Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Road Construction
Eprocure
Opening Date27 Dec 2024
Closing Date10 Jan 2025
Tender AmountRefer Documents
Costs
EMD
₹ 1,49,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Strengthening To The Road From Trichy Namakkal Road To Vadavathur Road Km 0/000 - 3/540 At Erumapatty Block In Namakkal District With Five Year Maintenance Pkg.no . 02/nkl/nabard Ridf Xxx 2024-25
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_514458_2Tender No
DIPR/5603/TENDER/2024Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
-
-
-
... More
Km 0/00 - 1/000
48.02
-
-
... More
Km 1/00 - 2/000
46.66
-
-
... More
Km 2/00 - 3/000
46.76
-
-
... More
Km 3/00 - 3/540
21.54
-
-
... More
Construction of embankment using tractor with grader with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with Cut Earth)
-
-
-
... More
Km 0/00 - 1/000
182.74
-
-
... More
Km 1/00 - 2/000
176.95
-
-
... More
Km 2/00 - 3/000
235.46
-
-
... More
Km 3/00 - 3/540
102.43
-
-
... More
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
-
-
-
... More
Km 0/00 - 1/000
336.52
-
-
... More
Km 1/00 - 2/000
337.5
-
-
... More
Km 2/00 - 3/000
337.5
-
-
... More
Km 3/00 - 3/540
181.27
-
-
... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
-
-
-
... More
Km 0/00 - 1/000
577.74
-
-
... More
Km 1/00 - 2/000
562.5
-
-
... More
Km 2/00 - 3/000
568.17
-
-
... More
Km 3/00 - 3/540
318.99
-
-
... More
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
-
-
-
... More
Km 0/00 - 1/000
3851.63
-
-
... More
Km 1/00 - 2/000
3750
-
-
... More
Km 2/00 - 3/000
3787.8
-
-
... More
Km 3/00 - 3/540
2126.63
-
-
... More
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
-
-
-
... More
Km 0/00 - 1/000
3862.5
-
-
... More
Km 1/00 - 2/000
3750
-
-
... More
Km 2/00 - 3/000
3787.8
-
-
... More
Km 3/00 - 3/540
2137.5
-
-
... More
Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher, vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
-
-
-
... More
Km 0/00 - 1/000
96.56
-
-
... More
Km 1/00 - 2/000
93.75
-
-
... More
Km 2/00 - 3/000
94.7
-
-
... More
Km 3/00 - 3/540
53.44
-
-
... More
Providing and fixing of Retro Reflectorised Cautionary, Mandatory Signs with Definition Plate made out of High Intensity Grade Prismatic Sheeting conforming to IRC-67:2010 & ASTM D 4956-09,Type IV Specification and Fixed over 1.5 mm thick Aluminium Sheet Fixed on back support Frame of 25mm x 25mm x 3mm Mild steel angle and supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45cm x 45cm x 60cm below Ground Level etc Complete including 7 years warranty for the Retro Reflective Sheeting as per clause 6.9 of IRC 67-2010 Specification (as per MORT & Spec. No. 801)
-
-
-
... More
60 Cm Equilateral triangle (Cautionary) sign Board
1
-
-
... More
60 Cm Circular (Mandatory) sign Board
14
-
-
... More
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
688
-
-
... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
-
-
-
... More
Ordinary Kilometer Stone (precast)
3
-
-
... More
200 m stone (precast)
14
-
-
... More
Guard Stone(precast)
4
-
-
... More
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
-
-
-
... More
For the First Year from the date of completion of work
3.54
-
-
... More
For the Second Year from the date of cpmpletion of work
3.54
-
-
... More
For the Third Year from the date of completion of work
3.54
-
-
... More
For the Fourth Year from the date of completion of work
3.54
-
-
... More
For the Fifth Year from the date of completion of work
3.54
-
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements