Rural Development And Panchayat Raj Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Road Construction
Eprocure
Opening Date26 Dec 2024
Closing Date10 Jan 2025
Tender Amount₹ 78,80,000
Costs
EMD
₹ 79,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Dharmapuri District - Strengthening Of The Road From Nagarkoodal To Paraikottai Road Km 0/0-1/950 H/o Nagarkoodal R441 In Package No.tn04-03 Nabard Xxx -nallampalli Block
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDTN_514045_1Tender No
Roc.No.6150/2023/R2 Road P03Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Picking the Existing BT Surface wornout Surface including all labour charges etc
-
-
-
... More
Km.0/0-1/950
2433.88
-
-
... More
Earthwork excavation and depositing on bank with initial lead of 10 Meter lift of 2.00 Meters in hard gravel soil including cost and conveyane all and labour charges etc., complete as per SS 20A
-
-
-
... More
Km.0/0-1/950
350.48
-
-
... More
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
-
-
-
... More
Km.0/0-1/0
120
-
-
... More
Km.1/0-1/950
113.65
-
-
... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
-
-
-
... More
Km.0/0-1/0
375
-
-
... More
Km.1/0-1/950
355.16
-
-
... More
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
-
-
-
... More
Km.0/0-1/950
7301.62
-
-
... More
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
-
-
-
... More
Km.0/0-1/950
7301.62
-
-
... More
Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
-
-
-
... More
Km.0/0-1/0
93.75
-
-
... More
Km.1/0-1/950
88.79
-
-
... More
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
-
-
-
... More
Km.0/0-1/950
390
-
-
... More
1.5m Span Culvert at Ch.1400 m
-
-
-
... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation
70.27
-
-
... More
Cement concrete in CC 1:4:8 mix using 40mm ISS HBG metal for foundation including watering whenever necessary and laid in layers not more than 15cm thick compacting ect., completed with standard specification and directed by the departmental officers.
9.06
-
-
... More
Cement concrete 1:3:6 mix using Aggregate 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
70.8
-
-
... More
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing etc
2.65
-
-
... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification. (MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
0.35
-
-
... More
Supply and Erection of Steel centering for sides and soffits including cost and conveyance of all labour charges etc., complete complying with standard specifications and as directed.
-
-
-
... More
Below Sill
157.32
-
-
... More
Deck Slab
9.88
-
-
... More
Collection and Supply of Gritty Gravel inlcuding cost of all albour charges etc
46.8
-
-
... More
Provision for Wheepholes
15
-
-
... More
Provision for Expansion Joints (Bitumen Pad)
3.15
-
-
... More
Provision for KM Stones
1
-
-
... More
Provision for HM Stones
8
-
-
... More
Provision for Metal Beam Crash Barrier Type-A "w" Double Guard : Providing and erecting Single sided Double Guard metal Beam crash Barrier system 1.70 cm high, comprising of 3mm thick wall "w" beams posts and spacer channels
shall be made by cold roll forming using HR conform to IS 5986 Fe 410-360 and dip galvanised having Zinc channel vertical post 150x75x5mm spaced 2m centre to centre 312mm x 83mm flange width 350x350x800mm for depth 750mm below ground.All fixing bolts and nuts hot dip galvanised conforming to IS 1367 etc
complete
20
-
-
... More
Provision for Metal Bracket with Type IX
Flourescent Prismatic Reflective Sheeting
suitable for Guard rail it is available one
way/two way.Applied for metal crash
barriers/guard rail to provide reflection across wide range observation.
20
-
-
... More
60Cm Equilaterial Triangle Sign Board
2
-
-
... More
Provision for Name Board
1
-
-
... More
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)
-
-
-
... More
For 1st year maintenance
1
-
-
... More
For 2nd year maintenance
1
-
-
... More
For 3rd year maintenance
1
-
-
... More
For 4th year maintenance
1
-
-
... More
For 5th year maintenance
1
-
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements