Rural Development And Panchayat Raj Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Civil And Construction
Water Storage And Supply
Eprocure
Opening Date1 Jul 2022
Closing Date13 Jul 2022
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Uthamapalayam -package No-tni/agamt/water Bodies/upm-1

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement Concrete 1:4:8 (One Cement, Four sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consoli

5.54

-

-

... More
Random Rubble Masonry in Cement Mortar 1:5 (One Cement and five sand) for Foundation and basement including necessary provision of bond stone with simultaneous flush pointing with the same mortar above ground level complying with standard specification Rate for 10M3

14.04

-

-

... More
Supplying and erecting, centering for sides and soffits including supports and strutting upto 3.29m height for plane surfaces as detailed below in all floors with all cross bracings using mild steel sheet of 90cm x60cm BG 10 guage stiffened with welded M.

74.04

-

-

... More
Cement Concrete 1:3:6 (One Cement, Three sand and Six hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolid

28.05

-

-

... More
Provision for name board

1

-

-

... More
Improvements of AGAMT Oorani With Silt Trap and Protection wall and desilting of supply channel at T.Renganathapuram of T.Renganathapuram Panchayat.

-

-

-

... More
Clearing the light jungle and removed away from the site including all cutting charges and all labour charges as per standard specification.

660

-

-

... More
Earthwork excavation for foundation in all soils and sub soils and to full depth as may be direacted except in rock requiring blasting but inclusive of shoring, strutting and baling water wherver necessary and depositing the surplus earth within the comp

1109.69

-

-

... More
Earthwork excavation for foundation in all soils and sub soils and to full depth as may be direacted except in rock requiring blasting but inclusive of shoring, strutting and baling water wherver necessary and depositing the surplus earth within the comp

6.75

-

-

... More
Cement Concrete 1:4:8 (One Cement, Four sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consoli

2.12

-

-

... More
Rough stone dry packing using rough stone,wedges, including cost and conveyance if all materials to site and all labour charges for mixing laying finishing and curing etc., completed.

31.05

-

-

... More
R.R.Pointing including cost and conveyance if all materials to site and all labour charges for mixing laying finishing and curing etc., completed.

45

-

-

... More
Supplying and erecting, centering for sides and soffits including supports and strutting upto 3.29m height for plane surfaces as detailed below in all floors with all cross bracings using mild steel sheet of 90cm x60cm BG 10 guage stiffened with welded M.

78.21

-

-

... More
Cement Concrete 1:3:6 (One Cement, Three sand and Six hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolid

17.27

-

-

... More
Provision for name board

1

-

-

... More
Improvements to the AGAMT Oorani with Toe wall in T.Meenatchipuram Habitation of T.Meenatchipuram Panchayat

-

-

-

... More
Clearing the light jungle and removed away from the site including all cutting charges and all labour charges as per standard specification.

990

-

-

... More
Earthwork excavation for foundation in all soils and sub soils and to full depth as may be direacted except in rock requiring blasting but inclusive of shoring, strutting and baling water wherver necessary and depositing the surplus earth within the comp-Deploying machinary

865.5

-

-

... More
Earthwork excavation for foundation in all soils and sub soils and to full depth as may be direacted except in rock requiring blasting but inclusive of shoring, strutting and baling water wherver necessary and depositing the surplus earth within the comp

41.99

-

-

... More
Cement Concrete 1:4:8 (One Cement, Four sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consoli

6.17

-

-

... More
Supplying and erecting, centering for sides and soffits including supports and strutting upto 3.29m height for plane surfaces as detailed below in all floors with all cross bracings using mild steel sheet of 90cm x60cm BG 10 guage stiffened with welded M.

181.5

-

-

... More
Cement Concrete 1:3:6 (One Cement, Three sand and Six hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidation etc., complete.

48.84

-

-

... More
Cement Concrete 1:3:6 (One Cement, Three sand and six hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidation etc., complete.

5

-

-

... More
Rough stone dry packing using rough stone,wedges, including cost and conveyance if all materials to site and all labour charges for mixing laying finishing and curing etc., completed.

13.8

-

-

... More
Provision for name board

1

-

-

... More
Renovation And Rehabilitation and desilting of Aattukaran Kulam With Silt Trop And Protection Wall At T.Meenatchipuram Panchayat

-

-

-

... More
clearing heavy jungle with uproorting

3960

-

-

... More
Earthworkin all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earthmoving machinering and tippers including benching formation of bunds , breaking clods,sectioning etc , complete (including watering and consolidation)

1591.59

-

-

... More
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete. having width up to 3m

1591.59

-

-

... More
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earthmoving machinering and tippers including inlet channel cutting,sectioningh etc , complete

540

-

-

... More
Construction of Silt Trop in Aattukaran Kulam

-

-

-

... More
Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B for foundation

23.89

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.

4.73

-

-

... More
Centering and shuttering charges for Culvert side work including cost and conveyance of all labour charges

88.32

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.

33.05

-

-

... More
CC 1:2 :4 mix using 20 mm iSS metal including cost and conveyance if all materials to site and all labour charges for mixing laying finishing and curing etc., completed.

1

-

-

... More
Rough stone dry packing using rough stone,wedges, including cost and conveyance if all materials to site and all labour charges for mixing laying finishing and curing etc., completed.

6.15

-

-

... More
Re-filling with excavated earth and all other labour charges as per standard specification etc.

4.35

-

-

... More
Construction of -Sub protection wall -Sub stimate

-

-

-

... More
Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B for foundation

16.8

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.

2.4

-

-

... More
Centering and shuttering charges for Culvert side work including cost and conveyance of all labour charges

43.2

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.

37.8

-

-

... More
Rough stone dry packing using rough stone,wedges, including cost and conveyance if all materials to site and all labour charges for mixing laying finishing and curing etc., completed.

6.15

-

-

... More
Re-filling with excavated earth and all other labour charges as per standard specification etc.

4.35

-

-

... More
Provision for name board

1

-

-

... More
Improvements to the AGAMT Oorani Toe Wall and Rough stone Rivetment in Lakshiminayakanpatty Habitation of Lakshiminayakanpatty Panchayat.

-

-

-

... More
Clearing the light jungle and removed away from the site including all cutting charges and all labour charges as per standard specification.

252

-

-

... More
Earthwork excavation for foundation in all soils and sub soils and to full depth as may be direacted except in rock requiring blasting but inclusive of shoring, strutting and baling water wherver necessary and depositing the surplus earth within the comp

977.4

-

-

... More
Earthwork excavation for foundation in all soils and sub soils and to full depth as may be direacted except in rock requiring blasting but inclusive of shoring, strutting and baling water wherver necessary and depositing the surplus earth within the comp

33.53

-

-

... More
Cement Concrete 1:4:8 (One Cement, Four sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consoli

8.49

-

-

... More
Rough stone dry packing using rough stone,wedges, including cost and conveyance if all materials to site and all labour charges for mixing laying finishing and curing etc., completed.

17.25

-

-

... More
Supplying and erecting, centering for sides and soffits including supports and strutting upto 3.29m height for plane surfaces as detailed below in all floors with all cross bracings using mild steel sheet of 90cm x60cm BG 10 guage stiffened with welded M.

83.7

-

-

... More
Cement Concrete 1:3:6 (One Cement, Three sand and Six hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidation etc., complete.

42.46

-

-

... More
Cement Concrete 1:2:4 (One Cement, Two sand and Four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolida

2

-

-

... More
Provision for name board

1

-

-

... More
Renovation and Rehabilitation of Masanamkulam Kanmai With Surplus Weir In Lakshminaickanpatty Panchayat

-

-

-

... More
clearing heavy jungle with uproorting

4200

-

-

... More
Earthworkin all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earthmoving machinering and tippers including benching formation of bunds , breaking clods,sectioning etc , complete (including watering and consolidation)

3392.39

-

-

... More
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete. having width up to 3m

3392.39

-

-

... More
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earthmoving machinering and tippers including inlet channel cutting,sectioningh etc , complete

112.5

-

-

... More
Construction of Surplus Weir

-

-

-

... More
Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B for foundation

30.84

-

-

... More
Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.

6.34

-

-

... More
Centering and shuttering charges for Culvert side work including cost and conveyance of all labour charges

122

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.

62.31

-

-

... More
CC 1:2 :4 mix using 20 mm iSS metal including cost and conveyance if all materials to site and all labour charges for mixing laying finishing and curing etc., completed.

1.2

-

-

... More
Rough stone dry packing using rough stone,wedges, including cost and conveyance if all materials to site and all labour charges for mixing laying finishing and curing etc., completed.

6.15

-

-

... More
Re-filling with excavated earth and all other labour charges as per standard specification etc.

4.35

-

-

... More
Provision for name board

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.