Rural Development And Panchayat Raj Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date6 Jul 2024
Closing Date12 Jul 2024
Tender Amount₹ 1,17,47,541 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
km 0/0 - 2/730

977.54

-

-

... More
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.

-

-

-

... More
km 0/0 - 1/00

373.91

-

-

... More
km 1/0 - 1/200

371.7

-

-

... More
km 2/0 - 2/730

272.66

-

-

... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.

-

-

-

... More
km 0/0 - 1/00

90

-

-

... More
km 1/0 - 1/200

88.88

-

-

... More
km 2/0 - 2/730

53.44

-

-

... More
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.

-

-

-

... More
km 0/0 - 2/730

1548.75

-

-

... More
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,

-

-

-

... More
km 0/0 - 2/730

1548.75

-

-

... More
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal

-

-

-

... More
km 0/0 - 1/00

6.09

-

-

... More
km 1/0 - 1/200

6.08

-

-

... More
km 2/0 - 2/730

1.93

-

-

... More
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal

-

-

-

... More
km 0/0 - 1/00

3.08

-

-

... More
km 1/0 - 1/200

3.43

-

-

... More
km 2/0 - 2/730

1.13

-

-

... More
Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.

-

-

-

... More
km 0/0 - 2/730

8688.75

-

-

... More
BITUMINOUS MACADAM 50 MM THICK USING cmp (Grade-II) Providing and laying Bituminious Macadam to 50mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
km 0/0 - 1/00

187.5

-

-

... More
km 1/0 - 1/200

187.5

-

-

... More
km 2/0 - 2/730

136.88

-

-

... More
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5

-

-

-

... More
km 0/0 - 1/00

93.75

-

-

... More
km 1/0 - 1/200

93.75

-

-

... More
km 2/0 - 2/730

68.44

-

-

... More
Road marking with Hot Applied Thermopalstic compound with reflectorising Glass beads on Bituminous surface

546

-

-

... More
Kilometre stone

2

-

-

... More
Hecta metre stone

11

-

-

... More
Providing and fixing of sign board for standard specification

4

-

-

... More
Providing and fixing of name board for standard specification

1

-

-

... More
1.5m RCC Span Culvert Chainage 286m

-

-

-

... More
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting butinclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation as per standard specification

113.52

-

-

... More
Cement Concrete 1:4:8 mix Using Hand Broken Granite 40 mm stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick. Compacting etc., complete complying within standard specification

4.19

-

-

... More
Concrete concrete1:3:6 using 40mm Hard Broken granite stone jelly for foundation including watering whenever necessary and ladi in layers not more than 15cm thick compacting etc,.complete complying with standard specifications

28.67

-

-

... More
Concrete concrete1:2:4 using 20mm Hard Broken granite stone jelly for foundation including watering whenever necessary and ladi in layers not more than 15cm thick compacting etc,.complete complying with standard specifications

25

-

-

... More
Concrete concrete1:2:4 using 20mm Hard Broken granite stone jelly for foundation including watering whenever necessary and ladi in layers not more than 15cm thick compacting etc,.complete complying with standard specifications

3.36

-

-

... More
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete

-

-

-

... More
BELOW SILL LEVEL

42

-

-

... More
ABOVE SILL LEVEL

96.34

-

-

... More
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3

3.31

-

-

... More
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works

0.35

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

3

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing

12

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

6.14

-

-

... More
1.5m RCC Span Culvert Chainage 2622m

-

-

-

... More
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting butinclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation as per standard specification

113.52

-

-

... More
Cement Concrete 1:4:8 mix Using Hand Broken Granite 40 mm stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick. Compacting etc., complete complying within standard specification

4.19

-

-

... More
Concrete concrete1:3:6 using 40mm Hard Broken granite stone jelly for foundation including watering whenever necessary and ladi in layers not more than 15cm thick compacting etc,.complete complying with standard specifications

28.67

-

-

... More
Concrete concrete1:2:4 using 20mm Hard Broken granite stone jelly for foundation including watering whenever necessary and ladi in layers not more than 15cm thick compacting etc,.complete complying with standard specifications

25

-

-

... More
Concrete concrete1:2:4 using 20mm Hard Broken granite stone jelly for foundation including watering whenever necessary and ladi in layers not more than 15cm thick compacting etc,.complete complying with standard specifications

3.36

-

-

... More
Supplying and erecting centering shuttering including necessary supports for including cost and conveyance of all materials to site and all labour charges etc complete

-

-

-

... More
BELOW SILL LEVEL

42

-

-

... More
ABOVE SILL LEVEL

96.34

-

-

... More
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centring and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3

3.31

-

-

... More
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works

0.35

-

-

... More
Providing and fixing 15mm Bitumen felt for expansion joint Between Dirtwall &Deck slab

3

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing

12

-

-

... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,

6.14

-

-

-

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.