5
-
-
Providing KM stones (1.65*0.45*0.15)
1
-
-
Road marking with hot applied thermoplastic compound with reflecting glss beads on bituminous surface
230
-
-
Providision For Name Board and Information Board
1
-
-
Strengthening of Road from Thiruvidaikazhi Poosathanur Road Km - 0\0-1\800 in Thiruvidaikazhi Panchayat
-
-
-
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,Light jungle ,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
-
-
-
Km.0/0 - 1/800
1296
-
-
Picking old metalled / BT surface upto 10cm thick as directed by the departmental officers
-
-
-
Km.0/0 - 1/800
1800
-
-
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
-
-
-
Km.0/0 - 1/800
648
-
-
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms
-
-
-
Km-0/0-1/0
120
-
-
Km-1/0-1/800
96
-
-
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
-
-
-
Km-0/0-1/0
225
-
-
Km-1/0-1/800
180
-
-
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
-
-
-
Km-0/0-1/0
225
-
-
Km-1/0-1/800
180
-
-
Applying tack coat over Un Primed WMB/ WMM surface at 7Kg of SS-1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
-
-
-
Km.0/0 - 1/800
5400
-
-
Applying tack coat over Un Primed WMB/ WMM surface at 2.5Kg / 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.
-
-
-
Km.0/0 - 1/800
5400
-
-
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste based on Job Mix Formula mixed in hot mix plant of drum type in one layer for overlay as shown in drawing using paving Bitumen 60/70 penetration grade (IS : 73) and aggregates conforming to grading 2 of Table 500 - 15 of MORT& H specifications and BC shall be laid using sensor paver finisher to the required level, grade and compacting to atleast 98% of laboratory Marshall density as per clause 508 of MORT&H Specifications with all leads & lifts etc., complete and as directed by the Engineer.
-
-
-
Km.0/0 - 1/800
135
-
-
60cm Equilateral Triangle cautionary Sign board
4
-
-
Providing HM stones (0.75*0.23*0.10)
8
-
-
Providing KM stones (1.65*0.45*0.15)
1
-
-
Road marking with hot applied thermoplastic compound with reflecting glss beads on bituminous surface
360
-
-
Providision For Name Board and Information Board
1
-
-
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements