Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Road Construction
Eprocure
Opening Date30 Dec 2024
Closing Date21 Jan 2025
Tender Amount₹ 1,28,97,000
Costs
EMD
₹ 1,29,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_515182_1Tender No
PDKT/DRDA/NABARD/10Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
KM 0/0-1/000
1253.21
-
-
... More
KM 1/000-2/000
1247.5
-
-
... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
-
-
-
... More
KM 0/0- 1/000
560.4
-
-
... More
KM 1/000 - 2/000
562.39
-
-
... More
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per 10.00 square meter over the WMM surface preparatory to another bituminous construction over it.
-
-
-
... More
KM 0/0- 1/000
3736
-
-
... More
KM 1/000 - 2/000
3749.25
-
-
... More
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
-
-
-
... More
KM 0/0- 1/000
3736
-
-
... More
KM 1/000 - 2/000
3749.25
-
-
... More
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
-
-
-
... More
KM 0/0- 1/000
93.15
-
-
... More
KM 1/000 - 2/000
93.57
-
-
... More
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
-
-
-
... More
KM 0/0- 1/000
414.96
-
-
... More
KM 1/000 - 2/000
416.64
-
-
... More
Provision for KM and HM stones
-
-
-
... More
Kilo metre stone
2
-
-
... More
Hecta metre stone
8
-
-
... More
Provision for Name Board Cum Citizen Board
1
-
-
... More
Provision for 60 cm Equilateral triangle for Cautionary Sign Boards
3
-
-
... More
Road Marking with Hot applied Thermoplastic compound with Reflectorising glass beads on Bituminous surface
400
-
-
... More
Provision for Construction of 1.50m slab culvert@ Ch -400 m
-
-
-
... More
Earth work excavation in all classess of except hard rock requiring blasting with initial lead and life etc., complete for foundation as per SS 20 B
56.55
-
-
... More
Supplying and filling in foundation and besement with Filling m-sand in layers not more 15cm thick well rammed, watered and compacted complying with standard specifications charges complete
4.19
-
-
... More
CC 1:4: 8 mix using 40mm HBG metal including cost and conveyance labour charges etc
8.38
-
-
... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance and labour charges etc.,
34.35
-
-
... More
C.C. 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc complete for superstructure
25
-
-
... More
C.C. 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc complete for bed blocks
3.36
-
-
... More
R C C 1:1.5:3 mix using 20mm ISS & HBG metal including cost and conveyance and labour charges etc., complete for Deckslab
3.31
-
-
... More
supplying and erecting centering shuttering including for soffits of slab of plan surface including shuttering mild steel of size 90x60 cm for boarding laid 3m high using MS sheets of size 25 x 25 x 3 mm laid over w.joints of size 10 x 6.50 cm spaced 75mm c/c complying with standard specification etc.
A
49.34
-
-
96.34
-
-
... More
Cost and supply and fabrication charges for steel including all labour for cleaning the roads straightenning cuting bending to shape in position for laying concrete including typing the rods with annealed binding to shape and tying in position and forming grills for all R.C.C works
0.35
-
-
... More
Collection and supply of well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete
6.14
-
-
... More
Provision for Construction of 1.50m slab culvert@ Ch -550 m
-
-
-
... More
Earth work excavation in all classess of except hard rock requiring blasting with initial lead and life etc., complete for foundation as per SS 20 B
56.55
-
-
... More
Supplying and filling in foundation and besement with Filling m-sand in layers not more 15cm thick well rammed, watered and compacted complying with standard specifications charges complete
4.19
-
-
... More
CC 1:4: 8 mix using 40mm HBG metal including cost and conveyance labour charges etc
8.38
-
-
... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance and labour charges etc.,
34.35
-
-
... More
C.C. 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc complete for superstructure
25
-
-
... More
C.C. 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc complete for bed blocks
3.36
-
-
... More
R C C 1:1.5:3 mix using 20mm ISS & HBG metal including cost and conveyance and labour charges etc., complete for Deckslab
3.31
-
-
... More
supplying and erecting centering shuttering including for soffits of slab of plan surface including shuttering mild steel of size 90x60 cm for boarding laid 3m high using MS sheets of size 25 x 25 x 3 mm laid over w.joints of size 10 x 6.50 cm spaced 75mm c/c complying with standard specification etc.
A
49.34
-
-
96.34
-
-
... More
Cost and supply and fabrication charges for steel including all labour for cleaning the roads straightenning cuting bending to shape in position for laying concrete including typing the rods with annealed binding to shape and tying in position and forming grills for all R.C.C works
0.35
-
-
... More
Collection and supply of well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete
6.14
-
-
... More
Provision for Construction of 1.50m slab culvert@ Ch -810 m
-
-
-
... More
Earth work excavation in all classess of except hard rock requiring blasting with initial lead and life etc., complete for foundation as per SS 20 B
56.55
-
-
... More
Supplying and filling in foundation and besement with Filling m-sand in layers not more 15cm thick well rammed, watered and compacted complying with standard specifications charges complete
4.19
-
-
... More
CC 1:4: 8 mix using 40mm HBG metal including cost and conveyance labour charges etc
8.38
-
-
... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance and labour charges etc.,
34.35
-
-
... More
C.C. 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc complete for superstructure
25
-
-
... More
C.C. 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc complete for bed blocks
3.36
-
-
... More
R C C 1:1.5:3 mix using 20mm ISS & HBG metal including cost and conveyance and labour charges etc., complete for Deckslab
3.31
-
-
... More
supplying and erecting centering shuttering including for soffits of slab of plan surface including shuttering mild steel of size 90x60 cm for boarding laid 3m high using MS sheets of size 25 x 25 x 3 mm laid over w.joints of size 10 x 6.50 cm spaced 75mm c/c complying with standard specification etc.
A
49.34
-
-
96.34
-
-
... More
Cost and supply and fabrication charges for steel including all labour for cleaning the roads straightenning cuting bending to shape in position for laying concrete including typing the rods with annealed binding to shape and tying in position and forming grills for all R.C.C works
0.35
-
-
... More
Collection and supply of well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete
6.14
-
-
... More
Provision for Construction of 1.50m slab culvert@ Ch -1430 m
-
-
-
... More
Earth work excavation in all classess of except hard rock requiring blasting with initial lead and life etc., complete for foundation as per SS 20 B
54.45
-
-
... More
Supplying and filling in foundation and besement with Filling m-sand in layers not more 15cm thick well rammed, watered and compacted complying with standard specifications charges complete
4.19
-
-
... More
CC 1:4: 8 mix using 40mm HBG metal including cost and conveyance labour charges etc
12.57
-
-
... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance and labour charges etc.,
28.67
-
-
... More
C.C. 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc complete for superstructure
25
-
-
... More
C.C. 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc complete for bed blocks
3.36
-
-
... More
R C C 1:1.5:3 mix using 20mm ISS & HBG metal including cost and conveyance and labour charges etc., complete for Deckslab
3.31
-
-
... More
supplying and erecting centering shuttering including for soffits of slab of plan surface including shuttering mild steel of size 90x60 cm for boarding laid 3m high using MS sheets of size 25 x 25 x 3 mm laid over w.joints of size 10 x 6.50 cm spaced 75mm c/c complying with standard specification etc.
A
42
-
-
96.34
-
-
... More
Cost and supply and fabrication charges for steel including all labour for cleaning the roads straightenning cuting bending to shape in position for laying concrete including typing the rods with annealed binding to shape and tying in position and forming grills for all R.C.C works
0.35
-
-
... More
Collection and supply of well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete
6.14
-
-
... More
Provision for Construction of 1.50m slab culvert@ Ch -1990 m
-
-
-
... More
Earth work excavation in all classess of except hard rock requiring blasting with initial lead and life etc., complete for foundation as per SS 20 B
54.45
-
-
... More
Supplying and filling in foundation and besement with Filling m-sand in layers not more 15cm thick well rammed, watered and compacted complying with standard specifications charges complete
4.19
-
-
... More
CC 1:4: 8 mix using 40mm HBG metal including cost and conveyance labour charges etc
12.57
-
-
... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance and labour charges etc.,
28.67
-
-
... More
C.C. 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc complete for superstructure
25
-
-
... More
C.C. 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc complete for bed blocks
3.36
-
-
... More
R C C 1:1.5:3 mix using 20mm ISS & HBG metal including cost and conveyance and labour charges etc., complete for Deckslab
3.31
-
-
... More
supplying and erecting centering shuttering including for soffits of slab of plan surface including shuttering mild steel of size 90x60 cm for boarding laid 3m high using MS sheets of size 25 x 25 x 3 mm laid over w.joints of size 10 x 6.50 cm spaced 75mm c/c complying with standard specification etc.
A
42
-
-
96.34
-
-
... More
Cost and supply and fabrication charges for steel including all labour for cleaning the roads straightenning cuting bending to shape in position for laying concrete including typing the rods with annealed binding to shape and tying in position and forming grills for all R.C.C works
0.35
-
-
... More
Collection and supply of well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete
6.14
-
-
... More
Maintenance of the road
-
-
-
... More
Towards the charges for routline
maintenance of the road work executed
under PMGSY including dressing of berms
by refilling the gully with the earth from
borrow pits, cleaning of wild seasonal
growth on berms, destilting of side drains
and CD works, white washing guard stones,
painting of KM, HM stones, parapets,
cutting of branches of trees, refixing
displaced guard stones, caution boards,
speed limit boards etc., with the periodicity
for the above activities as prescribed in IRCSP-
20:2002 and as directed by the
departmental officers except for the
constructional defects which has to be
rectified by the contractor at his own cost
-
-
-
... More
For the First Year from the date of
completion of work
2
-
-
... More
For the Second Year from the date of
completion of work
2
-
-
... More
For the Third Year from the date of
completion of work
2
-
-
... More
For the Fourth Year from the date of
completion of work
2
-
-
... More
For the Fifth Year from the date of
completion of work
2
-
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%