Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Road Construction
Eprocure
Opening Date27 Dec 2024
Closing Date24 Jan 2025
Tender Amount₹ 1,56,59,000
Costs
EMD
₹ 1,57,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Salem District - Attur Block - Strengthening The Road From Karuppanan Kadu To Gandhipuram Km 0/0-2/2 Koolamedu Panchayat In Nabard -ridf-xxx -2024-2025 Package No.12
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_514663_2Tender No
Roc.No.9140/2023/A4Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
-
-
-
... More
Km 0/000 - 2/2
739.05
-
-
... More
Picking the Existing Bituminous Surface to a depth of 100 mm by Mechnical Means and addition of deficit aggregate @ 50% for Construction of granular Sub-base by providing well graded material , Spreading in Uniform layers with motors grader on prepared surface , mixing by mix in place method with rotavator at OMC , and Compacting with vibratory roller to achieve the desired density.
-
-
-
... More
Km 0/000 - 1/000
605.78
-
-
... More
Km 1/000 - 2/000
607.5
-
-
... More
Km 2/000 - 2/200
124.47
-
-
... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
-
-
-
... More
Km 0/000 - 1/000
561.45
-
-
... More
Km 1/000 - 2/000
562.5
-
-
... More
Km 2/000 - 2/200
115.69
-
-
... More
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
-
-
-
... More
Km 0/000 - 2/200
8264.25
-
-
... More
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
-
-
-
... More
Km 0/000 - 2/200
8264.25
-
-
... More
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher, vibratory / phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
-
-
-
... More
Km 0/000 - 1/000
113.27
-
-
... More
Km 1/000 - 2/000
93.75
-
-
... More
Km 2/000 - 2/200
19.28
-
-
... More
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface. Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc complete as per MORT&H specification No.803
-
-
-
... More
Km 0/000 - 1/000
200
-
-
... More
Km 1/000 - 2/000
200
-
-
... More
Km 2/000 - 2/200
38.24
-
-
... More
Provision for HM stone
9
-
-
... More
Provision for KM stone
2
-
-
... More
Provision for Sign Board Charges
6
-
-
... More
Provision for Name Board Charges
1
-
-
... More
1-A) Construction of RCC 3.00 m Span Culvert @ Km 0/600
-
-
-
... More
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement per SS 20 B.
156.82
-
-
... More
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
18.91
-
-
... More
Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete
-
-
-
... More
Below G. Level
66.42
-
-
... More
Above G.Level
181.03
-
-
... More
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for all PCC works including cost and conveyance of all materials to work site from approved quarry including cost of cement which will be supplied departmentally including all labour for mixing laying etc Complete
121.42
-
-
... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
0.85
-
-
... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for all PCC works including cost and conveyance of all materials to work site from approved quarry including cost of cement which will be supplied departmentally including all labour for mixing laying etc Complete
3.9
-
-
... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
8.1
-
-
... More
Collection, supply and laying of gritty gravel within a lead of 1km approved quarry including cost and conveyance etc completed.
12
-
-
... More
Provision for Bitumen Pad
4.5
-
-
... More
Provision for Weep holes
14
-
-
... More
1-B) Construction of RCC 3.00 m Span Culvert @ Km 0/990
-
-
-
... More
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement per SS 20 B.
156.82
-
-
... More
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
18.91
-
-
... More
Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete
-
-
-
... More
Below G. Level
66.42
-
-
... More
Above G.Level
181.03
-
-
... More
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for all PCC works including cost and conveyance of all materials to work site from approved quarry including cost of cement which will be supplied departmentally including all labour for mixing laying etc Complete
121.42
-
-
... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
0.85
-
-
... More
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for all PCC works including cost and conveyance of all materials to work site from approved quarry including cost of cement which will be supplied departmentally including all labour for mixing laying etc Complete
3.9
-
-
... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
8.1
-
-
... More
Collection, supply and laying of gritty gravel within a lead of 1km approved quarry including cost and conveyance etc completed.
12
-
-
... More
Provision for Bitumen Pad
4.5
-
-
... More
Provision for Weep holes
14
-
-
... More
1-C) Construction of Retaining Wall @ Ch-690m
-
-
-
... More
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement per SS 20 B.
31.5
-
-
... More
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
7.88
-
-
... More
Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete
147.01
-
-
... More
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for all PCC works including cost and conveyance of all materials to work site from approved quarry including cost of cement which will be supplied departmentally including all labour for mixing laying etc Complete
50.25
-
-
... More
Collection, supply and laying of gritty gravel within a lead of 1km approved quarry including cost and conveyance etc completed.
22.5
-
-
... More
Provision for Weep holes
8
-
-
... More
1-D) Construction of Retaining Wall @ Ch-1900m
-
-
-
... More
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement per SS 20 B.
31.5
-
-
... More
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
7.88
-
-
... More
Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete
147.01
-
-
... More
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for all PCC works including cost and conveyance of all materials to work site from approved quarry including cost of cement which will be supplied departmentally including all labour for mixing laying etc Complete
50.25
-
-
... More
Collection, supply and laying of gritty gravel within a lead of 1km approved quarry including cost and conveyance etc completed.
22.5
-
-
... More
Provision for Weep holes
8
-
-
... More
1-E) Construction of Well Protection Wall @ CH - 1150M
-
-
-
... More
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement per SS 20 B.
14.63
-
-
... More
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
2.93
-
-
... More
Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete
64.73
-
-
... More
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for all PCC works including cost and conveyance of all materials to work site from approved quarry including cost of cement which will be supplied departmentally including all labour for mixing laying etc Complete
24.43
-
-
... More
Collection, supply and laying of gritty gravel within a lead of 1km approved quarry including cost and conveyance etc completed.
10.5
-
-
... More
Provision for Weep holes
7.5
-
-
... More
Towards the charges for routline maintenance of the road work executed under NABARD including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
-
-
-
... More
For the First Year from the date of completion of work
2.2
-
-
... More
For the Second Year from the date of cpmpletion of work
2.2
-
-
... More
For the Third Year from the date of completion of work
2.2
-
-
... More
For the Fourth Year from the date of completion of work
2.2
-
-
... More
For the Fifth Year from the date of completion of work
2.2
-
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%