Rural Development And Panchayat Raj Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Civil And Construction
Building Construction
Eprocure
Opening Date26 Jul 2022
Closing Date24 Aug 2022
Tender Amount₹ 14,50,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Department officers.

4.37

-

-

... More
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by Department For footing below G.L. ( 1,50 to 4,50 below GL )

13.52

-

-

... More
For Column and Brace upto G.L ( 0 to1,50 below GL )

1.49

-

-

... More
For column and brace I 0 to 4.5m from GL

1.99

-

-

... More
For column and brace II 4.5m to 7.32m from GL

2.46

-

-

... More
For column and brace III 7.32 to 10.98m from GL

2.27

-

-

... More
For column beam floor slab side wall from 10.98m to 14.64 m from GL

11.88

-

-

... More
For side wall, hance and Roof slab from 14.64 m to 18.30 m from GL

2.81

-

-

... More
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding For column footing and GL Brace PLANE SURFACES Below GL

19.94

-

-

... More
GL 0 to 3.30 M For Brace I

9.54

-

-

... More
5.3. to 6.30 m For Brace II

9.01

-

-

... More
6.3. to 7.30 m For Brace II

0.53

-

-

... More
8.3. to 9.30 m For Brace III

9.01

-

-

... More
9.3. to 10.30 m For Brace III

0.53

-

-

... More
3.30 TO 4.30 m Roof slab

13.92

-

-

... More
11.30 to 12.30m For Floor Beam and Bottm of Floor slab

32.06

-

-

... More
SQUARE COLUMN For column Below GL

7.2

-

-

... More
For column GL 0 to 3.30M

13.92

-

-

... More
For column ( 3.31m to 4.30m ).

4.8

-

-

... More
For column ( 4.31m to 5.30m).

4.8

-

-

... More
For Column (5.31m to 6.30m )

3.48

-

-

... More
For Column (6.31m to 7.30m )

3.55

-

-

... More
For Column (7.31m to 8.30m )

3.62

-

-

... More
For Column (8.31m to 9.30m )

4.8

-

-

... More
For Column (9.31m to 10.30m )

4.8

-

-

... More
For Column (10.31m to 11.30m )

4.8

-

-

... More
For Column (11.31m to 11.40m )

0.91

-

-

... More
CURVED SURFACE For Side Wall, & Floor slab sides and Haunch 0 to 3.30 M

104.07

-

-

... More
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by Deparment officers.

44.5

-

-

... More
Painting two coats with approved cement paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete and as directed by Deparment officers

181.04

-

-

... More
Providing MS Ladder & Hand rails arrangements in 60,000 Lits. Capacity OHT With 12.00m Staging Height.

1

-

-

... More
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete cur

1

-

-

... More
Providing manhole cover of size 1x1 0.75 X 0.75 M in RCC 1: 1.5:3 with suitable reinforcement and 5O x 5O x 6mm MS angle fixed along edges and as directed by Department officers.

1

-

-

... More
Providing GI ventilating arrangements mosquito proof nylon net with 50 mm GI pipes and cowl and as directed by Deparment officers

3

-

-

... More
Painting Department emblem 1 x 1 on the SR with enamel paint as per Board's specification and as directed by Deparment officers

1.8

-

-

... More
Supply & Delivery of following Pipes and specials for OHT connection Supply of GI Pipes for OHT Connections 65 mm dia

62

-

-

... More
Supply and Delivery of G.M.Gate valve 65mm size

3

-

-

... More
Supply & Delivery of 65 mm G.I Tee

3

-

-

... More
Supply & Delivery of 65 mm G.I Coupling

12

-

-

... More
Supply & Delivery of 65 mm G.I bend

9

-

-

... More
Supply & Delivery of 90mm T.Coupler PVC

3

-

-

... More
Supply & Delivery of 80mm x 65mm G.I.Reducer

3

-

-

... More
Supply & Delivery of 65mm G.I.flange set

8

-

-

... More
Labour charges for fixing of G.I. Pipes & Specials for OHT pipe connections as directed by the Deparment Officers,

1

-

-

... More
Refilling of the foundation with execavated soil in layers of thick including ramming watering etc., complete as directed by the Department officers

39.53

-

-

... More
Platform Earth work excavation & depositing on bank with an initial lead of 10 metre & initial lift of 2 metre in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil (SS 20B)

5.83

-

-

... More
Sand filling with good river sand including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.

4.05

-

-

... More
Cement concrete in 1:4:8 mix using 40 mm metal used for foundation including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.

1.73

-

-

... More
Cement concrete in 1:2:4 mix using 20 mm metal used for Wearing Coat including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.

1.19

-

-

... More
Brick Work in Cement Mortar 1:5 using Country Bricks including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.

1.17

-

-

... More
Plastering with cement mortar 1:4mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.

6.44

-

-

... More
Filling the stones in soakpit incluiding the cost and conveyance of materials 40mm

0.47

-

-

... More
20mm

0.24

-

-

... More
Rcc Precast rings

3

-

-

... More
Ring and RCC Cover Slab

1

-

-

... More
Providing Name board

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.