Rural Development And Panchayat Raj Department Tender
... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Road Construction
Eprocure
Opening Date2 Aug 2023
Closing Date9 Aug 2023
Tender AmountRefer Documents
Costs
EMD
₹ 66,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Tiruvarur District - Mgsmt (25 Per) 2022-23 Road Work - Mannargudi Block - Package - 23
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_RDTN_353754_1Bid Award Id
ViewTender No
DIPR/4156/TENDER/2023/mng23rTender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
-
-
-
... More
Km 0/0 -1/320
1317.1
-
-
... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
-
-
-
... More
Km 0/0 -1/320
355.1
-
-
... More
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
-
-
-
... More
Km 0/0 -1/0
89.71
-
-
... More
Km 1/0 -2/0
28.8
-
-
... More
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
-
-
-
... More
0/0-1/0
185.63
-
-
... More
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
-
-
-
... More
Km 0/0 -1/0
226.41
-
-
... More
Km 1/0 -2/0
72
-
-
... More
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
-
-
-
... More
Km 0/0 -1/0
226.41
-
-
... More
Km 1/0 -2/0
72
-
-
... More
Applying tack coat over WBM surface (not treated with primer) using 2.5 Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
-
-
-
... More
Km 0/0 -1/320
3987.5
-
-
... More
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WBM surface preparatory to another bituminous construction over it.
-
-
-
... More
Km. 0/0-1/320
3987.5
-
-
... More
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
-
-
-
... More
Km. 0/0-1/0
75.69
-
-
... More
Km. 1/0-2/0
24
-
-
... More
Provision of Rumble Strips with premix Bituminous carpet Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20mm high at centre, 250mm wide placed at 1m centre-to-centre approved locations to control speed, marked with while strips of road marking paint.
Rumble Strips = 3 X 3.75 X 0.25 = 2.81
-
-
-
... More
Km 0/0 -1/0
2.81
-
-
... More
Road Marking With Hot Applied Thermoplastic Compound With reflectorising Glass Beads on Bituminous Surface:-
Providing and laying of hot applied thermoplastic compound 2.50mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35, The finished surface to be level uniform and free from streaks and holes etc complete as per MORTH&H specification No.803
-
-
-
... More
Km 0/0 -1/0
200
-
-
... More
Km 1/0 -2/0
64
-
-
... More
Provision for Name board & Citizen information Board
1
-
-
... More
Provision for sign board
1
-
-
... More
Provision for kilometre stones
1
-
-
... More
Provision for Hectametre stones
5
-
-
... More
Construction of1.50m slab culvert @ Ch.0/950
-
-
-
... More
Earth work excavation in Hard stiff clay soil except hard rock requiring bleasting such as soft clay mixed sand as per SS 20B
-
-
-
... More
Ch. 0/950
50.33
-
-
... More
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
-
-
-
... More
Ch. 0/950
4.58
-
-
... More
Cement Concrete 1:4:8 using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour and all other incidental charges
-
-
-
... More
Ch. 0/950
9.15
-
-
... More
C.C. 1:3:6 mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
-
-
-
... More
Ch. 0/950
60.9
-
-
... More
Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete
-
-
-
... More
Abutment wings Ch. 0/950
134.4
-
-
... More
Deck slab Ch. 0/950
12.13
-
-
... More
C.C. 1:2:4 mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
-
-
-
... More
Ch. 0/950
3.36
-
-
... More
C.C. 1:1.5:3 mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
-
-
-
... More
Ch. 0/950
3.31
-
-
... More
Supplying and Fabrication of steel for all RCC works as per the given cost of steel and binding with binding wire etc. Complete std . Specifications.
-
-
-
... More
Ch. 0/950
0.35
-
-
... More
Supplying and fixing 20mm Bitumen Pad including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
-
-
-
... More
Ch. 0/950
15
-
-
... More
Supplying and fixing Tar Paper including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
-
-
-
... More
Ch. 0/950
4.5
-
-
... More
Prviding weepholes in brick masonry plain/ reinfirced concrete abutment wing wall return wall with 100 dia AC pipe extending through the full width of the structure s with slope of 1(V), 20(H) towards the drawing face complete as per drawing.
-
-
-
... More
Ch. 0/950
12
-
-
... More
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
-
-
-
... More
Ch. 0/950
8
-
-
... More
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
-
-
-
... More
1.Strengthening of 29 Nemmeli to karuvakurichi link Road(0/0-1/320) R-153
-
-
-
... More
For the First Year from the date of completion of work
1.32
-
-
... More
For the Second Year from the date of cpmpletion of work
1.32
-
-
... More
For the Third Year from the date of completion of work
1.32
-
-
... More
For the Fourth Year from the date of completion of work
1.32
-
-
... More
For the Fifth Year from the date of completion of work
1.32
-
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements